2017-06-19 14:26:191) SHT. A5.08 - ACCESSIBLE RESTROOM FIXTURE LEGEND -
 THE TOILET PAPER DISPENSER SHALL BE LOCATED 7-9 INCHES
 FROM THE FRONT OF THE WATER CLOSET TO THE CENTERLINE OF
 THE FIRST TOILET PAPER DISPENSER, NOT TO THE CENTERLINE
 OF THE UNIT AS SHOWN. 2014 FBC-ACCESS. SEC.604.7.
 2) SHT.A6.15 - USABLE BATHROOM FIGURES - IDENTIFY ON
 THE PLANS WHICH BATHROOMS ARE DESIGN SPECIFICATION "A"
 OR "B" OF THE FHA. THIS SHEET HAS NOT BEEN REVISED AS
 NOTED IN THE RESPONSE NARRATIVE. 2ND REQUEST.
 3) SUBMIT A SEPARATE LETTER FROM THE DESIGN
 PROFESSIONAL OF RECORD STATING THAT SANITARY FACILITIES
 FOR THE MAINTENANCE WORKERS ARE LOCATED WITHIN 500 FEET
 OF THE TRASH ROOMS, MAINTENANCE ROOMS, ETC., PER 2014
 FBC-PLUMBING SEC.403.3.3.
 4) SUBMIT MANUFACTURER'S SPECIFICATIONS/INSTALLATION
 MANUAL FOR THE OIL SMART PUMP SYSTEM IN THE ELEVATOR
 SHAFT.WPB AMEND. TO FBC SEC. 107.2.1.2ND REQUEST.
 5) SUBMIT CALCULATIONS AS TO HOW YOU ARRIVED AT THE
 SIZE OF THE SCHIER LAUNDRY INTERCEPTOR.2014
 FBC-PLUMBING.2ND REQUEST.
 6) ACCESS SHALL BE PROVIDED TO THE WATER SUPPLY VALVES
 FOR THE STACKED WASHERS/DRYERS. I COULD NOT FIND THE
 REVISED NOTE ON THE PLANS. CLARIFY. 2014 FPC
 SEC.606.3.2ND REQUEST
 7) SHT. P4.05 - A URINAL IS NOT PERMITTED ON A WET
 VENT. 2014 FBC-PLUMBING SEC.912.1, 912.1.1. THE ADDED
 STACK APPEARS TO HAVE A CLEANOUT ON IT BUT NO URINAL.
 CLARIFY.
 8) SHT.P2.05 - THE MEN'S AND WOMENS RESTROOMS ACROSS
 FROM THE EXERCISE ROOM ARE STILL MISLABELED.THE SAME
 ISSUE OCCURS ON SHT. P2.05B AND ON THE ENLARGED PLAN ON
 P2.05B AND ALSO THERE ARE NO PLUMBING FIXTURES SHOWN IN
 THE MEN'S RESTROOM ON SHT. P2.05B.
 9) THE LOCATION OF THE SANITARY RISERS S/24 & S/25 ON
 SHT. P2.05 B ARE REVERSED AS TO THE LAYOUT ON
 SHT.P4.05. BUILDING # II, SEE UNIT B1.
 10) THE LOCATION OF SANITARY RISERS S/24 & S/25 ON
 SHT.SHT. P2.05 A DOES NOT CORRELATE WITH THE LOCATION
 SHOWN ON SHT. P4.05.THE RISERS ARE REVERSED.
 11) SUBMIT A DETAIL FOR THE SUB-WATER METERS IF THEY
 ARE BEING INSTALLED IN THESE BUILDINGS. SHOW THE
 LOCATION OF THE SUB-METERS IF APPLICABLE. MATERIALS
 PLACED WITHIN RETURN AIR PLENUMS SHALL BE
 NONCOMBUSTIBLE OR SHALL BE LISTED AND LABELED AS HAVING
 A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A
 SMOKE-DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED
 IN ACCORDANCE WITH ASTM E84 OR UL 723.2014
 FBC-MECHANICAL SEC. 602.2.1.
 12) SHT. P4.06 - A SHUTOFF VALVE IS REQUIRED ON THE 2
 INCH WATER MAIN SUPPLY TO THE AMENITIES/LEASING AREA
 PER 2014 FBC-PLUMBING SEC.606.2.
 13) SHT.P1.00 - THE ORIENTATION OF BUILDING II IN
 RELATION TO THE POINT OF COMPASS ON THE PLAN DOES NOT
 CORRELATE WITH THE ORIENTATION OF BUILDING II ON SHT.
 P2.05. CLARIFY.
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved