2017-07-31 17:34:50 | 4TH REVIEW FBC-2014 MECHANICAL |
| CANOPY HOTEL BY HILTON |
| PERMIT #16061443 |
| 7/31/17 |
| |
| 1) IN REFERENCE TO PREVIOUS COMMENTS #9 & 16, THE USE |
| OF FLAMEBAR DUCT TO CREATE CONTINUOUS VERTICAL AND |
| HORIZONTAL FIRE-RATED SHAFTS FOR SMOKE CONTROL AND |
| TOILET EXHAUST SYSTEMS WILL REQUIRE AN ALTERNATE |
| MATERIALS AND METHOD APPROVAL BY THE BUILDING OFFICIAL. |
| CURRENTLY, THERE ARE NO PROVISIONS IN THE FIFTH EDITION |
| FLORIDA BUILDING CODE 2014 THAT ALLOW FOR THE USE OF |
| FLAMEBAR DUCT IN |
| |
| THESE APPLICATIONS- SEE SECTION 713 SHAFT ENCLOSURES. |
| ADDITIONALLY THE USE OF FLAMEBAR DUCT FOR THE SMOKE |
| CONTROL SYSTEMS IS NOT SPECIFIED IN THE SUBMITTED |
| RATIONAL ANALYSIS REPORT FOR THE CANOPY HOTEL BY SLS |
| FIRE PROTECTION ENGINEERS- SEE PAGE 20 OF THE REPORT. |
| THE FBC-14 DOES ALLOW FOR AN APPROVAL TO USE THE DUCTS |
| UNDER SECTION 104.11 ALTERNATE MATERIALS, DESIGN AND |
| |
| METHODS OF CONSTRUCTION AND EQUIPMENT. IT IS THE TASK |
| OF THE DESIGN PROFESSIONAL OF RECORD TO PROVIDE |
| SUPPORTING EVIDENCE, REPORTS, AND TESTING DATA AND |
| SUBMIT A REQUEST TO THE BUILDING OFFICIAL FOR AN |
| APPROVAL. ADDITIONALLY, PLEASE SEE SECTION 703 FIRE |
| RESISTANCE RATINGS AND FIRE TESTS FOR ASTM AND UL |
| LISTING AND ASSEMBLY INFORMATION. |
| |
| 2) SHEET M2.01, ADVISORY NOTE: ALTHOUGH THE KITCHEN |
| HOOD EXHAUST SYSTEM IS UNDER SEPARATE PERMIT, ACCESS TO |
| REQUIRED GREASE DUCT CLEANOUTS SHALL BE PROVIDED WHERE |
| THE DUCTS ARE RUNNING ABOVE THE FPL VAULT- SECTIONS |
| 306.1 AND 306.5. PLEASE CONSULT WITH FPL REGARDING THIS |
| MATTER AND PROVIDE DETAILS AND NOTES ON THE PLANS. |
| |
| 3) M2.01, ADVISORY NOTE: PLEASE SEE SECTION 506.3.6 |
| REGARDING THE REQUIRED 18" REQUIRED CLEARANCE TO |
| COMBUSTIBLES FOR THE GREASE DUCTS. IF THE INTENTION IS |
| TO USE A UL APPROVED DUCT SYSTEM, OR A FIRE-WRAP, |
| SPECIFICATIONS FOR EACH SYSTEM SHALL BE PROVIDED. |
| PLEASE SEE SECTION 506.3.11.2 FOR FIELD APPLIED GREASE |
| DUCT ENCLOSURE. IT IS IMPORTANT TO NOTE THAT WRAPS ARE |
| REQUIRED TO BE |
| |
| APPLIED CONTINUOUSLY WHICH MAY POSE A PROBLEM WHEN |
| USING INLINE FAN KEF-1. |
| |
| 3) THE REQUESTED DETAILS FOR CEILING ACCESS PANEL |
| CONSTRUCTION ARE NOT SHOWN ON SHEET A5.18 AS INDICATED |
| IN THE NARRATIVE RESPONSE. THESE DETAILS MAY BE |
| DEFERRED IF NECESSARY, BUT PLEASE NOTE THAT PANELS AS |
| SHOWN ON M2.01 DO NOT APPEAR LARGE ENOUGH TO REMOVE THE |
| FAN COIL UNITS. SECONDLY, THERE APPEARS TO BE A WOOD |
| TRELLIS BLOCKING ACCESS TO THE PANELS AND THE UNITS- |
| |
| PLEASE CLARIFY. |
| |
| 4) M2.02: PLEASE PLACE A NOTE ON THE PLAN PURSUANT TO |
| SECTION 504.4 WHICH PROHIBITS CLOTHES DRYER EXHAUST |
| DUCTS FROM RUNNING THROUGH OTHER DUCTS OR PLENUMS. |
| |
| 5) M2.03: REFER TO SECTION 404.1(2) WHICH REQUIRES |
| NITROGEN DIOXIDE SENSORS TO BE USED IN CONJUNCTION WITH |
| CO SENSORS IN THE PARKING GARAGES- PLEASE REVISE THE |
| PLAN ACCORDINGLY. |
| |
| 6) ADVISORY: THE CURRENT LIST OF DEFERRED SUBMITTALS |
| FOR THE PROJECT INCLUDE: COMMISSIONING PLAN, FLAMEBAR |
| DUCT SPECIFICATIONS AND INSTALLATION INSTRUCTIONS, |
| KITCHEN APPLIANCE SPECIFICATIONS, DRYER AND IRONER |
| SPECIFICATIONS, CARBON MONOXIDE/NITROGEN DIOXIDE |
| DETECTORS, CEILING ACCESS PANELS, FIRE/SMOKE DAMPERS, |
| FIRE DAMPERS, MOTORIZED OUTSIDE AIR, DAMPER ACCESS |
| PANELS, |
| |
| DUCT SMOKE DETECTORS, LOUVERS, GREASE RESEVOIRS, AC |
| SYSTEMS, DUCTS, DUCT INSULATIONS, AND REFRIGERANT PIPE |
| INSULATIONS. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 401 CLEMATIS STREET |
| WEST PALM BEACH FL 33401 |
| 561-805-6719 |
| [email protected] |
| |