Date |
Text |
2016-07-30 10:18:20 | 1) THE PLANS REQUIRE REVIEW AND APPROVAL FROM THE DEPT. |
| OF BUSINESS AND PROFESSIONAL REGULATION, DIVISION OF |
| HOTELS AND RESTAURANTS.WPB AMEND. TO FBC SEC.102.1.2. |
| 2) SHT. A-300 - THE INSTALLATION OF GRAB BARS SHALL BE |
| MEASURED FROM THE FINISH FLOOR TO THE TOP OF THE |
| GRIPPING SURFACE PER 2014 FBC-ACCESSIBILITY SEC. 609.4. |
| 3) SHT.P-1 - THE PLAN SHOWS THE DISCHARGE FROM THE ICE |
| MAKERS, GLASS RACK, ICE BIN & BAR SINK DISCHARGING INTO |
| THE GREASY WASTE SYSTEM. THIS IS NOT PERMITTED PER THE |
| 2014 FPC SEC.1003.2.WASTES THAT DO NOT REQUIRE |
| TREATMENT OR SEPARATION SHALL NOT BE DISCHARGED INTO |
| ANT INTERCEPTOR OR SEPARATOR. |
| 4) SHT.P-1 - THE SANITARY RISER APPEARS TO SHOW THE |
| FRYERS DISCHARGING INDIRECTLY INTO THE FLOOR SINK FOR |
| THE GREASY WASTE SYSTEM. CLARIFY. |
| 5) A SEPARATE PERMIT IS REQUIRED FOR THE BACKFLOW |
| PREVENTER.WPB AMEND. TO FBC SEC. 105.1. |
| 6) SUBMIT A DETAIL FOR THE HOT WATER RETURN PIPING. IT |
| IS DIFFICULT TO SEE HOW/WHERE THE RETURN LINE IS |
| CONNECTED. IT APPEARS LIKE THE FLOW ARROW AT THE CHECK |
| VALVE IS REVERSED. CLARIFY. |
| 7) BACKFLOW PREVENTION DEVICES ARE REQUIRED ON THE |
| ICEMAKERS. 2014 FPC SEC.608.3. |
| 8) THE GREASE INTERCEPTOR SHALL BE SIZED BASED ON THE |
| NUMBER OF SEATS IN THE DINING AREA WHICH INCLUDES THE |
| EXTERIOR SEATING AREA . HAVE THE SEATS IN WHAT APPEARS |
| TO BE BOOTHS BEEN INCLUDED IN THE COUNT? CLARIFY. |
| 9) SHT. P-3 - REFERENCE IS MADE TO TABLE 709.1 OF THE |
| PLUMBING CODE FOR GREASE SIZING CALCULATIONS. TABLE |
| 709.1 IS FOR DRAINAGE FIXTURE UNITS, NOT FOR GREASE |
| SIZING CALCULATIONS. CLARIFY. THERE IS ALSO A REFERENCE |
| TO TABLE 1003.5.1 FOR THE SIZING FORMULA FOR GREASE |
| INTERCEPTORS. THERE IS NO SUCH TABLE IN THE PLUMBING |
| CODE. CLARIFY. |
| 10) SHT.A-102 - SCUPPERS SHALL BE SIZED IN ACCORDANCE |
| WITH TABLE 1106.7 OF THE 2014 FPC.THE SIZING SHALL BE |
| BASED ON A 5 INCH PER HOUR RATE OF RAINFALL. INDICATE |
| THE HEAD IN INCHES FOR THE OVERFLOW SCUPPERS AND SHOW |
| THE SQUARE FOOT AREA BEING DRAINED BY EACH SCUPPER. |
| 11) THE SAMPLING PORT SHOWN ON THE PLANS IS NOT AN |
| ACCEPTABLE DESIGN PER THE CWPB UTILITIES DEPT. A |
| PRE-MANUFACTURED SAMPLING PORT OR A DIFFERENT DESIGN |
| MAY BE ACCEPTABLE. YOU MAY CONTACT KELLY CRANFORD IN |
| THE ENGINEERING DIVISION FOR ASSISTANCE. 561-835-7423. |
| 12) THE GAS SHALL BE PERMITTED UNDER A SEPARATE |
| PERMIT.WPB AMEND. TO FBC SEC. 105.1. |
| |
| PLUMBING PLAN REVIEW |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805-6692 |
| [email protected] |
| |
| |
| |