2017-04-10 13:43:41 | 1) THE LETTER THAT WAS SUBMITTED FROM GLIDDEN SPINA |
| PARTNERS FOR THE OCCUPANT LOAD FOR THE REQUIRED |
| SANITARY FACILITIES IS UNACCEPTABLE. THE NON-ASSEMBLY |
| ROOM NUMBERS ARE LACKING THE CORRESPONDING SQUARE |
| FOOTAGE OF EACH ROOM IN ORDER TO CONFIRM THE NEW |
| OCCUPANT LOAD. WITHOUT THIS INFORMATION I CANNOT |
| DETERMINE THE MINIMUM REQUIRED SANITARY FACILITIES AND |
| THIS FACILITY SHALL COMPLY WITH THE POTTY PARITY |
| REQUIREMENTS AS MANDATED IN THE 2014 FBC-PLUMBING |
| SEC.403.1.3. I DISCUSSED THIS ITEM IN LENGTH WITH THE |
| REPRESENTATIVE FROM GLIDDEN SPINA IN A MEETING AND I |
| PROVIDED CLEAR DIRECTION AS TO WHAT WOULD BE REQUIRED |
| TO MEET THE EXCEPTION LISTED IN SEC. 603.1.3. THE |
| DIRECTION THAT I PROVIDED WAS NOT FOLLOWED AND |
| THEREFORE THE EXCEPTION HAS NOT BEEN MET. 2ND REQUEST. |
| 2) SHT. P5.1 - THE VENT FOR THE TRENCH DRAIN LOCATED IN |
| ROOM #111 DOES NOT COMPLY WITH 2014 FBC-PLUMBING |
| SEC.905.3. THE VENT SHALL CONNECT TO THE HORIZONTAL |
| DRAIN ABOVE THE CENTERLINE OF THE HORIZONTAL DRAIN |
| PIPE. |
| 3) THE POTABLE WATER CONNECTION TO THE BOILER SHALL BE |
| EQUIPPED WITH A BACKFLOW PREVENTER WITH AN INTERMEDIATE |
| VENT COMPLYING WITH ASSA 1012 OR CSA B64.3 PER FBC |
| -PLUMBING SEC. 608.16.2. THE NOTE ON THE PLAN REFERS TO |
| MANUFACTURER REQUIREMENTS. THIS IS A PLUMBING CODE |
| REQUIREMENT AND THE PROPER BACKFLOW DEVICE SHALL BE |
| PROVIDED. 2ND REQUEST. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |
| |