2017-03-16 11:54:203RD REVIEW FBC-2014 MECHANICAL
 THE CANOPY HOTEL
 PERMIT #16061443
 3/16/17
  
 1) SHEET M2.01-NOTE #16: CLARIFY HOW THE SYSTEM
 SPECIFIED FOR ADJUSTING MAKEUP AIR TEMPERATURE WILL
 WORK WITH KS # 1 & 2 DIRECTLY PROVIDING UNTEMPERED
 MAKEUP AIR FROM THE OUTDOORS. TYPICALLY,
 PRE-CONDITIONED AIR MUST BE PROVIDED TO MEET COMPLIANCE
 WITH SECTION 508.1.1
  
 2) M2.01 & M601: ACCORDING TO SECTION 304.9.3 FBC-14
 FUEL GAS A MECHANICAL SYSTEM (FC-1.5) SHALL SUPPLY THE
 COMBUSTION AIR RATE OF 350 CFMS IN ADDITION TO THE
 VENTILATION RATE WHICH IS CALCULATED AT 145 CFMS.
  
 3) M2.01: SHOW THE LOCATION OF THE GREASE RESERVOIR AND
 PROVIDE A DETAIL SHOWING THE RESERVOIR CONNECTION TO
 THE FLOOR DRAIN. PLEASE REVISE THE PLUMBING RISER
 DRAWING TO IDENTIFY WHICH FLOOR DRAIN IS THE GREASE
 RECEPTOR.
  
 4) M0.00 & M2.01: ADVISORY: THE FLAMEBAR DUCTWORK HAS
 BEEN DESIGNATED AS A DEFERRED SUBMITTAL. PLEASE NOTE
 COMPLETE SPECIFICATIONS FOR USE OF THE DUCTWORK FOR
 GREASE EXHAUST MUST BE SUBMITTED PER NOTE # 1 ON M0.00.
  
 5) M2.01: ADVISORY: SPECIFICATIONS FOR THE 3HR RATED
 FLAMEBAR DUCT AND FIRESTOPPING DETAIL FOR THE VAULT
 CEILING PENETRATION ARE REQUIRED BUT MAY BE A DEFERRED
 SUBMITTAL.
  
 6) A3.01 & M2.01: SHOW HOW ACCESS WILL BE PROVIDED TO
 FC-1.6, 1.7, & 1.8 WHICH ARE LOCATED ABOVE THE DRYWALL
 CEILING WHICH IS SPECIFIED AT ELEV =+ 16'0". PLEASE
 REFER TO SECTION 306.5 WHICH REQUIRES AN APPROVED MEANS
 OF ACCESS.
  
 7) M0.00- CONSTRUCTION NOTE #18: PROVIDE CONSTRUCTION
 DETAILS FOR INSTALLATION OF THE ACCESS PANELS WHERE
 REQUIRED. PLEASE NOTE THAT PER SECTION 306.1 THE ACCESS
 OPENINGS MUST BE LARGE ENOUGH FOR REPLACEMENT OF ALL
 MECHANICAL EQUIPMENT, AND NOT REQUIRE DISABLING OR
 REMOVING ANY PERMANENT CONSTRUCTION.
  
 8) M2.01: THERE APPEAR TO BE FIRE DAMPERS MISSING WHERE
 THE O/A DUCTS ARE PENETRATING THE FIRE PUMP/WATER
 PUMP/STAIR #3 WALLS.
 .
 9) M2.02: REFER TO SECTION 1022 FBC-14 BUILDING AND
 RELOCATE THE DUCTS PENETRATING AND TRAVERSING THROUGH
 STAIR #2, UNLESS THEY ARE PLACED IN A 2HR FIRE-RATED
 ENCLOSURE (DETAILS NOT SHOWN ON THE ARCH. OR STRUCTURAL
 SHEETS).
  
 10) M2.03: ADVISORY- THE MANUFACTURER SPECIFICATIONS
 FOR THE VRF CONDENSERS MUST INDICATE THEY CAN BE
 LOCATED IN THE INTERIOR OF THE BUILDING.
  
 11) M2.03, 2.04, 2.05: ADVISORY- BOLLARD PLACEMENT FOR
 PROTECTION OF THE FANS IN THE GARAGES WILL BE VERIFIED
 IN THE FIELD.
  
 12) M2.05: THE SHAFT ENCLOSING THE OAR-1 DUCT SHALL BE
 CONTINUOUS THROUGH THE ELEVATOR LOBBY AND GARAGE PER
 SECTIONS 707.5, 711.4 & 713.5 FBC-14 BUILDING.
  
 13) M2.06, 2.07, & 2.08: IT APPEARS THAT THERE ARE
 MISSING FSD SYMBOLS AT THE PENETRATIONS OF THE O/A
 DUCTS ON EACH FLOOR INTO THE MAIN SHAFT.
  
 14) M2.07: PLEASE PROVIDE THE ROOM NUMBERS ON THE PLAN
 FOR COMPLETE AC CALCULATION REVIEW.
  
 15) M3.01: THE TRANSFER 14"X8" TRANSFER DUCTS IN THE
 KING SUITES F AND F-ADA ARE UNDERSIZED PER SECTION
 601.5 EXCEPTION 3. A MINIMUM OF 150 SQ. INCHES IS
 REQUIRED.
  
 16) M2.08A & M4.01: THE TOILET EXHAUST RISER SHAFTS
 SHALL BE CONTINUOUS THROUGH THE INTERSTITIAL SPACE UP
 TO THE ROOF SLAB TERMINATION PER SECTION 713.5 & 713.12
 FBC-14 BUILDING.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved