Plan Review Notes
Plan Review Notes For Permit 16081096
Permit Number 16081096
Review Stop M
Sequence Number 2
Notes
Date Text
2016-10-28 12:12:412ND REVIEW FBC-2014 MECHANICAL
 PERMIT #16081096
 10/28/16
  
 1) THE AC CALCULATIONS FOR RTU-3A INDICATE 8.6 KW HEAT
 REQUIRED, THE SCHEDULE INDICATES 4.0 KW PROVIDED. RTU-
 3B- 11.66 KW REQUIRED, 6.0 KW PROVIDED.
  
 2) SHEET M1.1: IT APPEARS THAT THERE IS NO WAY FOR THE
 AIR SUPPLIED TO ALL THE FLEX, OFFICE, SALES, MANGEMENT
 ROOMS ETC. TO RETURN TO RTU-1. THE ARCHITECTURAL
 DRAWINGS APPEAR TO INDICATE THE FRAMED AND GLASS WALLS
 ARE SPANNING FROM FLOOR TO UNDERSIDE OF DECK WHICH
 WOULD CLOSE OFF THE AIRWAYS- SEE SHEETS A1.1, A3.1.2, &
 A5.0.1.
  
 3) IN RESPONSE TO COMMENT #13 FROM THE 1ST REVIEW, THE
 ENGINEER IS REQUESTED THE WIND LOAD ENGINEERING FOR
 ANCHORING THE NEW RTU'S TO BE DEFERRED SUBMITTALS WHICH
 IS ACCEPTED. PLEASE REVIEW THE FOLLOWING REQUIREMENTS
 PER SECTION 107.3.4.2 WPB AMENDMENTS TO THE FBC:
  
 A) DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS
 SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE
 PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE
 TIME OF THE
 APPLICATION AND THAT ARE TO BE SUBMITTED TO THE
 BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL
 OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF
 THE BUILDING OFFICIAL. THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE
 DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR
 REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
  
 B)107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE
 REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND
 APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR TO
 SUBMITTAL FOR JURISDICTIONAL APPROVAL.
 FROM THE 1ST REVIEW, THE ENGINEER IS REQUESTED THE WIND
 LOAD ENGINEERING FOR ANCHORING THE NEW RTU'S TO BE
 DEFERRED SUBMITTALS. PLEASE REVIEW THE FOLLOWING
 REQUIREMENTS PER SECTION
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  