| 1.) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 FBC-FUEL |
| GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC. |
| G2413. |
| |
| 2.)THE GAS DRAWING SHOWS THE GAS PIPING ENTERING THE |
| STRUCTURE. SUBMIT A GAS RISER SHOWING ALL GAS |
| APPLIANCES ON THE SYSTEM, THE BTU LOAD OF EACH |
| APPLIANCE AND THE LONGEST LENGTH OF PIPING FROM THE |
| POINT OF DELIVERY TO THE MOST REMOTE OUTLET AND THE |
| LOAD OF EACH SECTION. |
| |
| 3) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, ( |
| METER OR MP REGULATOR) TO THE MOST REMOTE OUTLET IN THE |
| BUILDING AND / OR SYSTEM PER THE 2014 FBC-FUEL GAS |
| SEC.402.4.1 OR 2014 FBC-RES. SEC. G 2413.3. |
| |
| 4) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. |
| SEC. G2413.2. . |
| |
| 5) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 |
| FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. |
| |
| 6) INDICATE ON THE PLANS AND PERMIT APPLICATION IF THIS |
| IS A NEW INSTALLATION OR IF IT IS REPLACING AN EXISTING |
| TANKLESS WATER HEATER IN THE SAME LOCATION. |
| |
| 7) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| LOCATION OF THE TANKLESS WATER HEATER IN RELATION TO |
| ANY OPERABLE DOORS OR WINDOOWS. THE LOCATION OF THE |
| WATER HEATER SHALL COMPLY WITH THE MANUFACTURER'S |
| INSTALLATION INSTRUCTIONS. |
| |
| |
| |
| PLUMBING PLAN REVIEW |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805-6692 |
| [email protected] |
| |
| |
| |