2016-07-25 05:35:36 | 1.SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 FBC-FUEL |
| GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC. |
| G2413. |
| |
| 2. IS ALL THE PIPE BEING INSTALLED SCH. 40 METAL PIPE? |
| INDICATE ALL TYPE OF PIPE MATERIAL ON THE PLANS. WPB |
| AMENDMENTS TO FBC SEC.107.2.1. |
| |
| 3..SUBMIT MANUFACTURER'S SPECIFICATION SHEETS / |
| INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 |
| FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. THE |
| SUBMITTED SPECS FOR THE RANGE AND WATER HEATER DO NOT |
| SSHOW THE APPLIANCES ARE LISTED AND LABELED. |
| |
| 4. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (METER |
| OR MP REGULATOR) TO THE MOST REMOTE OUTLET IN THE |
| BUILDING AND / OR SYSTEM PER THE 2014 FBC-FUEL GAS |
| SEC.402.4.1 OR 2014 FBC-RES. SEC. G 2413.3. |
| |
| 5. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2014 |
| FBC-FUEL GAS CODE SEC.304.1 OR 2014 FBC-RES. SEC. G |
| 2407. |
| |
| 6. INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. |
| SEC. G2413.2. . |
| |
| 7. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND |
| TERMINATION OF THE GAS VENTS PER 2014 FBC-FUEL GAS |
| SECS. 502 THRU 505 OR 2014 FBC-RES. SEC.G2426. |
| |
| 8. SUBMIT COPIES OF THE SIZING TABLES BEING USED TO |
| DESIGN THE SYSTEM OR INDICATE WHICH SIZING TABLES FROM |
| WHICH STANDARD ARE BEING USED TO DESIGN THE SYSTEM. WPB |
| AMEND. TO FBC SEC. 107.3.5.3, FBCR SEC.G2413.3, FGC |
| SEC. 402.3. |
| |
| 9) SUBMIT A FLOOR PLAN SHOWING THE LOCATION OF ALL GAS |
| APPLIANCES.WPB AMEND. TO FBC SEC. 107.2.1. |
| |
| 10) INDICATE ON THE APPLIANCE SPECIFICATIONS THE |
| SPECIFIC MODEL BEING INSTALLED ( TANKLESS WATER |
| HEATER). |
| |
| 11) SHOW THE LOCATION ON THE GAS RISER DIAGRAM AND ALSO |
| ON THE REQUESTED FLOOR PLAN.WPB AMEND. TO FBC SEC. |
| 107.2.1. |
| |
| 12) THERE ARE TWO PERMIT APPLICATIONS FOR THE GAS |
| INSTALLATION. THE CONTRACTOR INFORMATION ON ONE OF THE |
| APPLICATIONS HAS BEEN ERASED. CLARIFY. |
| |
| PLUMBING PLAN REVIEW |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805-6692 |
| [email protected] |
| |
| |
| |