Date |
Text |
2016-12-01 14:15:41 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| |
| THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED |
| AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE |
| PROVISO COMMENTS WILL RESULT IN A FAILED FIRE |
| INSPECTION. |
| |
| |
| |
| 1) THERE ARE 43 NEW HEADS AND NEW PIPING THAT IS MORE |
| THAN RELOCATED DROPS. |
| |
| PER NFPA 13, ISOLATE AND TEST AT 200PSI FOR 2 HRS. |
| |
| 24.2 ACCEPTANCE REQUIREMENTS. |
| 24.2.1* HYDROSTATIC TESTS. |
| 24.2.1.1 UNLESS PERMITTED BY 24.2.1.2 THROUGH 24.2.1.8, |
| ALL PIPING AND ATTACHED APPURTENANCES SUBJECTED TO |
| SYSTEM WORKING PRESSURE SHALL BE HYDROSTATICALLY TESTED |
| AT 200 PSI (13.8 BAR) AND SHALL MAINTAIN THAT PRESSURE |
| WITHOUT LOSS FOR 2 HOURS. |
| 24.2.1.2 PORTIONS OF SYSTEMS NORMALLY SUBJECTED TO |
| SYSTEM WORKING PRESSURES IN EXCESS OF 150 PSI (10.4 |
| BAR) SHALL BE TESTED AS DESCRIBED IN 24.2.1.1, AT A |
| PRESSURE OF 50 PSI (3.5 BAR) IN EXCESS OF SYSTEM |
| WORKING PRESSURE. |
| 24.2.1.4 MODIFICATIONS AFFECTING 20 OR FEWER SPRINKLERS |
| SHALL NOT REQUIRE TESTING IN EXCESS OF SYSTEM WORKING |
| PRESSURE. |
| 24.2.1.5 WHERE ADDITION OR MODIFICATION IS MADE TO AN |
| EXISTING SYSTEM AFFECTING MORE THAN 20 SPRINKLERS, THE |
| NEW PORTION SHALL BE ISOLATED AND TESTED AT NOT LESS |
| THAN 200 PSI (13.8 BAR) FOR 2 HOURS. |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |