Date |
Text |
2017-01-10 03:31:33 | 1) THE SUBMITTED GAS PLAN NOTES AN "EXISTING " GAS |
| METER. INDICATE ON THE PLAN IF THE TANKLESS WATER |
| HEATER IS THE ONLY GAS APPLIANCE ON THIS SYSTEM? IF |
| NOT, SUBMIT A GAS RISER SHOWING ALL GAS APPLIANCES ON |
| THE SYSTEM, THE BTU LOAD OF EACH APPLIANCE AND THE |
| LONGEST LENGTH OF PIPING FROM THE POINT OF DELIVERY TO |
| THE MOST REMOTE OUTLET AND THEBTU LOAD OF EACH SECTION |
| OF PIPE. |
| 2) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| LOCATION OF THE TANKLESS WATER HEATER IN RELATION TO |
| THE LOCATION OF ANY OPERABLE DOORS OR WINDOWS AND SHOW |
| THE DISTANCES TO SUCH DOORS AND WINDOWS.THE LOCATION OF |
| THE WATER HEATER SHALL COMPLY WITH THE MANUFACTURER'S |
| INSTALLATION INSTRUCTIONS. SUBMIT TWO COPIES OF THE |
| PAGE(S) FROM THE INSTALLATION MANUAL THAT SHOWS AND |
| LIST(S) THE REQUIRED DISTANCES FROM THE WATER HEATER TO |
| THE DOORS AND WINDOWS. |
| 3) INDICATE ON THE PLAN IF THE TANKLESS WATER HEATER IS |
| REPLACING AN EXISTING TANKLESS WATER HEATER OR IS IT |
| REPLACING A STORAGE TANK TYPE WATER HEATER OR IS IT |
| BEING ADDED TO THE EXISTING HOT WATER SYSTEM? INDICATE |
| ON THE APPLICATION IN THE DESCRIPTION OF WORK AND ON |
| THE PLANS. |
| 4) IS THIS TANKLESS WATER HEATER BEING ADDED TO AN |
| EXISTING GAS SYSTEM? IF SO, SUBMIT A COMPLETE GAS RISER |
| SHOWING ALL GAS APPLIANCES CONNECTED TO THE SYSTEM |
| ALONG WITH ALL PIPE SIZES, TYPE OF PIPE, THE DEVELOPED |
| LENGTH TO THE FURTHEST GAS OUTLET, THE BTU LOAD OF EACH |
| APPLIANCE, THE PSI OF THE SYSTEM, TYPE OF GAS AND THE |
| TOTAL BTU LOAD ON THE SYSTEM. |
| 5) THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE |
| ADDED INTO THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE |
| THE EXISTING SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, |
| THE EXISTING SYSTEM MUST BE REDONE TO ENSURE A SAFE |
| OPERATING SYSTEM. FGC SECS. 401.4, 401.8, 402.1, 402.2, |
| 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1, G2413.2, |
| G2413.3. |
| 6) A SEPARATE PERMIT IS REQUIRED FOR ANY ELECTRIC WORK |
| THAT MAY NEED TO BE DONE, |
| 7) A SEDIMENT TRAP IS REQD. ON THE GAS LINE TO THE |
| WATER HEATER PER 2014 FBC-FUEL GAS 408.4, 2014 |
| FBCR-SEC. G2419.4. |
| 8) A SHUTOFF VALVE FOR THE APPLIANCE SHALL BE INSTALLED |
| IN ACCORDANCE WITH 2014 FBCR SEC. G2420.5, 2014 |
| FBC-FUEL GAS SEC.409.5. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |
| |
| |