2016-09-02 04:57:48 | 1) THE PLANS ON RECORD SHOW A GAS DRYER BUT IT IS NOT |
| SHOWNON THE GAS DRAWING. CLARIFY. |
| 2) SUBMIT A PLAN OF THE HOUSE SHOWING THE PROPOSED |
| LOCARION OF THE FUTURE TANKLESS WATER HEATER IN |
| RELATION TO OPERABLE WINDOWS AND DOORS IN THE |
| STRUCTURE. THE TANKLESS WATER HEATER SHALL COMPLY WITH |
| THE MANUFACTURER'S INSTALLATION INSTRUCTIONS IN REGARDS |
| TO THE MINIMUM REQUIRED DISTANCES FROM OPERABLE DOORS, |
| WINDOWS AND SOFFIT VENTS. |
| 3) SHOW THE CORRESPONDING EHD OF THE CSST. THERE ARE |
| TWO DIFFERENT EHD'S WITH THE CSST AND EACH ONE CARRIES |
| A DIFFERENT BTU LOAD. SEE 2014 FGC TABLE 402.4 (15). |
| 4) IF THE GAS DRYER IS ADDED TO THE SYSTEM THE PIPE |
| SIZES SHALL BE RECHECKED AS THEY MAY BE UNDERSIZED WITH |
| THE ADDED BTU LOAD. |
| 5) SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2014 |
| FBC-FUEL GAS CODE SEC.304.1 OR 2014 FBC-RES. SEC. G |
| 2407. |
| 6). SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 |
| FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. |
| 7) SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND |
| TERMINATION OF THE GAS VENTS PER 2014 FBC-FUEL GAS |
| SECS. 502 THRU 505 OR 2014 FBC-RES. SEC.G2426. |
| |
| |
| |