2016-07-29 15:53:22 | 1ST REVIEW MECHANICAL- FBC-2014 |
| PERMIT #16070837 |
| 7/29/16 |
| |
| 1) SHEETS A2.01A & M1.01: THE PLANS APPEAR TO INDICATE |
| AN ENCLOSED PARKING GARAGE WHICH IS REQUIRED TO HAVE AN |
| EXHAUST VENTILATION SYSTEM PER SECTION 406.6.2 FBC-14 |
| BUILDING. PROVIDE A SYSTEM DESIGNED IN ACCORDANCE WITH |
| SECTION 404.1, 404.2, & 404.3.FBC-14 MECHANICAL. |
| |
| 2) A2.01A: PROVIDE AN EXHAUST SYSTEM FOR THE TRASH ROOM |
| PER TABLE 6-4 ASHRAE 62.1-2010. |
| |
| 3) A2.01B: THE PLAN INDICATES A MECHANICAL ROOM IN THE |
| BASEMENT. PLEASE SHOW ALL EQUIPMENT AND PROVIDE |
| EQUIPMENT LISTS AND SCHEDULES. |
| |
| 4) M-1.00: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| DRYER WITH REVIEW SIGNATURE BY THE ENGINEER OF RECORD. |
| |
| 5) M-1.00 & M-1.01: CLARIFY WHERE THE AIR INLET OPENING |
| IS LOCATED FOR THE FCU-A OUTDOOR AIR DUCT. |
| |
| 6) M-1.01: A DUCT SMOKE DETECTOR IS REQUIRED IN THE |
| RETURN AIR SYSTEM OF FCU-B- SECTION 606.2.1. |
| |
| 7) M-1.01: THE 24X48 RETURN GRILL APPEARS UNDERSIZED |
| FOR THE 3440 CFMS (ADJUSTED TO 2992 CFMS USING |
| PERCENTAGE OF OUTDOOR AIR) OF SUPPLY AIR SHOWN ON THE |
| PLAN. THE INDUSTRY STANDARD IS TYPICALLY 200 SQ. INCHES |
| PER TON. |
| |
| 8) M-3.01: REFER TO SECTION C404.2.2 FBC-14 ENERGY |
| CONSERVATION: THE COOLING AND HEATING OUTPUT CAPACITIES |
| OF FCU-B EXCEED THE SYSTEM SUMMARY LOADS CALCULATED BY |
| THE EOR. |
| |
| 9) M-3.01:THE COOLING AND HEATING CAPACITIES OF FCU-1 & |
| FCU-2 EXCEED THE SYSTEM SUMMARY LOADS CALCULATED FOR |
| 2ND, 3RD, AND 4TH FLOOR SUITES. A) THE HEATING |
| CAPACITIES OF FCU-1 & FCU-2 EXCEED THE SYSTEM SUMMARY |
| LOADS CALCULATED FOR THE 5TH FLOOR SUITES- SECTION |
| C404.2.2. |
| |
| 10) M-3.01: THE AC UNIT SCHEDULE DOES NOT LIST THE |
| TOTAL CFMS OF SUPPLY AIR FOR FCU-1 & FCU-2. |
| |
| 11 ) M-2.01: PLEASE LABEL THE AC SYSTEMS AS EITHER |
| FCU-1 OR 2. |
| |
| 12) M-2.01: THE RETURN AIR GRILLS APPEAR UNDERSIZED FOR |
| THE AMOUNT OF SUPPLY AIR FOR EACH SYSTEM, WITH |
| ADJUSTMENT FACTOR FOR OUTDOOR AIR. THE INDUSTRY |
| STANDARD IS TYPICALLY 200 SQ. INCHES PER TON. |
| |
| 13) M-2.01: MOTORIZED DAMPERS ARE REQUIRED FOR THE |
| OUTDOOR AIR SUPPLY TO THE GUEST SUITE SYSTEMS- SECTION |
| C403.2.4.4. |
| |
| 14) M-3.01: PROVIDE EXHAUST VENTILATION CALCULATIONS |
| FOR THE JANITOR AND STORAGE ROOMS- TABLE 403.3. |
| |
| 15) M-3.01: A VENTILATION RATE OF 0.48 CFMS PER SQ. FT. |
| IS REQUIRED FOR SWIMMING POOLS AND POOL DECK AREAS PER |
| TABLE 403.3, HOWEVER IT APPEARS THAT THE POOLS ARE OPEN |
| PARTIALLY ON ONE SIDE TO THE OUTDOORS. PLEASE PROVIDE A |
| CALCULATION FOR NATURAL VENTILATION IF APPLICABLE. |
| |
| 16) M-4.01, REFRIGERANT PIPING RISERS: PLEASE INDICATE |
| THE TYPE OF PIPING, PIPE SIZES, AND THE LENGTHS OF THE |
| PIPING RUNS. VERIFY COMPLIANCE WITH MANUFACTURER'S |
| SPECIFICATIONS AND INSTALLATION INSTRUCTIONS. |
| |
| 17) M-4.02: PROVIDE SITE SPECIFIC WIND LOAD ENGINEERING |
| FOR ALL ROOFTOP MECHANICAL EQUIPMENT INCLUDING CU-A & B |
| WHICH ARE NOT SHOWN IN THE DRAWING- SECTION 301.15. |
| SUBMIT NOA #15-0902.05 WITH SHOP DRAWING APPROVAL |
| SIGNATURE BY THE EOR. |
| |
| 18) PROVIDE A SUBMITTAL PACKAGE FOR MECHANICAL |
| EQUIPMENT THAT INCLUDING BUT NOT LIMITED TO THE AC |
| SYSTEMS, MOTORIZED DAMPERS, DUCT SMOKE DETECTORS, FIRE |
| DAMPERS, THE WATER HEATERS AND FLUE EXHAUST/AIR INTAKE |
| DUCTS, LOUVERS ETC. PLEASE NOTE A FLORIDA PRODUCT |
| APPROVAL AND/OR A MIAMI-DADE NOA MUST BE SUBMITTED FOR |
| THE LOUVERS SHOWN AT THE JANITOR'S CLOSETS. |
| |
| 19) PLEASE INDICATE THE LOCATIONS OF THE POOL HEATERS |
| AND PROVIDE EQUIPMENT SCHEDULES AND MANUFACTURER'S |
| SPECIFICATIONS. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |