2017-03-16 11:54:20 | 3RD REVIEW FBC-2014 MECHANICAL |
| THE CANOPY HOTEL |
| PERMIT #16061443 |
| 3/16/17 |
| |
| 1) SHEET M2.01-NOTE #16: CLARIFY HOW THE SYSTEM |
| SPECIFIED FOR ADJUSTING MAKEUP AIR TEMPERATURE WILL |
| WORK WITH KS # 1 & 2 DIRECTLY PROVIDING UNTEMPERED |
| MAKEUP AIR FROM THE OUTDOORS. TYPICALLY, |
| PRE-CONDITIONED AIR MUST BE PROVIDED TO MEET COMPLIANCE |
| WITH SECTION 508.1.1 |
| |
| 2) M2.01 & M601: ACCORDING TO SECTION 304.9.3 FBC-14 |
| FUEL GAS A MECHANICAL SYSTEM (FC-1.5) SHALL SUPPLY THE |
| COMBUSTION AIR RATE OF 350 CFMS IN ADDITION TO THE |
| VENTILATION RATE WHICH IS CALCULATED AT 145 CFMS. |
| |
| 3) M2.01: SHOW THE LOCATION OF THE GREASE RESERVOIR AND |
| PROVIDE A DETAIL SHOWING THE RESERVOIR CONNECTION TO |
| THE FLOOR DRAIN. PLEASE REVISE THE PLUMBING RISER |
| DRAWING TO IDENTIFY WHICH FLOOR DRAIN IS THE GREASE |
| RECEPTOR. |
| |
| 4) M0.00 & M2.01: ADVISORY: THE FLAMEBAR DUCTWORK HAS |
| BEEN DESIGNATED AS A DEFERRED SUBMITTAL. PLEASE NOTE |
| COMPLETE SPECIFICATIONS FOR USE OF THE DUCTWORK FOR |
| GREASE EXHAUST MUST BE SUBMITTED PER NOTE # 1 ON M0.00. |
| |
| 5) M2.01: ADVISORY: SPECIFICATIONS FOR THE 3HR RATED |
| FLAMEBAR DUCT AND FIRESTOPPING DETAIL FOR THE VAULT |
| CEILING PENETRATION ARE REQUIRED BUT MAY BE A DEFERRED |
| SUBMITTAL. |
| |
| 6) A3.01 & M2.01: SHOW HOW ACCESS WILL BE PROVIDED TO |
| FC-1.6, 1.7, & 1.8 WHICH ARE LOCATED ABOVE THE DRYWALL |
| CEILING WHICH IS SPECIFIED AT ELEV =+ 16'0". PLEASE |
| REFER TO SECTION 306.5 WHICH REQUIRES AN APPROVED MEANS |
| OF ACCESS. |
| |
| 7) M0.00- CONSTRUCTION NOTE #18: PROVIDE CONSTRUCTION |
| DETAILS FOR INSTALLATION OF THE ACCESS PANELS WHERE |
| REQUIRED. PLEASE NOTE THAT PER SECTION 306.1 THE ACCESS |
| OPENINGS MUST BE LARGE ENOUGH FOR REPLACEMENT OF ALL |
| MECHANICAL EQUIPMENT, AND NOT REQUIRE DISABLING OR |
| REMOVING ANY PERMANENT CONSTRUCTION. |
| |
| 8) M2.01: THERE APPEAR TO BE FIRE DAMPERS MISSING WHERE |
| THE O/A DUCTS ARE PENETRATING THE FIRE PUMP/WATER |
| PUMP/STAIR #3 WALLS. |
| . |
| 9) M2.02: REFER TO SECTION 1022 FBC-14 BUILDING AND |
| RELOCATE THE DUCTS PENETRATING AND TRAVERSING THROUGH |
| STAIR #2, UNLESS THEY ARE PLACED IN A 2HR FIRE-RATED |
| ENCLOSURE (DETAILS NOT SHOWN ON THE ARCH. OR STRUCTURAL |
| SHEETS). |
| |
| 10) M2.03: ADVISORY- THE MANUFACTURER SPECIFICATIONS |
| FOR THE VRF CONDENSERS MUST INDICATE THEY CAN BE |
| LOCATED IN THE INTERIOR OF THE BUILDING. |
| |
| 11) M2.03, 2.04, 2.05: ADVISORY- BOLLARD PLACEMENT FOR |
| PROTECTION OF THE FANS IN THE GARAGES WILL BE VERIFIED |
| IN THE FIELD. |
| |
| 12) M2.05: THE SHAFT ENCLOSING THE OAR-1 DUCT SHALL BE |
| CONTINUOUS THROUGH THE ELEVATOR LOBBY AND GARAGE PER |
| SECTIONS 707.5, 711.4 & 713.5 FBC-14 BUILDING. |
| |
| 13) M2.06, 2.07, & 2.08: IT APPEARS THAT THERE ARE |
| MISSING FSD SYMBOLS AT THE PENETRATIONS OF THE O/A |
| DUCTS ON EACH FLOOR INTO THE MAIN SHAFT. |
| |
| 14) M2.07: PLEASE PROVIDE THE ROOM NUMBERS ON THE PLAN |
| FOR COMPLETE AC CALCULATION REVIEW. |
| |
| 15) M3.01: THE TRANSFER 14"X8" TRANSFER DUCTS IN THE |
| KING SUITES F AND F-ADA ARE UNDERSIZED PER SECTION |
| 601.5 EXCEPTION 3. A MINIMUM OF 150 SQ. INCHES IS |
| REQUIRED. |
| |
| 16) M2.08A & M4.01: THE TOILET EXHAUST RISER SHAFTS |
| SHALL BE CONTINUOUS THROUGH THE INTERSTITIAL SPACE UP |
| TO THE ROOF SLAB TERMINATION PER SECTION 713.5 & 713.12 |
| FBC-14 BUILDING. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 401 CLEMATIS STREET |
| WEST PALM BEACH FL 33401 |
| 561-805-6719 |
| [email protected] |
| |
| |
| |