Plan Review Notes
Plan Review Notes For Permit 16071059
Permit Number 16071059
Review Stop M
Sequence Number 3
Notes
Date Text
2017-07-14 17:29:033RD REVIEW FBC-2014 MECHANICAL
 PERMIT #16071059
 BUILDING #2
 7/14/17
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) THE ENGINEER'S NARRATIVE AND THE CORRECTED PLANS
 HAVE ONLY ADDRESSED COMMENT #3 FROM THE 2ND REVIEW. I
 AM REPRINTING THE COMMENTS BELOW WITH COMMENT #3
 REMOVED- PLEASE COMPLY.
  
 2ND REVIEW FBC-2014 MECHANICAL
 PERMIT #16071059
 6/8/17
  
 RESULTS: DENIED.
  
 1) THE UPLOADED MECHANICAL RESPONSE NARRATIVE WAS
 COPIED FROM THE BUILDING-4 REVIEW (PERMIT #16070880)
 AND DID NOT ADDRESS COMMENTS #6-11.
  
 2) SHEET M-2.00: THE DRYER EXHAUST DUCTS IN UNITS A1,
 A1 ACCESSIBLE, AND A3 ARE NOT PERMITTED TO RUN THROUGH
 THE MECHANICAL CLOSETS PER SECTION 504.4.
  
 4) THE COMPLIANCE DATA FOR AHU-6 WAS NOT INCLUDED IN
 THE ENERGYGAUGETOTAL BUILDING PERFORMANCE SUBMITTAL
 FORM.
  
 5) PLEASE CORRECT OR REVISE THE PLANS IN ACCORDANCE
 WITH 1ST REVIEW COMMENTS #1, 6, 7, 8, 9, 10, 12, & 14
 REPRINTED BELOW:
  
 1ST REVIEW COMMENTS.
 8/29/16
  
 1) THE SUBMITTED AC CALCULATION PACKET DOES NOT INCLUDE
 THE AHU-3, AHU-4, AHU-A2/CU-2, AHU-A3/CU-3,
 AHU-B2/CU-2, AHU-5 (TRASH ROOM) AND AHU-6 (ELEVATOR
 VESTIBULE) SYSTEMS- PLEASE PROVIDE. A) THE CALCULATIONS
 ARE INCORRECTLY INDICATING MIAMI AS THE LOCATION. B)
 REVIEW THE AC SCHEDULE ON M-4.00: THE 4-TON AHU-1
 SYSTEM FOR THE LEASING OFFICE IS ALSO SHOWN AS AN
  
 1.5 TON APARTMENT SYSTEM ON SHEET M-02.00- PLEASE
 CORRECT. C) REFER TO SECTION C403.2.1 FBC-14 ENERGY
 CONSERVATION: A COOLING AND HEATING CALCULATION SHALL
 BE SUBMITTED FOR EACH SYSTEM SHOWN ON THE PLAN, AND ALL
 SUMMARY CALCULATIONS SUBMITTED BY A REGISTERED ENGINEER
 SHALL BEAR THE SIGNATURE AND SEAL OF THE EOR. D) THE
 HEATING CAPACITIES OF AHU-1 & 2 (8KW & 10KW IN
  
 THE EQUIPMENT SCHEDULE) ARE EXCEEDING THE CALCULATED
 LOADS AND ARE OVERSIZED- SEE SECTION C403.2.2 FBC-14
 ENERGY CONSERVATION.
  
 6) SHEET M-1.05: MANY OF THE DUCT CONNECTIONS TO THE
 DIFFUSERS IN THE CLUB ROOM ARE NOT SHOWN.
  
 7) M-1.05: EXHAUST VENTILATION IS REQUIRED IN THE FOOD
 PREP ROOM PER TABLE 403.3 AND SECTION 507.2.2. PROVIDE
 A KITCHEN EQUIPMENT PLAN AND SCHEDULE. A) PROVIDE
 MAKEUP AIR AND AIR BALANCE CALCULATIONS.
  
 8) M-1.05: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 DRYERS IN THE LAUNDRY ROOM- SECTION 504.7. A) PROVIDE
 MAKEUP AIR AND AIR BALANCE CALCULATIONS. PLEASE NOTE
 THAT IF THE APPLIANCES ARE GAS-FIRED, COMBUSTION AIR
 CALCULATIONS WILL BE REQUIRED.
  
 9) PROVIDE TRASH ROOM AND ELECTRICAL ROOM EXHAUST
 VENTILATION CALCULATIONS, AND HOISTWAY VENTING
 CALCULATIONS.
  
 10) PROVIDE A REFRIGERANT PIPING RISER AND INCLUDE
 PIPING DETAILS- TYPES AND SIZES, TOTAL ALLOWABLE
 LENGTHS PER THE MANUFACTURER SPECIFICATIONS, AND TYPE
 AND THICKNESSES OF PIPE INSULATIONS.
  
 12) WIND LOAD DESIGN FOR ROOTOP AND GROUND-MOUNTED
 MECHANICAL EQUIPMENT: THE CU MOUNTING DETAIL ON M-3.00
 IS INDICATING AN INCORRECT WIND SPEED OF150 MPH. PLEASE
 PROVIDE CURRENT WIND LOAD DESIGN CRITERIA ON THE PLAN,
 AND SUBMIT THE MIAMI-DADE NOA #13-1017.09 LISTED IN THE
 DETAIL. PLEASE NOTE THE EOR SHALL PLACE HIS SHOP
 DRAWING APPROVAL STAMP AND SIGNATURE ON THE
  
 NOA AND ALL OTHER NOAS, PRODUCT APPROVALS, OR
 MANUFACTURER'S SPECIFICATIONS SUBMITTED AS PART OF THE
 PERMIT PACKAGE- INCLUDING THE GREENHECK MOTORIZED
 DAMPER AND LOUVER FOR THE HOISTWAY, AND ALL OTHER
 OUTSIDE AIR INTAKE AND EXHAUST OUTLET LOUVERS.
  
 14) REFER TO SECTION 3006.2 FBC-14 BUILDING AND CLARIFY
 IF THERE IS AN ELEVATOR MACHINE ROOM, AND PROVIDE AN
 INDEPENDENT VENTILATION OR AIR CONDITIONING SYSTEM. THE
 PLANS SHOW AN ELEVATOR VESTIBULE BUT NO EQUIPMENT IS
 SHOWN IN THE ROOM.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  
  
  
  
  
  
  