2017-01-30 16:14:00 | 1ST REVIEW FBC-2014 MECHANICAL |
| PERMIT #17010799 |
| 1/30/17 |
| |
| 1) THE ENERGYGAUGE COMPLIANCE SUBMITTALS FOR BUILDINGS |
| 1 & 3 MUST BE SIGNED AND DATED BY THE OWNER/AGENT- SEE |
| PAGE 3 OF THE DOCUMENTS. |
| |
| 2) PROVIDE AC COOLING AND HEATING CALCULATIONS FOR THE |
| SPLIT AND ROOFTOP SYSTEMS. |
| |
| 3) THE O/A CALCULATIONS ARE INCORRECT FOR THE PATIENT |
| ROOMS. REFER TO TABLE 403.3: 25 CFM PER PERSON |
| REQUIRED. |
| |
| 4) PROVIDE A DETAIL FOR INSTALLATION OF THE CEILING |
| DAMPERS IN THE BLDG. #1 CORRIDORS. |
| |
| 5) A DUCT SMOKE DETECTOR IS REQUIRED IN THE RETURN AIR |
| SYSTEM OF RTU-1 UNLESS IT CAN BE VERIFIED BY |
| MANUFACTURER'S SPECIFICATIONS THAT THE SYSTEM CANNOT |
| EXCEED 2000 CFMS OF SUPPLY AIR. |
| |
| 6) SUBMIT SPECS FOR THE WASHER/DRYER UNITS WITH DRYER |
| VENTING INSTRUCTIONS FOR MULTIPLE UNITS. |
| |
| 7) PROVIDE STRUCTURAL ENGINEERING FOR: A) INSTALLATION |
| OF THE RTU INCLUDING THE ROOF OPENING AND |
| REINFORCEMENT, AND THE CURB AND RTU ATTACHMENTS. B) |
| INSTALLATION OF THE CU WALL BRACKETS- SECTION 301.15. |
| |
| 8) REFER TO SECTION 401.4 AND PROVIDE CLEARANCE |
| DISTANCE MEASUREMENTS FOR THE O/A INTAKE OPENING FOR |
| AHU-3. |
| |
| 9) BASED ON THE STRUCTURAL COMMENTS THE OCCUPANCY |
| CLASSSIFICATION OF THE BUILDING MAY BE IN QUESTION. |
| PLEASE NOTE THAT ADDITIONAL REVIEW COMMENTS MAY OCCUR |
| AFTER THIS ISSUE IS RESOLVED AND CORRECTED PLANS ARE |
| RESUBMITTED. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |