Date |
Text |
2017-02-07 03:27:57 | 1) THE NARRATIVE RESPONSE TO PLUMBING REVIEW COMMENT # |
| 1 REFERS TO DETAIL 1 / SHT.A-1.01 FOR TOILET STALL |
| DIMENSIONS. I COULD NOT FIND ANY OF THE REQUESTED |
| INFORMATION/ DIMENSIONS ON DETAIL 1 / SHT. A-1.01 - |
| CLARIFY.THE REQUIRED DIMENSIONS OF THE STANDARD TOILET |
| STALLS SHALL BE A MINIMUM OF 30 INCHES WIDE BY 60 |
| INCHES DEEP PER 2014 FBC-PLUMBING SEC.405.3.1. 2ND |
| REQUEST. NOTE: I FOUND A STALL DIMENSION ON SHT.A-4.01 |
| IN THE MEN'S TOILET ROOM. PLEASE NOTE THIS AS A TYPICAL |
| DIMENSION FOR THE STANDARD STALLS. |
| 2) PLUMBING PLAN REVIEW COMMENT # 3 - THE NARRATIVE |
| RESPONSE TO PLUMBING REVIEW COMMENT #3 REFERS TO |
| DETAILS # 1 & # 2 ON SHT. A-1.01. DETAIL # 2 SHOWS A |
| GAZEBO WITH NO PLUMBING FIXTURES IN IT SO I HAVE NO |
| IDEA WHAT THIS RESPONSE APPLIES TO. DETAIL #1 DOES NOT |
| PROVIDE THE REQUIRED INFORMATION. COMPLY WITH 2014 |
| FBC-ACCESS. SECS.604.5, 604.5.1, & 604.5.2.ALSO, REFER |
| TO FIGURES 604.5.1 & 604.5.2.YOU WILL FIND THE |
| REQUESTED INFORMATION IN THESE FIGURES. 2ND REQUEST. |
| 3) SHT. A-4.01 SHOWS THE HANDICAPPED ACCESSIBLE TOILET |
| COMPARTMENTS AS 7'-0". THE MINIMUM WIDTH SHALL BE 7'-1" |
| IF BUILT PERFECT. 7'-2" ALLOWS FOR CONSTRUCTION |
| TOLERANCES. |
| 4) SHT.A-1.01 SHOWS A CLOUDED REFERENCE TO DETAIL # 3 / |
| SHT. A-1.01. THERE IS NO SUCH DETAIL ON A-1.01. PLEASE |
| REVISE WITH THE CORRECT SHEET, SHT. A-4.01. |
| 5) PLUMBING PLAN REVIEW COMMENT #5 - THE NARRATIVE |
| RESPONSE REFERS TO DETAIL #3/SHT. A-2.01 FOR THE |
| DRINKING FOUNTAINS. THERE IS NO DETAIL #3 ON THIS SHEET |
| AND THE REQUIRED KNEE AND TOE CLEARANCES ARE NOT SHOWN. |
| CLARIFY. 2ND REQUEST. SHOW THE REQUIRED KNEE AND TOE |
| CLEARANCE FOR THE DRINKING FOUNTAIN PER 2014 |
| FBC-ACCESS. SEC.306. 2ND REQUEST. I FOUND THE DRINKING |
| FOUNTAIN ELEVATIONS ON SHT. A-3.01. PLEASE CORRECT THE |
| REFERENCE SHEET. |
| 6) SHT. E1.1 REFERS TO A LIFT STATION. SUBMIT COMPLETE |
| DETAILS FOR THE LIFT STATION INCLUDING PIPING DETAILS, |
| WHERE AND HOW THE STATION CONNECTS TO THE MAIN SANITARY |
| SYSTEM. WPB AMEND. TO FBC SEC. 107.2.1.THE NARRATIVE |
| RESPONSE STATES THAT THE CITY OF WEST PALM BEACH |
| ENGINEERING SERVICES DEPARTMENT IS PERFORMING A REVIEW |
| OF THE LIFT STATION THIS IS FINE BUT THE PLANS/ SPECS |
| AND DETAILS MUST ALSO BE REVIEWED BY THE PLUMBING |
| SECTION OF THE CONSTRUCTION SERVICES DIVISION AS THE |
| 2014 FBC-PLUMBING SEC.712 APPLIES TO THIS INSTALLATION |
| AND THEREFORE MUST BE REVIEWED FOR COMPLIANCE. 2ND |
| REQUEST. |
| 7) FLOOR PLANS SHOW A SERVICE/PUMP ROOM. SUBMIT DETAILS |
| FOR THE PUMP & PIPING THAT WILL BE INSTALLED. PB AMEND. |
| TO FBC SEC. 107.2.1. |
| 8) SHT. FSP - SITE PLAN KEY LISTS A TOTAL OF THREE |
| DRINKING FOUNTAINS BUT ONLY THE DRINKING FOUNTAINS AT |
| THE MAIN PAVILLION ARE SHOWN ON THE SANITARY AND WATER |
| RISERS. CLARIFY.REFER TO THE DRINKING FOUNTAIN BY THE |
| SHADE STRUCTURE AT THE PLAYGROUND. |
| 9) SHUTOFF VALVES SHALL BE INSTALLED ON ALL WALL |
| HYDRANTS / HOSE BIBBS. 2014 FBC-PLUMBING SEC.606.2 ( |
| 2). |
| 10) A FULL - OPEN VALVE SHALL BE INSTALLED ON THE WATER |
| SUPPLY PIPE TO THE WATER HEATER. 2014 FBC-PLUMBING |
| SEC.606.1 (8). |
| 11) IF THE DEVELOPED LENGTH OF HOT OR TEMPERED WATER |
| PIPING EXCEEDS 50 FEET FROM THE SOURCE OF HOT WATER TO |
| THE FIXTURES THAT REQUIRE HOT OR TEMPERED WATER, A HOT |
| WATER RECIRCUATING LINE SHALL BE REQUIRED. 2014 |
| FBC-PLUMBING SEC.607.2. |
| 12) THE APPROVED SITE PLAN AND SHT. C3.02 SHOW A SPLASH |
| PAD AND A SHOWER. IF THESE WILL BE DONE UNDER A |
| SEPARATE PERMIT PLEASE NOTE SUCH ON THE PLAN. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |
| |
| |
| |