Date |
Text |
2017-02-01 12:51:39 | 1ST REVIEW FBC-2014 MECHANICAL |
| PERMIT #17010884 |
| 2/1/2017 |
| |
| 1 ) M2.1 & M6.1: THE O/A CALCULATION SCHEDULE IS |
| INCORRECT. RTU-1 IS CONDITIONING THE BAR AREA, NOT |
| RTU-3. |
| |
| 2 ) M6.1: REFER TO TABLE 403.3 AND REVISE THE |
| CALCULATION FOR THE BAR AREA TO 100 PERSONS PER 1000 |
| SF/ 7.5 CFRMS PERSON/ AND 0.18 CFMS PER SF. THE |
| CALCULATION SHOULD ADJUST TO 2186 CFMS OF O/A REQUIRED. |
| PLEASE NOTE THE INCREASED LOAD MAY REQUIRE INCREASED |
| COOLING AND HEATING CAPACITIES FOR RTU-1. |
| |
| 3) THE AC HEATING CALCULATIONS SHOW THE HEAT CAPACITIES |
| OF RTU-1 & 2 ARE UNDERSIZED. |
| |
| 4) THE AC CALCULATIONS DO NOT SHOW ANY APPLIANCE OR |
| EQUIPMENT LOADS. PLEASE CLARIFY IF THE ADDED HEAT AND |
| HUMNIDITY LOAD FROM THE STEAM TANKS AND KETTLES HAVE |
| BEEN CALCULATED INTO THE TOTAL LOAD. |
| |
| 5) PROVIDE AN EQUIPMENT SCHEDULE FOR THE BOILER, BOILER |
| VENT PIPE, AND SUBMIT MANUFACTURER'S SPECIFICATIONS FOR |
| EACH. PROVIDE A DIMENSIONED ELEVATION VIEW THAT |
| INDICATES THE TOTAL VENT RUN FROM THE OUTLET OF THE |
| BOILER TO THE TERMINATION CAP ABOVE THE ROOF. INDICATE |
| HOW THE VENT WILL BE SUPPORTED AND ANCHORED TO THE ROOF |
| STRUCTURE. |
| |
| 6) PROVIDE STEAM PIPING DRAWINGS THAT SHOW THE PIPING |
| RUNS, TYPES AND SIZES OF PIPE AND PIPE INSULATION. |
| |
| 7) M2.1: PROVIDE A COMBUSTION AIR CALCULATION FOR THE |
| BOILER PER SECTION 304 FBC-14 FUEL GAS. IT APPEARS BY |
| THE DRAWING THAT THE ONE-PERMANENT-OPENING METHOD IS |
| BEING PROVIDED. PLEASE SEE SECTION 304.6.2 AND RELOCATE |
| THE OPENING OF THE AIR INTAKE TO A LOCATION WITHIN 12 |
| INCHES OF THE TOP OF THE ENCLOSURE. |
| |
| 8) PROVIDE AN EQUIPMENT PLAN AND SCHEDULES FOR THE |
| BREWERY TANKS AND KETTLES. LABEL EACH PIECE OF |
| EQUIPMENT AND SHOW THE REQUIRED WORKING CLEARANCES. |
| PLEASE NOTE COMPLIANCE WITH SECTION 1003.1 MAY BE |
| REQUIRED FOR THE EQUIPMENT. |
| |
| 9) PROVIDE AN EQUIPMENT SCHEDULE FOR THE CHILLED WATER, |
| AND PIPING PLANS THAT SHOW PIPING RUNS, TYPES AND SIZES |
| OF PIPES AND PIPE INSULATIONS. |
| |
| 10) PROVIDE STRUCTURAL ENGINEERING FOR INSTALLATION OF |
| THE RTU'S INCLUDING THE ROOF OPENING AND |
| REINFORCEMENTS, ATTACHMENT OF THE CURB TO THE ROOF |
| STRUCTURE, AND MOUNTING THE RTU'S TO THE CURBS- SECTION |
| 301.15. |
| |
| 11) PLEASE NOTE A SEPARATE PERMIT IS REQUIRED FOR THE |
| THE WALK-IN COOLER AND REFRIGERATION SYSTEM. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |