2017-02-16 04:51:091) THE POOL HEATER SHALL COMPLY WITH THE 2014
 FBC-ENERGY CODE SEC. R403.9, R403.9.1, R403.9. SUBMIT
 POOL HEATER SPECIFICATIONS THAT SHOW THE HEATER
 COMPLIES WITH THESE CODE REQUIREMENTS. 2ND REQUEST.
 2) HEATED SWIMMING POOLS SHALL BE EQUIPPED WITH A VAPOR
 - RETARDANT COVER ON OR AT THE WATER SURFACE OR A
 LIQUID COVER OR OTHER MEANS PROVEN TO REDUCE HEAT
 LOSS.FBC-ENERGY 403.9.3.
 3) THE TOTAL BTU LOAD SHOWN ON THE GAS PLAN IS 204,000
 BTU'S BUT I CALCULATE 429,000 BTU'S. CLARIFY.
 4) THE SIZING OF THE GAS PIPING SHALL COMPLY WITH 2014
 FBC-FUEL GAS SEC.402.4 USING THE LONGEST LENGTH OF
 PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE BTU LOAD OF THE SECTION. THE MINIMUM
 PIPE SIZE OF THE GALVANIZED LINE ON THE HOUSE SIDE OF
 THE GAS METER SHALL BE A MINIMUM OF 1 1/4 INCHES. SHOW
 THIS ON THE GAS DRAWING.WHERE ARE YOU GETTING THE 10
 FEET FROM? THE "LENGTH IN FEET" COLUMN ON THE GAS TABLE
 MUST BE USED FOR SIZING ALL SECTIONS OF THE GAS SYSTEM.
 SINCE THE PLANS SHOW THE LONGEST RUN AS 32 FEET, THE 40
 FEET COLUMN MUST BE USED FOR SIZING ALL SECTIONS OF
 PIPE.
 5) HEATED SWIMMING POOLS SHALL BE EQUIPPED WITH A VAPOR
 - RETARDANT COVER ON OR AT THE WATER SURFACE OR A
 LIQUID COVER OR OTHER MEANS PROVEN TO REDUCE HEAT
 LOSS.FBC-ENERGY 403.9.3. I REALIZE THIS IS THE
 RESPONSIBILITY OF THE POOL CONTRACTOR AND I WILL PLACE
 THIS NOTE ON YOUR PLANS. YOU DO NOT NEED TO RESPOND TO
 THIS COMMENT.
  
 PLEASE CALL ME TO DISCUSS THESE COMMENTS SO WE CAN TRY
 TO GET THIS PERMIT ISSUED.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved