Date |
Text |
2016-11-16 08:20:06 | RESIDENTIAL (R3) CHANGE OF USE/ALTERATION SECOND |
| BUILDING REVIEW CHECKLIST. |
| CODE: FBC 5TH EDITION (2014). |
| |
| ORIGINAL COMMENT: |
| 1- PROVIDE ENERGY CALCULATIONS (2 COPIES) AS REQUIRED |
| BY SEC. R101.4.3 FBC-ENERGY CONSERVATION, 5TH EDITION |
| (2014). |
| NOTE: NEED ENERGY CALCULATIONS FOR EACH SEPARATE |
| STRUCTURE. |
| |
| RESPONSE: |
| ONLY THE ENERGY CALCULATIONS FOR THE MAIN HOUSE WERE |
| SUBMITTED. THERE WERE NOT CALCULATIONS SUBMITTED FOR |
| THE GARAGE THAT IS PROPOSED TO BE CONVERTED TO LIVING |
| SPACE. NEED TO PROVIDE THE ENERGY CALCULATIONS FOR THE |
| GARAGE CONVERSION. |
| NOTE: AFTER LOOKING AT THE HISTORIC REVIEW COMMENTS, IT |
| LOOKS LIKE THE MAIN HOUSE IS A CONTRIBUTING HISTORIC |
| BUILDING. ENERGY CALCULATIONS ARE NOT REQUIRED FOR THE |
| MAIN HOUSE. THE GARAGE BUILDING IS NOT A HISTORIC |
| CONTRIBUTING BUILDING. ENERGY CALCULATIONS ARE REQUIRED |
| FOR THE GARAGE BUILDING. PERMIT CAN NOT BE ISSUED |
| WITHOUT THE COMPLETE ENERGY CALCULATIONS. SEC. |
| R103.1.1.2 FBC-ENERGY CONSERVATION. |
| |
| 2- SINCE THE ENERGY CALCULATIONS FOR THE GARAGE |
| BUILDING WERE NOT SUBMITTED, THEN CONTRACTOR MAY USE |
| THE FOLLOWING COMMENTS DONE FOR THE ENERGY CALCULATIONS |
| SUBMITTED FOR THE MAIN HOUSE TO MAKE SURE GARAGE |
| REQUIRED ENERGY CALCULATIONS ARE COMPLETE AND CORRECT. |
| A) COMPLETE ALL THE INFORMATION ON TOP OF FORM |
| INCLUDING OWNER NAME, BUILDER NAME, PERMIT OFFICE AND |
| JURISDICTION NUMBER. SEC. R101.5.1.1.2 FBC-ENERGY |
| CONSERVATION, 5TH EDITION (2014). |
| |
| B) REVISE ITEM #1. THIS IS NOT NEW CONSTRUCTION. SEC. |
| R101.5.1.1.2 FBC-ENERGY CONSERVATION, 5TH EDITION |
| (2014). |
| |
| C) ENERGY CALCULATIONS NEED TO BE DONE FOR THE ACTUAL |
| ORIENTATION OF THE BUILDING. THEY CAN NOT BE DONE FOR |
| THE WORST CASED SCENARIO. REVISE ITEM #5. SEC. R103.2 |
| FBC-ENERGY CONSERVATION, 5TH EDITION (2014). |
| |
| D) NEED TO PROVIDE PROOF OF THE WINDOWS AND DOORS |
| U-FACTOR AND SHGC FACTOR SPECIFIED ON ITEM #7. SEC. |
| R405.4.3 FBC-ENERGY CONSERVATION, 5TH EDITION (2014). |
| NOTE: THIS IS REQUIRED WHEN THE ENERGY CALCULATIONS USE |
| FACTORS OTHER THAN THE DEFAULT FACTORS. |
| |
| E) NEED TO REVISE THE ROOF TYPE AND MATERIALS SHOWN ON |
| PAGE 2 OF 4. THIS BUILDING HAS GABLE AND FLAT ROOFS |
| (NOT HIP). SEC. R103.2 FBC-ENERGY CONSERVATION, 5TH |
| EDITION (2014). |
| |
| F) DOORS INFORMATION SHOWN ON PAGE 3 OF 4 DOESN'T MATCH |
| PLANS AND PRODUCT APPROVALS SUBMITTED. SEC. R103.2 |
| FBC-ENERGY CONSERVATION, 5TH EDITION (2014). |
| |
| G) THE WINDOWS INFORMATION SHOWN ON PAGE 3 OF 4 DOESN'T |
| MATCH PLANS. REVISE THE BUILDING ORIENTATION, TOTAL |
| SQUARE FOOTAGE AND OVERHANG DEPTH AND SEPARATION TO |
| MATCH PLANS. SEC. R103.2 FBC-ENERGY CONSERVATION, 5TH |
| EDITION (2014). |
| |
| H) BUILDER NEEDS TO COMPLETE THE EPL DISPLAY CARD. SEC. |
| R405.4.3 FBC-ENERGY CONSERVATION, 5TH EDITION (2014). |
| |
| I) BUILDER NEEDS TO COMPLETE THE INSPECTION CHECKLIST |
| (TABLE 402.4.11 SUBMITTED). SEC. R405.4.2 FBC-ENERGY |
| CONSERVATION, 5TH EDITION (2014). |
| |
| ORIGINAL COMMENT: |
| 3- VALUATION DECLARED IN THE PERMIT IS TOO LOW BASED ON |
| THE SCOPE OF WORK SHOWN ON PLANS. VALUATION TO INCLUDE |
| ALL LABOR, MATERIALS, CONTRACTOR'S OVERHEAD AND PROFIT |
| AND ALL DESIGN PROFESSIONAL FEES AS REQUIRED BY SEC. |
| 109.3 CITY AMENDMENTS. REVISE VALUATION AS REQUIRED. |
| |
| RESPONSE: |
| REPEAT COMMENT. NOT ADDRESSED. |
| |
| 4- PROVIDE PRODUCT APPROVAL ( 2 COPIES) AS REQUIRED BY |
| FAC 61G20-3.002(33) FOR: |
| ORIGINAL COMMENT: |
| A)ALL SIMPSON STRUCTURAL CONNECTORS SPECIFIED ON |
| DETAILS SUBMITTED. |
| |
| RESPONSE: |
| REPEAT COMMENT. NOT ADDRESSED. PROVIDE THE FLORIDA |
| PRODUCT APPROVAL COVER PAGE AND PAGE SHOWING THE |
| SPECIFIED CONNECTOR OR DESIGN PROFESSIONAL TO LIST THE |
| FLORIDA PRODUCT APPROVAL NUMBER NEXT TO EACH SPECIFIED |
| CONNECTOR. |
| |
| ORIGINAL COMMENT: |
| 5- ARCHITECT OF RECORD TO REVIEW AND APPROVE IN WRITING |
| (NOT SIGNING AND SEALING) ALL PRODUCT APPROVALS |
| (INCLUDING THE ONES ALREADY SUBMITTED) AS REQUIRED BY |
| SEC. 107.3.4.1 CITY AMENDMENTS. |
| |
| RESPONSE: |
| REPEAT COMMENT. NOT ADDRESSED. |
| |
| NEW COMMENT: |
| 6- PLANS WERE REVISED. PLANS SHOW WINDOW HEATING AND |
| COOLING UNIT INSTEAD OF SPLIT A/C UNIT. REMOVABLE |
| WINDOW UNIT IS NOT ALLOWED TO PROVIDE HEATING AS |
| REQUIRED BY SEC. R303.9 FBC-RESIDENTIAL. REVISE PLANS |
| SHOWING THE HEATING AND COOLING UNIT IN A PERMANENT |
| FRAMED SPACE. REVISE FLOOR PLAN AND EXTERIOR ELEVATION |
| ACCORDINGLY. AND PROVIDE FRAMING DETAILS AND |
| SPECIFICATIONS. SEC. R301.1 FBC-RESIDENTIAL. |
| |
| ***PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH |
| COMMENT TO EXPEDITE THE REVIEW PROCESS. |
| ***PLEASE INSERT ANY REVISED DRAWING AND REMOVE OLD |
| DRAWING. DON'T STAPLE OLD DRAWINGS. SUBMIT OLD DRAWINGS |
| FOR REFERENCE. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| DEVELOPMENT SERVICES DEPARTMENT |
| (561)805-6712 |
| [email protected] |