2017-02-01 12:51:391ST REVIEW FBC-2014 MECHANICAL
 PERMIT #17010884
 2/1/2017
  
 1 ) M2.1 & M6.1: THE O/A CALCULATION SCHEDULE IS
 INCORRECT. RTU-1 IS CONDITIONING THE BAR AREA, NOT
 RTU-3.
  
 2 ) M6.1: REFER TO TABLE 403.3 AND REVISE THE
 CALCULATION FOR THE BAR AREA TO 100 PERSONS PER 1000
 SF/ 7.5 CFRMS PERSON/ AND 0.18 CFMS PER SF. THE
 CALCULATION SHOULD ADJUST TO 2186 CFMS OF O/A REQUIRED.
 PLEASE NOTE THE INCREASED LOAD MAY REQUIRE INCREASED
 COOLING AND HEATING CAPACITIES FOR RTU-1.
  
 3) THE AC HEATING CALCULATIONS SHOW THE HEAT CAPACITIES
 OF RTU-1 & 2 ARE UNDERSIZED.
  
 4) THE AC CALCULATIONS DO NOT SHOW ANY APPLIANCE OR
 EQUIPMENT LOADS. PLEASE CLARIFY IF THE ADDED HEAT AND
 HUMNIDITY LOAD FROM THE STEAM TANKS AND KETTLES HAVE
 BEEN CALCULATED INTO THE TOTAL LOAD.
  
 5) PROVIDE AN EQUIPMENT SCHEDULE FOR THE BOILER, BOILER
 VENT PIPE, AND SUBMIT MANUFACTURER'S SPECIFICATIONS FOR
 EACH. PROVIDE A DIMENSIONED ELEVATION VIEW THAT
 INDICATES THE TOTAL VENT RUN FROM THE OUTLET OF THE
 BOILER TO THE TERMINATION CAP ABOVE THE ROOF. INDICATE
 HOW THE VENT WILL BE SUPPORTED AND ANCHORED TO THE ROOF
 STRUCTURE.
  
 6) PROVIDE STEAM PIPING DRAWINGS THAT SHOW THE PIPING
 RUNS, TYPES AND SIZES OF PIPE AND PIPE INSULATION.
  
 7) M2.1: PROVIDE A COMBUSTION AIR CALCULATION FOR THE
 BOILER PER SECTION 304 FBC-14 FUEL GAS. IT APPEARS BY
 THE DRAWING THAT THE ONE-PERMANENT-OPENING METHOD IS
 BEING PROVIDED. PLEASE SEE SECTION 304.6.2 AND RELOCATE
 THE OPENING OF THE AIR INTAKE TO A LOCATION WITHIN 12
 INCHES OF THE TOP OF THE ENCLOSURE.
  
 8) PROVIDE AN EQUIPMENT PLAN AND SCHEDULES FOR THE
 BREWERY TANKS AND KETTLES. LABEL EACH PIECE OF
 EQUIPMENT AND SHOW THE REQUIRED WORKING CLEARANCES.
 PLEASE NOTE COMPLIANCE WITH SECTION 1003.1 MAY BE
 REQUIRED FOR THE EQUIPMENT.
  
 9) PROVIDE AN EQUIPMENT SCHEDULE FOR THE CHILLED WATER,
 AND PIPING PLANS THAT SHOW PIPING RUNS, TYPES AND SIZES
 OF PIPES AND PIPE INSULATIONS.
  
 10) PROVIDE STRUCTURAL ENGINEERING FOR INSTALLATION OF
 THE RTU'S INCLUDING THE ROOF OPENING AND
 REINFORCEMENTS, ATTACHMENT OF THE CURB TO THE ROOF
 STRUCTURE, AND MOUNTING THE RTU'S TO THE CURBS- SECTION
 301.15.
  
 11) PLEASE NOTE A SEPARATE PERMIT IS REQUIRED FOR THE
 THE WALK-IN COOLER AND REFRIGERATION SYSTEM.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  