Date |
Text |
2016-12-30 09:34:11 | FAILED |
| |
| 1) THE PLANS SHOW THE RELOCATION OF THE ABOVE GROUND |
| TANK FROM A LOCATION HIDDEN FROM PUBLIC BEHIND THE |
| BUILDING TO A PUBLICALLY VISIBLE AREA ON THE SIDE OF |
| THE SITE. PLEASE EXPLAIN THIS PROPOSED CHANGE. ZONING |
| STAFF DOES NOT CURRENTLY SUPPORT THIS RELOCATION. IF |
| THE RELOCATION IS APPROVED BY ZONING STAFF, THEN: |
| |
| A. SHEET ASP DOES NOT SHOW SCREENING FOR THE RELOCATED |
| ABOVE GROUND TANK OR THE PUMP. |
| B. THE LOADING ZONE HAS NOW BEEN MOVED INTO THE EXIT |
| DRIVE AREA. PROVIDE DIMENSIONS ON THE PLAN TO VERIFY |
| THAT THERE IS SUFFICIENT DRIVEWAY WIDTH FOR A CAR TO |
| EXIT THE SITE WHILE A VEHICLE IS PARKED IN THE LOADING |
| ZONE. |
| |
| 2) THERE ARE DISCREPANCIES BETWEEN SHEET ASP AND THE |
| CIVIL SHEETS. ALL PLANS SHALL SHOW THE SAME CONDITIONS. |
| EXAMPLES: |
| |
| A. SOME OF THE LIGHT POLES ARE NOT SHOWN IN THE SAME |
| LOCATION ON BOTH SETS OF PLANS (CONFLICT WITH |
| ELECTRICAL SITE PLAN AS WELL). |
| B. THE CIVIL PLANS SHOW A PROPOSED WATER METER AND A |
| BACKFLOW PREVENTER ON THE SOUTHEAST CORNER OF THE SITE, |
| WHICH ARE NOT SHOWN ON THE ARCHITECTURAL SITE PLAN. |
| C. THE FIRE HYDRANT IS NOT SHOWN ON SHEET ASP. |
| |
| 3) THE REVISED PLANS SHOW THAT THE PARKING SPACES HAVE |
| ADDED CURBS AND ARE STRIPPED AT 18 FEET IN DEPTH. THE |
| APPROVED PLANS SHOWED 16 FEET IN DEPTH WITH A TWO FOOT |
| OVERHANG AT THE CURB. WHERE DID THE EXTRA TWO FEET COME |
| FROM? THE BUILDING SETBACK AND THE DRIVE AISLE SEEM TO |
| BE THE SAME AS THE PERMIT AND SITE PLAN APPROVED PLANS. |
| ADDITIONALLY, THE CROSS SECTIONS SHOW THE NORTH |
| PROPERTY LINE LANDSCAPE AREA FOUR FEET LESS IN WIDTH |
| THAN THE APPROVED PERMIT CROSS-SECTION. NO EXPLANATION |
| IS GIVEN FOR THESE CHANGES. |
| |
| 4) PLEASE EXPLAIN HOW THE LANDSCAPE BUFFER WILL BE |
| INSTALLED WITH THE NEW 3:1 SLOPE BERM AND DITCH ALONG |
| THE NORTH PROPERTY LINE. |
| |
| 5) DUE TO THE CHANGES TO THE PLANS, PRIOR TO THE |
| ISSUANCE OF A CO OF THE BUILDING, AS BUILT SITE, CIVIL |
| AND LANDSCAPE PLANS SHALL BE SUBMITTED TO THE PLANNING |
| DIVISION AS PART OF A MINOR SITE PLAN AMENDMENT. |
| |
| 6) THE FOLLOWING ADDITIONAL SEPARATE PERMITS, WITH |
| PLANS, ARE REQUIRED: |
| |
| A. CONSTRUCTION FENCE - PLEASE NOTE SCREENING IS |
| REQUIRED. |
| B. PARKING LOT STRIPING |
| C. IRRIGATION |
| D. BICYCLE RACK |
| E. PERMANENT FENCE AND GATES |
| F. LANDSCAPE. THE TRANSFORMER SHALL BE SHOWN ON THE |
| LANDSCAPE PLANS. |
| G. SITE LIGHTING. PHOTOMETRICS SHALL BE INCLUDED. |
| |
| 7) PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY, ALL |
| GROUND MOUNTED UTILITY EQUIPMENT SHALL BE SCREENED FROM |
| PUBLIC VIEW. THE PLANS SHALL SHOW HOW THIS OCCURS. |
| |
| PLEASE CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
| |