Plan Review Notes For Permit 17010676 |
Permit Number |
17010676 |
|
Review Stop |
M |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2017-02-14 13:43:13 | 1ST REVIEW FBC-2014 MECHANICAL | | PERMIT #17010676 | | 2/14/17 | | | | 1) THE LICENSING SCOPE FOR BOTH A GENERAL CONTRACTOR | | AND A UNDERGROUND UTILITIES CONTRACTOR DOES NOT INCLUDE | | INSTALLATION OF PIPING THAT IS AN INTEGRAL PART OF A | | FIRE PROTECTION SYSTEM BEGINNING AT A POINT WHERE THE | | PIPING IS USED EXCLUSIVELY FOR SUCH SYSTEM- PLEASE SEE | | FL. STATUTES 489.113(2)(D), 489.105(3)(N), AND 633.102. | | | | 2) SHEET C5.02: THE PLAN APPEARS INCOMPLETE FOR THE | | SCOPE OF WORK. PLEASE SHOW THE UNDERGROUND FIRE LINE | | RUN BEGINNING AT THE POINT OF CONNECTION TO THE MAIN | | WATER LINE TO THE BUILDING. PLEASE SHOW THE LOCATION OF | | THE REQUIRED BACK FLOW PREVENTER, AND PROVIDE PIPING | | DETAILS AND SPECIFICATIONS. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | |
|