2017-07-14 14:58:02 | 1) SHT. A6.08 - THE CLEAR FLOOR SPACE FOR THE LAVATORY |
| SHALL BE CENTERED ON THE FIXTURE PER THE FAIR HOUSING |
| ACCESSIBILITY GUIDELINES.IN ADDITION, PROVIDE THE CLEAR |
| LENGTH X WIDTH DIMENSIONS OF ALL REQUIRED CLEAR FLOOR |
| SPACE DIMENSIONS FOR THE FIXTURES PER THE FHAG. |
| 2) SHT. A6.10 - SHOW THE DIMENSIONS OF THE CLEAR FLOOR |
| SPACE FOR THE WATER CLOSET IN THE A1 UNIT MODEL. COMPLY |
| WITH FHAG. |
| 3) SHT. A 6.10 - UNITS A1 & B1 ARE SHOWN AS A TYPE "A" |
| & "B" DESIGN SPECIFICATION BATHROOM PER THE FHAG. IF |
| THESE ARE "UFAS" UNITS, IDENTIFY THEM AS SUCH. WPB |
| AMEND. TO FBC SEC. 107.2.1. |
| 4) THE LETTTER FROM THE ARCHITECT REGARDING THE TOILET |
| FACILITIES FOR WORKERS IS VAGUE AND IS UNACCEPTABLE. |
| REFERENCE IS MADE TO A MAINTENANCE RESTROOM BUT THERE |
| IS NO MAINTENANCE RESTROOM IN BUILDING #1.SANITARY |
| FACILITIES FOR WORKERS IN THE MAINTENANCE AND TRASH |
| AREAS OF BUILDING #1 SHALL BE PROVIDED WITHIN 500 FEET |
| OF THESE AREAS. 2014 FBC SEC. 403.3.3 |
| 5) SHT. P4.05 - A URINAL IS NOT PERMITTED ON A WET VENT |
| THE RISER SHOWS THE URINAL IN THE MEN'S RESTROOM ACROSS |
| FROM THE EXERCISE ROOM DISCHARGING INTO A VERTICAL WET |
| VENT ABOVE THE LAVATORY. THE URINAL IS TO BE INSTALLED |
| ON IT'S OWN STACK & VENTED. 2014 FBC SECS.912.1, |
| 912.1.1. 3RD REQUEST. |
| 6) SHT. P2.05B - THE MEN'S AND WOMEN'S RESTROOMS ACROSS |
| FROM THE EXERCISE ROOM ARE STILL MISLABELED.PLEASE |
| REVISE. |
| 7) THE LOCATION OF SANITARY RISERS S/24 & S/25 LOCATED |
| ACROSS FROM THE LAUNDRY ROOM ON SHT. P2.05B ARE |
| REVERSED AS TO THE LAYOUT ON SHT. P4.05, REFER TO |
| BUILDING # II, UNIT B1.2ND REQUEST. |
| 8) THE DETAIL FOR THE "PLENUM RATED" WATER METERS ON |
| SHEET P5.00 WILL REQUIRE ADDITIONAL DOCUMENTATION FROM |
| THE MANUFACTURER CWE. INFORMATION ON THEIR WEBSITE |
| INDICATES THEY DO NOT MANUFACTURE "PLENUM RATED WATER |
| METERS". THE MATERIAL COMPOSITION OF THE WATER METERS |
| SHALL MEET THE SMOKE- DEVELOPED INDEX AND FLAME SPREAD |
| RATING REQUIREMENTS OF ASTM E84 OR UL 723. THE FLAME |
| SPREAD INDEX SHALL BE NOT MORE THAN 25 AND THE |
| SMOKE-DEVELOPED INDEX SHALL NOT BE MORE THAN 50. 2014 |
| FBC - MECHANICAL SEC. 602.2.1.2ND REQUEST. |
| 9) SHT. P1.00 - THE ORIENTATION OF BUILDING # II IN |
| RELATION TO THE POINT OF COMPASS ON THE PLAN DOES NOT |
| CORRELATE WITH THE ORIENTATION OF BULDING II ON SHT. |
| P2.05. CLARIFY. 2ND REQUEST. |
| |
| NOTE: THE ABOVE CONDITIONS ARE PROVISOS FOR APPROVAL OF |
| THESE PLANS FOR PLUMBING PLAN REVIEW. REVISED PLANS |
| SHALL BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO THE |
| ISSUANCE OF THE PLUMBING PERMIT. |
| T.LARGE, CHIEF PLUMBING INSPECTOR |
| JULY 14TH, 2017. |
| |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |
| |