Date |
Text |
2016-09-29 06:40:15 | ****CORRECTIONS**** |
| THRESHOLD INSPECTOR REQUIRED FOR PERMIT 16070916 |
| (BUILDING 1; 4 STORIES) ONLY |
| RESIDENT INSPECTOR FOR OTHER BUILDINGS RECOMMENDED BUT |
| OPTIONAL |
| |
| SAMANTHA HILL |
| BUILDING PLANS EXAMINER |
| [email protected] |
| 561-805-6724 |
| |
| THIS PERMIT INCLUDES FOUR BUILDINGS: |
| |
| PERMIT #16070916 906 17TH STREET - 68 UNITS, 4 STORIES |
| (BUILDING 1) |
| PERMIT #16071059 808 17TH STREET - 45 UNITS, 3 STORIES |
| (BUILDING 2) |
| PERMIT #16071058 811 15TH STREET - 6 UNITS, 1 STORY |
| (BUILDING 3) |
| PERMIT #16070880 805 15TH STREET - 6 UNITS, 1 STORY |
| (BUILDING 4) |
| |
| GOVERNING CODE: FBC 5TH EDITION (FBC 2014) |
| |
| 1. FLORIDA STATUTE 553.71, THIS BUILDING QUALIFIES AS A |
| THRESHOLD BUILDING; ANY BUILDING WHICH IS GREATER THAN |
| (3) STORIES OR 50 FT. IN HEIGHT, OR WHICH HAS AN |
| ASSEMBLY OCCUPANCY CLASSIFICATION AS DEFINED IN THE |
| FLORIDA BUILDING CODE WHICH EXCEEDS 5,000 SF IN AREA |
| AND AN OCCUPANT CONTENT OF GREATER THAN 500 PERSONS. |
| |
| 2. AS A THRESHOLD BUILDING, THE FOLLOWING IS REQUIRED: |
| |
| A. THRESHOLD INSPECTION PLAN; FS 553.79(5)(A), CITY OF |
| WEST PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING |
| CODE, CHAPTER 1, ADMINISTRATION 109.3.6.1. THE |
| ENFORCING AGENCY SHALL REQUIRE A SPECIAL INSPECTOR TO |
| PERFORM STRUCTURAL INSPECTIONS ON A THRESHOLD BUILDING |
| PURSUANT TO A STRUCTURAL INSPECTION PLAN PREPARED BY |
| THE ENGINEER OR ARCHITECT OF RECORD. THE STRUCTURAL |
| INSPECTION PLAN MUST BE SUBMITTED TO AND APPROVED BY |
| THE ENFORCING AGENCY BEFORE THE ISSUANCE OF A BUILDING |
| PERMIT FOR THE CONSTRUCTION OF A THRESHOLD BUILDING. |
| THE PURPOSE OF THE STRUCTURAL INSPECTION PLAN IS TO |
| PROVIDE SPECIFIC INSPECTION PROCEDURES AND SCHEDULES SO |
| THAT THE BUILDING CAN BE ADEQUATELY INSPECTED FOR |
| COMPLIANCE WITH THE PERMITTED DOCUMENTS. |
| |
| B. THRESHOLD INSPECTOR: WPB AMENDMENT 109.3.6.2 W.P.B. |
| CONSTRUCTION SERVICES DEPARTMENT REQUESTS FOR THRESHOLD |
| BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY FS |
| 553.79(5)(A) TO THE MINIMUM INSPECTIONS REQUIRED BY |
| THIS CODE. THE THRESHOLD INSPECTION FORMS ARE REQUIRED |
| TO BE FILED OUT BY ALL PARTIES, NOTARIZED AND RETURNED |
| TO THIS OFFICE, REVIEWED AND APPROVED PRIOR TO PERMIT |
| ISSUANCE. CONTACT KEN CONRAD, MANAGER OF THE SPECIAL |
| INSPECTOR PROGRAM, AT 561-805-6666 FOR ADDITIONAL |
| INFORMATION. |
| FORMS WERE SENT TO: [email protected] ON 9/29/16. |
| |
| C. SPECIAL INSPECTOR RESUME': PROVIDE A RESUME' OF |
| INSPECTION EXPERIENCE ON PREVIOUS PROJECTS FOR REVIEW |
| BY THE BUILDING OFFICIAL OR HIS DESIGNEE. AFTER THE |
| RESUME' IS REVIEWED, AN INTERVIEW WILL BE SCHEDULED. |
| UNDER NO CIRCUMSTANCES WILL AN INSPECTOR BE INTERVIEWED |
| FOR WORK WITHOUT FIRST MEETING THE ABOVE CRITERIA. THE |
| RESUME' IS TO BE SUBMITTED TO KEN CONRAD (AND COPY |
| SAMANTHA HILL), 561-805-6666, [email protected], |
| [email protected] |
| |
| ALL PROSPECTIVE INSPECTORS ARE TO BE APPROVED BY THE |
| CHIEF BUILDING INSPECTOR AND ALL ARE REQUIRED TO SIGN |
| THE SPECIAL INSPECTOR AGREEMENT. |
| |
| D. CONTRACTOR RESUME': PROVIDE A JOB SUMMARY OR HISTORY |
| FOR THIS TYPE OF CONSTRUCTION. THIS MAY BE SUBMITTED TO |
| KEN CONRAD, (PLEASE COPY SAMANTHA HILL) VIA E-MAIL |
| ([email protected], [email protected]). |
| |
| E. PERMIT DOCUMENTS: PAPER SUBMITTALS REQUIRE THREE |
| SIGNED AND SEALED (IF APPLICABLE) ORIGINAL SETS OF ALL |
| DOCUMENTS. |
| |
| F. FS553.79(7)(D)ALL PLANS FOR THE BUILDING WHICH ARE |
| REQUIRED TO BE SIGNED AND SEALED BY THE ARCHITECT OR |
| ENGINEER OF RECORD CONTAIN A STATEMENT THAT, TO THE |
| BEST OF THE ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE |
| PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE |
| MINIMUM BUILDING CODES AND THE APPLICABLE FIRESAFETY |
| STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY IN |
| ACCORDANCE WITH THIS CHAPTER AND CHAPTER 633. CONFIRM |
| ALL APPLICABLE PAGES INCLUDE THE REQUIRED STATEMENT. |
| |
| 3. ADVISORY ONLY; PER FS 553.79, ALL SHORING/RE-SHORE |
| ENGINEERING IS TO BE REVIEWED BY ENGINEER OF RECORD AND |
| THREE SIGNED AND SEALED ORIGINAL SETS ARE TO BE |
| SUBMITTED FOR PLAN REVIEW. THE SHORING/RESHORE |
| ENGINEERING IS TO BE REVIEWED AND APPROVED PRIOR TO |
| INSPECTION. THE CITY APPROVED (CITY STAMPED) |
| SHORING/RE-SHORE ENGINEERING IS TO BE AVAILABLE ON THE |
| JOB AT THE TIME OF INSPECTION. |
| |
| 4. ADVISORY ONLY; PRIOR TO INSTALLATION, A GUARD RAIL |
| DETAIL IS TO BE SUBMITTED FOR PLAN REVIEW. THIS SHOULD |
| BE SUBMITTED WITH THE SHORING/RESHORE ENGINEERING. |
| |
| 5. SPECIAL INSPECTOR REQUIRED FOR BUILDING 1. DEPENDING |
| ON HOW AGGRESSIVE THE CONSTRUCTION SCHEDULE IS, |
| APPLICANT MAY WANT TO CONSIDER USING THE SAME INSPECTOR |
| FOR BUILDINGS 2, 3, 4 (PER KEN CONRAD, CHIEF BUILDING |
| INSPECTOR). PLEASE CALL ME IF YOU WISH TO DISCUSS. |
| |
| |
| |
| |
| |
| |