2017-11-14 07:55:15 | 2ND REVIEW FBC-2014 MECHANICAL |
| PERMIT #16120363 |
| 11/14/17 |
| |
| PLAN REVIEW RESULTS: DENIED. |
| |
| SOME OF THE COMMENTS FROM THE 1ST REVIEW WERE ADDRESSED |
| AND STILL EXIST. I HAVE REPRINTED THOSE COMMENTS BELOW |
| WITH ADDITIONAL REMARKS BASED ON THE NARRATIVE RESPONSE |
| FROM KAMM ENGINEERING |
| |
| 2) S-2: REFER TO TABLE 1509.6.5 FBC-14 BUILDING: |
| MINIMUM 48 INCHES CLEARANCE DISTANCE REQUIRED BELOW THE |
| NEW TOWER. (KAMM'S RESPONSE- "TO BE PROVIDED BY |
| STRUCTURAL ENGINEER"). |
| |
| 4) PROVIDE DETAILS AND DRAWINGS FOR THE ACCESS LADDER |
| AND SERVICE PLATFORM- SEE SECTIONS 304.11, 306.1, & |
| 306.5. *(KAMM'S RESPONSE- "NOT REQUIRED PER |
| MANUFACTURER'S DRAWINGS".) |
| |
| 5) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE TOWER. |
| (KAMM'S RESPONSE- "TO BE PROVIDED BY THE CONTRACTOR"). |
| |
| 6) COMMISSIONING OF THE SYSTEM IS REQUIRED IN |
| ACCORDANCE WITH SECTION C408.2 FBC-14 ENERGY |
| CONSERVATION. PLEASE SUBMIT A COMMISSIONING PLAN IN |
| COMPLIANCE WITH SECTION C408.2.1. (KAMM'S RESPONSE- |
| "COMMISSIONING IS NOT REQUIRED PER SECTION C101.4.8 |
| FBC-14 ENERGY CONSERVATION"). IT IS AGREED THAT THE |
| BUILDING IS EXEMPT, HOWEVER THE NEW COOLING TOWER, |
| PUMPS, TREATMENT |
| |
| SYSTEM, AND NEW PIPINGS MUST BE TESTED TO VERIFY WATER |
| TEMPERATURES AND FLOWS ARE PER PLAN AND SPECIFICATIONS. |
| PLEASE PROVIDE A NARRATIVE CLARIFYING WHAT TESTING WILL |
| BE PERFORMED ON THE NEW EQUIPMENT- SECTION C408.2 |
| MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION |
| REQUIREMENTS. |
| |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| KEEP THEM WITH THE SUBMITTALS. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |