Date |
Text |
2017-02-06 11:52:50 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: PARENTHESIS |
| |
| PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| |
| THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED |
| AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE |
| PROVISO COMMENTS WILL RESULT IN A FAILED FIRE |
| INSPECTION. |
| |
| |
| |
| 1) TEST AT WORKING PRESSURE FOR 2 HOURS PER NFPA 13 |
| |
| 24.2 ACCEPTANCE REQUIREMENTS. |
| |
| 24.2.1* HYDROSTATIC TESTS. |
| |
| 24.2.1.1 UNLESS PERMITTED BY 24.2.1.2 THROUGH 24.2.1.8, |
| ALL PIPING AND ATTACHED APPURTENANCES SUBJECTED TO |
| SYSTEM WORKING PRESSURE SHALL BE HYDROSTATICALLY TESTED |
| AT 200 PSI (13.8 BAR) AND SHALL MAINTAIN THAT PRESSURE |
| WITHOUT LOSS FOR 2 HOURS. |
| |
| 24.2.1.2 PORTIONS OF SYSTEMS NORMALLY SUBJECTED TO |
| SYSTEM WORKING PRESSURES IN EXCESS OF 150 PSI (10.4 |
| BAR) SHALL BE TESTED AS DESCRIBED IN 24.2.1.1, AT A |
| PRESSURE OF 50 PSI (3.5 BAR) IN EXCESS OF SYSTEM |
| WORKING PRESSURE. |
| |
| 24.2.1.6 MODIFICATIONS THAT CANNOT BE ISOLATED, SUCH AS |
| RELOCATED DROPS, SHALL NOT REQUIRE TESTING IN EXCESS OF |
| SYSTEM WORKING PRESSURE. |
| |
| 24.2.1.7 LOSS SHALL BE DETERMINED BY A DROP IN GAUGE |
| PRESSURE OR VISUAL LEAKAGE. |
| |
| |
| PLEASE ENSURE THAT THE FIRE PUMP TEST PRESSURE IS |
| CALCULATING WORKING PRESSURE PER 24.2.1.2 |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |
| |
| |