Notes |
Date |
Text |
2016-08-18 16:45:51 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. REVISE SITE PLAN TO INCLUDE THE FOLLOWING, PER CRS | | REQUIREMENT RA3 (SENT TO CONTRACTOR VIA EMAIL): | | | | A. THE SITE PLAN'S SCALE AND NORTH ORIENTATION ARROW; | | B. THE PARCEL BOUNDAIRES AND THE LOCATION AND NAMES OF | | ADJACENT STREETS; | | C. N/A (NO WATERCOURSES LOCATED ON PARCEL) | | D. ALL FLOODPLAIN BOUNDARIES THAT RUN THROUGH THE | | PARCEL; | | E. N/A | | F. ALL DRAINAGE AND UTILITY EASEMENTS; | | G. ALL AREAS TO BE CLEARED, CUT, GRADED, OR FILLED; AND | | H. THE LOCATOIN OF THE PROPOSED STRUCTURE. | | | | 2. REVISE SITE PLAN TO INCLUDE: | | A. THE FOOTPRINT OF ALL EXISTING AND PROPOSED BUILDINGS | | AND BUILDING ADDITIONS | | B. PROVIDE THE ELEVATION OF THE PROPOSED FINISHED FLOOR | | | | 3. THE FIRST INSPECTION FOR RA3 IS NOT APPLICABLE TO | | THIS PROJECT. | | | | 4. THE SECOND INSPECTION IS CONDUCTED WHEN THE LOWEST | | FLOOR IS BUILT. THE SURVEYED LOWEST FLOOR ELEVATION IS | | REQUIRED. THIS IS REQUIRED PRIOR TO SETTING THE | | TRAILER. | | IF YOU HAVE TOPOS AVAILABLE AND THIS TEMPORARY | | STRUCTURE IS BEING SET DIRECTLY ON THE GROUND, AND WILL | | BE SET AT 7.5' NGVD29 OR ABOVE, THE TOPOS ARE | | SUFFICIENT. | | | | 5. THE THIRD INSPECTION IS CONDUCTED WHEN THE PROJECT | | IS FINISHED. A "FINISHED CONSTRUCTION" ELEVATION | | CERTIFICATE IS REQUIRED. | | | | |
|