2016-11-27 04:50:32 | 1) SHT. CVR OF 10 - THE OCCUPANCY CLASSIFICATION IS |
| LISTED AS "IIIB". THIS IS A MIXED OCCUPANCY. LIST ALL |
| APPLICABLE OCCUPANCY TYPES AND THE CORRESPONDING |
| OCCUPANT LOAD FOR EACH AREA IN ACCORDANCE WITH 2014 FBC |
| CHAPTER 3 AND SEC.1004. |
| 2) THIS IS A CHANGE OF OCCUPANCY AND SHALL COMPLY WITH |
| THE PLUMBING FIXTURE REQUIREMENTS OF THE 2014 |
| FBC-PLUMBING, LIST THE PREVIOUS OCCUPANCY ON THE PLANS. |
| TABLE 403.1. |
| 3) DRINKING FOUNTAINS ARE REQUIRED PER 2014 |
| FBC-PLUMBING TABLE 403.1. A MINIMUM OF 2 DRINKING |
| FOUNTAINS ARE REQUIRED PER TABLE 403.1 FOOTNOTE (E) AND |
| 2014 FBC-ACCESS. SEC.211.2. SUBMIT ELEVATION DETAILS. |
| 4) THE BREAK ROOM SINK SHALL COMPLY WITH THE 2014 |
| FBC-ACCESS. SECS.212, 606 AND 305. SHOW THE HEIGHT OF |
| THE TOP OF THE COUNTERTOP FROM THE FINISH FLOOR AND THE |
| REQUIRED CLEAR FLOOR SPACE FOR THE SINK. |
| 5) A SERVICE SINK IS REQUIRED PER 2014 FBC-PLUMBING |
| TABLE 403.2. |
| 6) SEPARATE FACILITIES ARE REQUIRED FOR MALES AND |
| FEMALES PER TABLE 403.1 OF 2014 FBC-PLUMBING. |
| 7) SHT. A-3 DETAIL 4 (A) - THE PLACEMENT OF THE GRAB |
| BAR ON THE REAR WALL SHALL COMPLY WITH 2014 FBC- |
| ACCESS. SEC. 604.5.2 & FIGURE 504.5.2. |
| 8) THE GRAB BARS SHALL BE MEASURED TO THE TOP OF THE |
| GRIPPING SURFACE PER THE2014 FBC-ACCESS. SEC. 609.4. |
| 9) SHT.A-3 - DETAIL 5 - SHOWS THE TOP OF THE LAVATORY |
| AT 40 INCHES ABOVE THE FINISH FLOOR AND 34 INCHES IS |
| SHOWN TO THE BACKSPLAS. THE MAXIMUM HEIGHT OF THE |
| LAVATORY SHALL COMPLY WITH 2014 FBC- ACCESS. SEC.606.3. |
| 10) THE FLUSH HANDLE FOR THE WATER CLOSET SHALL BE |
| LOCATED ON THE OPEN SIDE OF THE WATER CLOSET. |
| FBC-ACCESS. SEC.604.6. |
| 11) SHT.A-3 DETAIL 6 REFERENCES THE 2010 FBC. THIS |
| SCOPE OF WORK SHALL COMPLY WITH 2014 FBC. |
| 12) THE WALL FINISH IN THE NEW TOILET ROMM SHALL COMPLY |
| WITH 2014 FBC SEC. 1210. |
| 13) SUBMIT A SANITARY AND WATER RISER FOR REVIEW THAT |
| SHOWS ALL PLUMBING FIXTURES (DRINKING FOUNTAIS, MOP |
| SINK, BREAK ROOM SINK, WASHER, DOG WASH TUBS, WATER |
| HEATER). |
| 14) WILL THERE BE ANY HOSE BIBBS INSTALLED FOR WASHING |
| DOWN THE DOG AREAS? IF SO, SHOW THEM ON THE WATER |
| RISER. EACH HOSE BIBB SHALL BE EQUIPPED WITH SEPARATE |
| SHUTOFF VALVE. FPC SEC.606.2. |
| 15) HOT WATER IS REQUIRED TO THE NEW MOP SINK. 2014 FPC |
| SEC.607.1. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |
| |
| |