2017-06-20 06:15:00 | 1) SHT. A5.08 - ACCESSIBLE RESTROOM FIXTURE LEGEND - |
| THE TOILET PAPER DISPENSER SHALL BE LOCATED 7-9 INCHES |
| FROM THE FRONT OF THE WATER CLOSET TO THE CENTERLINE OF |
| THE FIRST TOILET PAPER DISPENSER, NOT TO THE CENTERLINE |
| OF THE UNIT AS SHOWN. 2014 FBC-ACCESS. SEC.604.7. |
| 2) SHT.A6.15 - USABLE BATHROOM FIGURES - IDENTIFY ON |
| THE PLANS WHICH BATHROOMS ARE DESIGN SPECIFICATION "A" |
| OR "B" OF THE FHA. THIS SHEET HAS NOT BEEN REVISED AS |
| NOTED IN THE RESPONSE NARRATIVE. 2ND REQUEST. |
| 3) SUBMIT A SEPARATE LETTER FROM THE DESIGN |
| PROFESSIONAL OF RECORD STATING THAT SANITARY FACILITIES |
| FOR THE MAINTENANCE WORKERS ARE LOCATED WITHIN 500 FEET |
| OF THE TRASH ROOMS, MAINTENANCE ROOMS, ETC., PER 2014 |
| FBC-PLUMBING SEC.403.3.3. |
| 4) SUBMIT MANUFACTURER'S SPECIFICATIONS/INSTALLATION |
| MANUAL FOR THE OIL SMART PUMP SYSTEM IN THE ELEVATOR |
| SHAFT.WPB AMEND. TO FBC SEC. 107.2.1.2ND REQUEST. |
| 5) SUBMIT CALCULATIONS AS TO HOW YOU ARRIVED AT THE |
| SIZE OF THE SCHIER LAUNDRY INTERCEPTOR.2014 |
| FBC-PLUMBING.2ND REQUEST. |
| 6) ACCESS SHALL BE PROVIDED TO THE WATER SUPPLY VALVES |
| FOR THE STACKED WASHERS/DRYERS. I COULD NOT FIND THE |
| REVISED NOTE ON THE PLANS. CLARIFY. 2014 FPC |
| SEC.606.3.2ND REQUEST |
| 7) SHT. P4.05 - A URINAL IS NOT PERMITTED ON A WET |
| VENT. 2014 FBC-PLUMBING SEC.912.1, 912.1.1. THE ADDED |
| STACK APPEARS TO HAVE A CLEANOUT ON IT BUT NO URINAL. |
| CLARIFY. |
| 8) SHT.P2.05 - THE MEN'S AND WOMENS RESTROOMS ACROSS |
| FROM THE EXERCISE ROOM ARE STILL MISLABELED.THE SAME |
| ISSUE OCCURS ON SHT. P2.05B AND ON THE ENLARGED PLAN ON |
| P2.05B AND ALSO THERE ARE NO PLUMBING FIXTURES SHOWN IN |
| THE MEN'S RESTROOM ON SHT. P2.05B. |
| 9) THE LOCATION OF THE SANITARY RISERS S/24 & S/25 ON |
| SHT. P2.05 B ARE REVERSED AS TO THE LAYOUT ON |
| SHT.P4.05. BUILDING # II, SEE UNIT B1. |
| 10) THE LOCATION OF SANITARY RISERS S/24 & S/25 ON |
| SHT.SHT. P2.05 A DOES NOT CORRELATE WITH THE LOCATION |
| SHOWN ON SHT. P4.05.THE RISERS ARE REVERSED. |
| 11) SUBMIT A DETAIL FOR THE SUB-WATER METERS IF THEY |
| ARE BEING INSTALLED IN THESE BUILDINGS. SHOW THE |
| LOCATION OF THE SUB-METERS IF APPLICABLE. MATERIALS |
| PLACED WITHIN RETURN AIR PLENUMS SHALL BE |
| NONCOMBUSTIBLE OR SHALL BE LISTED AND LABELED AS HAVING |
| A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A |
| SMOKE-DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED |
| IN ACCORDANCE WITH ASTM E84 OR UL 723.2014 |
| FBC-MECHANICAL SEC. 602.2.1. |
| 12) SHT. P4.06 - A SHUTOFF VALVE IS REQUIRED ON THE 2 |
| INCH WATER MAIN SUPPLY TO THE AMENITIES/LEASING AREA |
| PER 2014 FBC-PLUMBING SEC.606.2. |
| 13) SHT.P1.00 - THE ORIENTATION OF BUILDING II IN |
| RELATION TO THE POINT OF COMPASS ON THE PLAN DOES NOT |
| CORRELATE WITH THE ORIENTATION OF BUILDING II ON SHT. |
| P2.05. CLARIFY. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |
| |
| |
| |