2016-11-26 03:53:48 | 1. SUBMIT AN ISOMETRIC DRAWING FOR ALL CHANGES BEING |
| MADE TO THE EXISTING GAS PIPING SYSTEM AND THAT CLEARLY |
| SHOWS THE LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 |
| FBC-FUEL GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES |
| SEC. G2413. |
| |
| 2. SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| CORRUGATED STAINLESS STEEL TUBING |
| |
| (IF APPLICABLE) FOR EACH PIPE SIZE. WPB AMENDMENTS TO |
| FBC SEC.107.2.1. |
| |
| 3. TYPE OF GAS (LP OR NATURAL). |
| |
| 4. BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON |
| THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS SECS.401.8 |
| THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 (37) OR |
| 2014 FBC-RES. SEC. G2413. |
| |
| 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2014 |
| FBC-FUEL GAS SEC.402.4.1 OR 2014 FBC-RES. SEC. G |
| 2413.3. |
| |
| 6. INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. |
| SEC. G2413.2. . |
| |
| 7. INDICATE ON THE PLAN IF THE TANKLESS WATER HEATER IS |
| THE ONLY GAS APPLIANCE ON THIS SYSTEM? IF NOT, SUBMIT A |
| GAS RISER SHOWING ALL GAS APPLIANCES ON THE SYSTEM, THE |
| BTU LOAD OF EACH APPLIANCE AND THE LONGEST LENGTH OF |
| PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE |
| OUTLET AND THE LOAD OF EACH SECTION. |
| |
| 8 SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION |
| OF ANY OPERABLE DOORS OR WINDOWS. THE LOCATION OF THE |
| WATER HEATERS SHALL COMPLY WITH THE MANUFACTURER'S |
| INSTALLATION INSTRUCTIONS FOR THE MINIMUM REQUIRED |
| DISTANCE FROM OPERABLE WINDOWS AND DOORS.. |
| |
| 9 SUBMIT TWO COPIES OF THE SIZING TABLES USED IN THE |
| DESIGN FOR THIS GAS SYSTEM OR PLACE A NOTE ON BOTH SETS |
| OF PLANS LISTING THE SIZING TABLES FROM THE GAS CODE |
| THAT WERE USED IN THE DESIGN OF THIS SYSTEM. FGC |
| SEC.402.3, FBCR SEC. G 2413.3. |
| |
| 10 THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE |
| ADDED INTO THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE |
| THE EXISTING SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, |
| THE EXISTING SYSTEM MUST BE REDONE TO ENSURE A SAFE |
| OPERATING SYSTEM. FGC SECS. 401.4, 401.8, 402.1,402.2, |
| 402.3 , FBCR SECS.G2412.4, G2412.8, G2413.1, G2413.2, |
| G2413.3. |
| |