2017-01-12 12:27:03 | 2001 SOUTH DIXIE HIGHWAY |
| TRACKING #17010266 |
| PERMIT #16041215 |
| REVIEW COMMENTS - FIRE DEPARTMENT |
| |
| FIRE RESCUE HAS NO OBJECTIONS TO THE PRODUCT (DC315 |
| INTUMESCENT PAINT) UTILIZED TO PROTECT THE EXISTING |
| SPRAY POLYURETHANE FOAM (SPF). NOTE THE MANUFACTURER'S |
| APPLICATION REQUIREMENTS ARE VERY SPECIFIC AND REQUIRE |
| DOCUMENTATION. REFERENCE PAINTTOPROTECT.COM DC315. THE |
| PLAN REVIEW HAS BEEN APPROVED FOR THIS PRODUCT; |
| HOWEVER, IN ORDER TO PASS INSPECTION THE MANUFACTURER'S |
| REQUIREMENTS FOR APPLICATION DOCUMENTATION MUST BE |
| PROVIDED. |
| |
| PRODUCT SPECIFICATIONS INDICATE: |
| |
| APPLICATOR SHALL PERFORM CONTINUOUS WET FILM THICKNESS |
| CHECKS, MINIMUM 1 PER 100 SQUARE FEET. MEDALLIONS SHALL |
| BE INSTALLED AT MINIMUM OF 1 PER 400 SQUARE FEET AND |
| SHALL BE MAINTAINED WITH CONTRACT DOCUMENTS FOR |
| VERIFICATION OF DRY FILM THICKNESS. APPLICATOR SHALL |
| COMPLETE A JOB WORK REPORT THAT INCLUDES AMBIENT |
| CONDITIONS, APPLICATION THICKNESS AND RESULTS OF |
| ADHESION TESTING. UPON COMPLETION, A JOB SITE LABEL |
| SHALL BE AFFIXED IN AN AREA SUCH AS THE ELECTRICAL |
| PANEL AND SHALL INCLUDE APPLICATOR NAME AND CONTACT |
| INFORMATION, COMPANY INFORMATION, PRODUCTS USED, |
| MEASURED APPLICATION THICKNESS. JOB WORK REPORTS MUST |
| BE SUBMITTED TO IFRM MANUFACTURER WITHIN 7 DAYS OF |
| COMPLETION OF PROJECT. |
| |
| REQUIRED SURFACES SHALL BE PRIMED WITH A COMPATIBLE |
| PRIMER APPROVED BY THE THIN-FILM FIRE RESISTIVE |
| MATERIALMANUFACTURER. |
| |
| THE THIN-FILM FIRE RESISTIVE MATERIAL SHALL BE APPLIED |
| AT THE REQUIRED DRY FILM THICKNESS PER THE APPROPRIATE |
| SPF TEST REPORT AND MANUFACTURERS WRITTEN APPLICATION |
| INSTRUCTIONS. |
| |