Plan Review Notes For Permit 17020334 |
Permit Number |
17020334 |
|
Review Stop |
G |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2017-02-10 04:51:55 | 1) THE SUBMITTED SPECIFICATION SHEET FOR THE POOL | | HEATER IS PRINTED IN A FOREIGN LANGUAGE. I CANNOT | | REVIEW DOCUMENTS THAT I CANNOT READ. SUBMIT TWO COPIES | | OF THE MANUFACTURER'S SPECIFICATIONS PRINTED IN THE | | ENGLISH LANGUAGE. WPB AMEND. TO FBC SEC. 107.2.1. | | 2) THE POOL HEATER SHALL COMPLY WITH THE 2014 | | FBC-ENERGY CODE SEC. R403.9, R403.9.1, R403.9. | | 3) HEATED SWIMMING POOLS SHALL BE EQUIPPED WITH A VAPOR | | - RETARDANT COVER ON OR AT THE WATER SURFACE OR A | | LIQUID COVER OR OTHER MEANS PROVEN TO REDUCE HEAT | | LOSS.FBC-ENERGY 403.9.3. | | 4) SUBMIT INFORMATION ON THE TYPE OF PIPE FOR THE | | RISERS COMING OFF THE PE PIPE. SHOW THE PIPE SIZE, TYPE | | OF PIPE MATERIAL, AND SUBMIT THE SIZING TABLE USED FOR | | THESE SECTIONS OF PIPE AT THE METER AND AT THE POOL | | HEATER. | | 5) INDICATE ON THE PLAN IF THE POOL HEATER IS THE ONLY | | GAS APPLIANCE ON THIS SYSTEM. IF NOT, SUBMIT A COMPLETE | | GAS RISER SHOWING ALL PIPE SIZES, TYPE OF PIPE, THE | | DEVELOPED LENGTH TO THE FURTHEST GAS OUTLET, THE BTU | | LOAD OF EACH APPLIANCE, THE PSI OF THE SYSTEM, THE TYPE | | OF GAS AND THE TOTAL BTU LOAD ON THE SYSTEM. THESE | | REQUIREMENTS ALSO APPLY TO A NEW GAS SYSTEM. WPB AMEND. | | TO FBC SEC. 107.2.1. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | |
|