2016-10-05 09:22:22 | PLEASE RESPOND TO COMMENTS IN WRITING. |
| |
| BACKFLOWS MUST BE AS CLOSE TO CITY OF WPB SOURCE AS |
| POSSIBLE. |
| |
| IF BACKFLOWS ARE SHOWN IN THE CLOSEST LOCATION AS |
| POSSIBLE, REPLY IN WRITING TO THIS COMMENT SO THAT A |
| MEETING CAN BE ARRANGED WITH UTILITIES CUSTOMER SERVICE |
| TO GET A VARIANCE IF THERE IS LEGITIMATE HARDSHIP. AN |
| ENLARGE VIEW OF THE WATER METER AND BACLFLOWS LOCATIONS |
| MAY BE ADEQUATE TO BETTER DESCRIBE THE CLEARANCES |
| AROUND THESE CONSTRICTED AREAS. ENOUGH CLEARANCE SHALL |
| BE (18") AROUND THE DEVICES TO ALLOW PROPER MAINTENANCE |
| SPACE. BACKFLOWS JUST INSIDE BUILDING OR HARD SURFACE |
| SHALL HAVE A FLOOR DRAIN TO AVOID FLOODING WHEN |
| BACKFLOWS ARE NOT WORKING PROPERLY OR WHEN ROUTINE |
| MAINTENANCE IS REQUIRED. |
| |
| SUBMIT SHOP DRAWINGS FOR DCDA AND RPPA FOR DOMESTIC, |
| FIRE, IRRGIGATION. ETC./IMPORTANT MESSAGE: AS OF |
| DECEMBER 20, 2015 THE CITY OF WEST PALM BEACH. |
| CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED MAKING |
| KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD FREE." |
| FOR MORE INFORMATION REFER TO THE LINK BELOW: HTTP://WP |
| B.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLICATIONS/B |
| ACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL |
| |
| MANUEL JULIAN GONZALEZ |
| ENGINEERING PROJECT COORDINATOR |
| PUBLIC WORKS DEPARTMENT |
| 401 CLEMATIS STREET, 4TH FLOOR |
| WEST PALM BEACH, FL 33401 |
| (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| MAIN PHONE: (561) 822-1200 |
| DIRECT: (561) 494-1085 |
| FAX: (561) 494-1116 |
| EMAIL: [email protected] |
| HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS |
| /FORMS,-PERMITS-APPLICATIONS |
| |
| |