2016-07-26 13:31:40 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| 1) SHEET D 1.0 - THE PLAN INDICATES THE REMOVAL 9AND |
| NON-REPLACEMENT) OF THE ELEVATOR LOBBY DOORS. ELEVATOR |
| DOORS CAN BE REMOVED UNDER CERTAIN EXEMPTIONS. SOME |
| ELEVATORS DOORS ARE REQUIRED TO ASSIST IN FIRE |
| PROTECTION, PRESSURIZATION, SMOKE CONTROL , ETC. |
| |
| PLEASE PROVIDE A REVIEW FROM THE ENGINEER OF RECORD |
| THAT THE PURPOSE AND FUNCTION OF ELEVATOR LOBBY DOORS |
| HAS BEEN REVIEWED AND VERIFIED. ADDITIONALLY, THE |
| REMOVEAL OF THESE DOORS IS WITHIN CODE REQUIRMENTS,( |
| PROVIDE THE CODE) AND WILL NOT AFFECT THE PREVIOUSLY |
| ENGINEERED LIFE SAFETY FIRE PROTECTIONS SYSTEMS OF THE |
| BUILDING. |
| |
| |
| 2) SHEET E 2.1 - NOTE # 2 INDICATES WORK ON FIRE ALARM |
| DEVICES. |
| |
| PLEASE PROVIDE A NOTE INDICATING THAT ALL WORK THE FIRE |
| ALARM SYSTEM SHALL BE DONE UNDER SEPARATE SHOP DRAWINGS |
| BY CERTIFIED LIFE SAFETY CONTRACTORS. |
| |
| |
| |
| 3) SHEET E 2.1 - INFORMATIONAL PURPOSES ONLY : |
| |
| THERE DOES NOT APPEAR ANY VISUAL FIRE ALARM DEVICES. |
| THOUGH THIS IS A CONCEPTUAL DRAWING, ENSURE THAT THE |
| FIRE ALARM SHOP DRAWINGS INCLUDE ANY APPLICABLE VISUAL, |
| AS WELL AS, AUDIBLE DEVICES. |
| |
| |
| 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |