Plan Review Notes
Plan Review Notes For Permit 16070715
Permit Number 16070715
Review Stop B
Sequence Number 2
Notes
Date Text
2016-11-23 06:50:59****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 14. SPECIFY ACCESSIBLE MEANS OF EGRESS SELECTED, FBC
 BUILDING 1007, FBC ACCESSIBILITY 207. REVISE PLAN TO
 SHOW COMPLIANCE WITH METHOD SELECTED IF ALL ITEMS ARE
 NOT IMMEDIATELY APPARENT (FOR EXAMPLE, IBC2000 ELEVATOR
 AS MEANS OF EGRESS COMPONENT).
  
 2ND REVIEW, IT IS NOT CLEAR WHICH METHOD WAS SELECTED.
 RESPONSE STATES STAIRS ARE THE ACCESSIBLE MEANS OF
 EGRESS.
  
 APPLICABLE TO THE TRANSIT PORTION OF THIS BUILDING, SEE
 FBC 1007, ACCESSIBLE MEANS OF EGRESS SHALL BE PROVIDED
 IN ACCORDANCE WITH THE APPLICABLE SECTIONS OF THE FBC
 ACCESSIBILITY.
  
 FBC ACCESSIBILITY 207, MEANS OF EGRESS SHALL COMPLY
 WITH IBC 2000 WITH 2001 SUPPLEMENT 1003.2.13 OR IBC
 2003 1007.
  
 YOU MAY FIND THIS SITE HELPFUL:
  
 HTTPS://WWW.ACCESS-BOARD.GOV/GUIDELINES-AND-STANDARDS/B
 UILDINGS-AND-SITES/ABOUT-THE-ADA-STANDARDS/GUIDE-TO-THE
 -ADA-STANDARDS/CHAPTER-4-ACCESSIBLE-MEANS-OF-EGRESS?TMP
 L=COMPONENT&PAGE=
  
 REVISE PLAN TO CLARIFY COMPLIANCE.
  
 15. A200 REGARDING SIGNAGE ITEM 2; CLARIFY ACCESSIBLE
 MEANS OF EGRESS SELECTED AND REVISE NOTE IF APPLICABLE.
  
 RESPONSE STATES REVISION IS NOT NECESSARY; THIS ITEM
 NOT REVIEWED AT THIS TIME PENDING RESPONSE TO ITEM 14.
  
 16 - 26, OK.
  
 27. SEE PLUMBING COMMENTS REGARDING ACCESSIBILITY AND
 FAIR HOUSING AND REVISE PLAN TO SHOW COMPLIANCE.
 DISREGARD IF COMMENT IS NOT APPLICABLE.
  
 28 - 31. OK
  
  
 32. REVISE PLAN TO SHOW THE 18IN MANEUVERING CLEARANCE,
 PULL SIDE (FBC ACCESSIBILITY 404.2.4), DOOR LOCATED ON
 SHEET A301, DOOR R03H (FBC 5TH ED. ACCESSIBILITY
 206.4.5), OR OTHERWISE INDICATE THAT THIS WILL NOT BE
 THE ONLY DOOR SERVING A TENANT SPACE, OR PROVIDE AN
 OPENER.
  
 2ND REVIEW, THIS WAS DISCUSSED, BUT IT IS NOT CLEAR HOW
 THIS WAS ADDRESSED. PLAN HAS BEEN REDLINED (18IN
 REQUIRED), AND WHEN SCALED APPEARS COMPLIANT. NO ACTION
 REQUIRED UNLESS THIS SHEET IS REVISED FOR OTHER
 REASONS.
  
 33 - 40. OK
  
 41. STANDBY POWER, FBC 403.4.8, EMERGENCY POWER 403.4.9
 REQUIRED.
  
 2ND REVIEW, THE SPECIFICATION BOOK WAS NOT REVIEWED AND
 IS CONSIDERED SUPPLEMENTARY TO THE PLANS. THIS ITEM
 WILL BE A PROVISO BUT CLARIFICATION REGARDING THE
 ELEVATOR(S) REQUIRED FOR THE ACCESSIBLE MEANS OF EGRESS
 IS REQUESTED.
  
 42-50. OK
  
 51. SMOKE CONTROL REFERENCED, BUT REPORT NOT PROVIDED,
 FBC 909.4.
  
 SEE MECHANICAL COMMENTS AND ADDRESS ACCORDINGLY.
  
 52. OK
  
 53. THIS PERMIT WILL BE ISSUED WITH THE FOLLOWING
 PROVISOS:
  
 A. PROVISO: TCO AT EACH PHASE IS SUBJECT TO APPROVAL OF
 THE BUILDING OFFICIAL (OR HIS REPRESENTATIVE) AND FIRE
 DEPARTMENT, AND MAY INCLUDE ITEMS NOT WITHIN THE SCOPE
 OF THIS REVIEW. A TCO REQUEST FORM AND FEE WILL BE
 REQUIRED. THIS FORM IS AVAILABLE UPON REQUEST BY EMAIL.
  
 C. SEPARATE PERMITS (APPLICATION, PLANS, REVIEWS, AND
 FEES) REQUIRED FOR ALL ITEMS OTHER THAN MECHANICAL,
 ELECTRICAL, AND PLUMBING FOR THE BUILDING AS SHOWN ON
 THE PLANS. THIS INCLUDES SIGNS, FIRE ALARM, FIRE
 SPRINKLERS, LANDSCAPING.
  
 SUB PERMITS (APPLICATION, SUB PERMIT FEE) ARE REQUIRED
 FOR MECHANICAL, ELECTRICAL, AND PLUMBING PRIOR TO
 COMMENCEMENT OF WORK.
  
 A ROOFING SUB PERMIT IS REQUIRED PRIOR TO COMMENCEMENT
 OF ROOFING WORK. AS ROOF DOCUMENTS HAVE NOT BEEN
 PROVIDED, THIS IS A DEFERRED SUBMITTAL. PRODUCT
 APPROVALS REVIEWED BY DESIGNER OF RECORD, SELECTED
 ASSEMBLY, ENGINEERING IF APPLICABLE ARE TO BE SUBMITTED
 AS A REVISION WITH A ROOF PERMIT APPLICATION.
  
 D. COMPONENTS AND CLADDING PRODUCT APPROVALS ARE TO BE
 REVIEWED BY DESIGNER OF RECORD AND SUBMITTED AS A
 REVISION PRIOR TO INSTALLATION.
  
 E. PROVISO, THIS STUCTURE SERVES A BUILDING WHICH HAS
 NOT BEEN REVIEWED BY THIS DEPARTMENT (TRAIN STATION).
 ACCESSIBLE ROUTE IN COMPLIANCE WITH FBC 5TH EDITION
 ACCESSIBILITY IS REQUIRED AND WILL BE VERIFIED IN THE
 FIELD.
  
 F. PROVISO, THE PROJECT MANUAL HAS NOT BEEN REVIEWED.
 DOOR HARDWARE TO COMPLY WITH FBC BUILDING, FBC
 ACCESSIBILITY.
 G. PROVISO, ALL DOORS AND GATES IN THE MEANS OF EGRESS
 FOR ASSEMBLY OCCUPANCY ARE TO INCLUDE PANIC DEVICES OR
 FIRE EXIT HARDWARE, FBC 1008.
 H. PROVISO, PRODUCT APPROVALS FOR COMPONENTS AND
 CLADDING HAVE NOT BEEN SUBMITTED. THEY MAY BE
 SUBMITTED, PRIOR TO INSTALLATION, AS A REVISION, PRIOR
 TO INSTALLATION.
  
 I. PROVISO, FLOORING UNDERLAYMENT IS TO COMPLY WITH FBC
 1207.2, 1207.3, AND 603.1. THIS MAY BE A DEFERRED
 SUBMITTAL. IF DEFERRED, THE TEST REPORTS ARE TO BE
 SUBMITTED AS A REVISION PRIOR TO INSTALLATION. AS
 STRUCTURAL PLANS SHOW AN 8 INCH SLAB, PRODUCTS TESTED
 WITH EITHER A 6 INCH OR AN 8 INCH SLAB ARE ACCEPTABLE.
  
 A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR
 BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90.
 THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM
 CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN
 DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC
 OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN
 IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN
 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH
 ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED
 GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723.
  
  