Date Text
2017-03-27 09:42:46GAS REVIEW
  
 1) THE 17" COMBUSTION AIR DUCTS ARE UNDERSIZED FOR THE
 NEW AJAX BOILER WHICH IS SPECIFIED IN THE SUBMITTAL DOC
 TO BE 2,100,000 BTUH. EACH OF THE TWO DUCT OPENINGS
 SUPPLYING COMBUSTION AIR SHALL BE MINIMUM 525 SQ.
 INCHES PER SECTION 304.6.1 FBC-14 FUEL GAS. PLEASE
 CORRECT SHEET M2.1, AND M6.1 WHICH INDICATES THE WRONG
 SIZE BOILER.
 2) THERE IS A DISCREPANCY ON THE BTU LOAD OF THE BOILER
 ON THE MANUFACTURER'S SPECIFICATIONS AND MECHANICAL
 DRAWINGS M2.1 & M6.1 AND THE GAS RISER ON P5.1.
 CLARIFY.
 3) SHT. P5.1 - THE GAS RISER SHOWS THE BOILER AS
 850,000 BTUS AND THE MANUFACTURER'S SPECIFICATIONS
 SHOWS THE BTU LOAD AS 2,100,000 BTU'S. IF THE BOILER IS
 2,100,000 BTU'S THE MINIMUM PIPE SIZE TO THE BOILER
 SHALL BE 2 1/2 INCHES AND THE SIZE OF THE LINE FROM THE
 METER SHALL BE INCREASED TO 3 INCHES. 2014 FBC-FUEL GAS
 TABLE 402.4 (2).
 4) THE GAS LINE TO THE GAS WATER HEATER IS UNDERSIZED.
 THE MINIMUM SIZE SHALL BE 1 1/4 INCHES. 2014 FBC-FUEL
 GAS TABLE 402.4 (2).
 5) THE AJAX BOILER DRAWING # G62200 APPEARS TO SHOW
 VENTS FOR THE SAFETY VALVES COMBINED WITH THE VENTS FOR
 THE GAS REGULATOR. THE VENT FOR THE GAS REGULATOR SHALL
 BE RUN INDEPENDENTLY TO THE OUTDOORS AND SHALL SERVE
 ONLYY A SINGLE DEVICE VENT. 2014 FBC-FUEL GAS SEC.
 410.3.1.
 6) SHT. M2.1 - ROOM #110 - SHOWS A 12 INCH ROUND DUCT
 UP THROUGH THE ROOF BUT IT IS NOT IDENTIFIED AS TO ITS
 PURPOSE. CLARIFY.
  
 THE FOLLOWING ITEMS WILL BE CONSIDERED DEFERRED
 SUBMITTALS. COMPLETE PLANS AND SPECIFICATIONS SHALL BE
 SUBMITTED FOR REVIEW FOR THE FOLLOWING ITEMS PRIOR TO
 THE INSTALLATION OF NOTED SYSTEMS:
 1) BOILER AND ASSOCIATED PIPING AND VENT - SUBMIT AN
 EQUIPMENT SCHEDULE FOR THE BOILER, BOILER VENT PIPE(S),
 AND MANUFACTURER'S SPECIFICATIONS FOR EACH. PROVIDE A
 DIMENSIONAL ELEVATION VIEW THAT SHOWS THE TOTAL VENT
 RUN FROM THE OUTLET OF THE BOILER TO THE TERMINATION
 CAP ABOVE THE ROOF. SHOW HOW THE VENT WILL BE SUPPORTED
 AND ANCHORED TO THE ROOF STRUCTURE.
 2) STEAM PIPING - PROVIDE STEAM PIPING DRAWINGS THAT
 SHOW THE PIPING RUNS, TYPES AND SIZES OF PIPES & PIPE
 INSULATION.
 3) EQUIPMENT SCHEDULE AND PIPING PLAN FOR THE TANKS AND
 KETTLES USED IN THE BREWING PROCESS.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  