Plan Review Notes For Permit 16090660 |
Permit Number |
16090660 |
|
Review Stop |
G |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2017-04-26 13:45:19 | 1) SUBMIT TWO COPIES OF ALL DOCUMENTS BEING SUBMITTED | | FOR A PERMIT INCLUDING ANOTHER SIGNED & SEALED DRAWING | | FOR THE ANCHORING OF THE LP TANK. WPB AMEND. TO FBC | | SEC.107.1. | | 2) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS | | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE | | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2014 | | FBC-FUEL GAS SEC.402.4.1 OR 2014 FBC-RES. SEC. G | | 2413.3. | | 3) SHOW THE LENGTHS OF ALL CUT SECTIONS OF PIPE PER | | 2014 FBC-FUEL GAS, SECS. 402.4.1, 402.4.2. OR 2014 | | FBC-RES SEC. G2413. | | 4) SHOW THE TYPE OF MATERIAL AND PIPE SIZES TO THE | | EXISTING DRYER AND COOKTOP. 2014 FGC SECS. 401.3 & | | 401.4. THE EXISTING SYSTEM BTU LOAD MUST BE ADDED TO | | THE NEW BTU LOAD TO ENSURE THE ENTIRE EXISTING SYSTEM | | IS SIZED PROPERLY FOR THE TOTAL BTU LOAD. | | 5) SUBMIT TWO COPIES OF THE SIZING TABLES USED IN THE | | DESIGN FOR THIS GAS SYSTEM OR PLACE A NOTE ON BOTH SETS | | OF PLANS LISTING THE SIZING TABLES FROM THE GAS CODE OR | | OTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS | | SYSTEM. FGC SEC.402.3, FBCR SEC. G 2413.3. | | | | |
|