2016-08-29 14:20:31 | 1ST REVIEW FBC-2014 MECHANICAL |
| ROYAL PALM PLACE- BUILDING- 2 |
| 8/29/16 |
| |
| 1) THE SUBMITTED AC CALCULATION PACKET DOES NOT INCLUDE |
| THE AHU-3, AHU-4, AHU-A2/CU-2, AHU-A3/CU-3, |
| AHU-B2/CU-2, AHU-5 (TRASH ROOM) AND AHU-6 (ELEVATOR |
| VESTIBULE) SYSTEMS- PLEASE PROVIDE. B) THE CALCULATIONS |
| ARE INCORRECTLY INDICATING MIAMI AS THE LOCATION. B) |
| REVIEW THE AC SCHEDULE ON M-4.00: THE 4-TON AHU-1 |
| SYSTEM FOR THE LEASING OFFICE IS ALSO SHOWN AS AN |
| |
| 1.5 TON APARTMENT SYSTEM ON SHEET M-02.00- PLEASE |
| CORRECT. B) REFER TO SECTION C403.2.1 FBC-14 ENERGY |
| CONSERVATION: A COOLING AND HEATING CALCULATION SHALL |
| BE SUBMITTED FOR EACH SYSTEM SHOWN ON THE PLAN, AND ALL |
| SUMMARY CALCULATIONS SUBMITTED BY A REGISTERED ENGINEER |
| SHALL BEAR THE SIGNATURE AND SEAL OF THE ENGINEER. SEE |
| ALSO SECTION |
| |
| C407.5.2.3 IF SUBMITTING A TOTAL BUILDING PERFORMANCE |
| ENERGY COMPLIANCE METHOD. C) THE HEATING CAPACITIES OF |
| AHU-1 & 2 (8KW & 10KW IN THE EQUIPMENT SCHEDULE) ARE |
| EXCEEDING THE CALCULATED LOADS AND ARE OVERSIZED- SEE |
| SECTION C403.2.2 FBC-14 ENERGY CONSERVATION. |
| |
| 2) SHEETS M-2.00, M-2.01, & M-400: THE SPLIT AC |
| SCHEDULE DOES NOT INCLUDE THE AHU-2, AHU-3, AHU-B2, & |
| AHU-B3 SYSTEMS. |
| |
| 3) SHEETS M2.00 & M-2.01: THE EXCEPTION UNDER SECTION |
| 504.6.1 THAT ALLOWED THE USE OF DRYER BOOSTER FANS HAS |
| BEEN REMOVED FROM THE FBC-14 MECHANICAL CODE. PLEASE |
| SUBMIT MANUFACTURER'S SPECIFICATIONS AND EXHAUST VENT |
| INSTALLATION INSTRUCTIONS. |
| |
| 4) THE PROPOSED BUILDING SHALL BE IN COMPLIANCE WITH |
| THE FBC-14 ENERGY CONSERVATION CODE. REFER TO SECTIONS |
| C101.2, C101.5, AND C401.2 AND SUBMIT COMPLIANCE |
| MATERIALS AND FORMS. |
| |
| 5) PROVIDE EQUIPMENT SCHEDULES FOR THE APARTMENT |
| OUTSIDE AIR FANS AND MOTORIZED DAMPERS, AND PROVIDE |
| CLEARANCE DISTANCE MEASUREMENTS FOR ALL AIR INTAKES- |
| SECTION 401.4 |
| |
| 6) SHEET M-1.05: MANY OF THE DUCT CONNECTIONS TO THE |
| DIFFUSERS IN THE CLUB ROOM ARE NOT SHOWN. |
| |
| 7) M-1.05: EXHAUST VENTILATION IS REQUIRED IN THE FOOD |
| PREP ROOM PER TABLE 403.3 AND SECTION 507.2.2. PROVIDE |
| A KITCHEN EQUIPMENT PLAN AND SCHEDULE. A) PROVIDE |
| MAKEUP AIR AND AIR BALANCE CALCULATIONS. |
| |
| 8) M-1.05: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| DRYERS IN THE LAUNDRY ROOM- SECTION 504.7. A) PROVIDE |
| MAKEUP AIR AND AIR BALANCE CALCULATIONS. PLEASE NOTE |
| THAT IF THE APPLIANCES ARE GAS-FIRED, COMBUSTION AIR |
| CALCULATIONS WILL BE REQUIRED. |
| |
| 9) PROVIDE TRASH ROOM AND ELECTRICAL ROOM EXHAUST |
| VENTILATION CALCULATIONS, AND HOISTWAY VENTING |
| CALCULATIONS. |
| |
| 10) PROVIDE A REFRIGERANT PIPING RISER AND INCLUDE |
| PIPING DETAILS- TYPES AND SIZES, TOTAL ALLOWABLE |
| LENGTHS PER THE MANUFACTURER SPECIFICATIONS, AND TYPE |
| AND THICKNESSES OF PIPE INSULATIONS. |
| |
| 11) PROVIDE UL FIRESTOPPING ASSEMBLIES FOR PIPE |
| PENETRATIONS. |
| |
| 12) WIND LOAD DESIGN FOR ROOTOP AND GROUND-MOUNTED |
| MECHANICAL EQUIPMENT: THE CU MOUNTING DETAIL ON M-3.00 |
| IS INDICATING AN INCORRECT WIND SPEED OF150 MPH. PLEASE |
| PROVIDE CURRENT WIND LOAD DESIGN CRITERIA ON THE PLAN, |
| AND SUBMIT THE MIAMI-DADE NOA #13-1017.09 LISTED IN THE |
| DETAIL. PLEASE NOTE THE EOR SHALL PLACE HIS SHOP |
| DRAWING APPROVAL STAMP AND SIGNATURE ON THE |
| |
| NOA AND ALL OTHER NOAS, PRODUCT APPROVALS, OR |
| MANUFACTURER'S SPECIFICATIONS SUBMITTED AS PART OF THE |
| PERMIT PACKAGE- INCLUDING THE GREENHECK MOTORIZED |
| DAMPER AND LOUVER FOR THE HOISTWAY, AND ALL OTHER |
| OUTSIDE AIR INTAKE AND EXHAUST OUTLET LOUVERS. |
| |
| 13) REFER TO SECTION 306.5 AND PROVIDE DETAILS FOR THE |
| LADDER THAT IS PROVIDING ACCESS TO THE ROOF HATCH. |
| |
| 14) REFER TO SECTION 3006.2 FBC-14 BUILDING AND CLARIFY |
| IF THERE IS AN ELEVATOR MACHINE ROOM, AND PROVIDE AN |
| INDEPENDENT VENTILATION OR AIR CONDITIONING SYSTEM. THE |
| PLANS SHOW AN ELEVATOR VESTIBULE BUT NO EQUIPMENT IS |
| SHOWN IN THE ROOM. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |