2017-03-21 14:45:33 | BUILDING PLAN REVIEW |
| W. P. B. PERMIT: 16061443 |
| ADD: 718 S. DIXIE HWY. / CANOPY BY HILTON 14 STORY |
| CONT: TBD/ TO BE DETERMINED |
| TEL: 561-718-5987 / MARGARET LEON |
| E-MAIL: MLEONDADLP.COM |
| |
| 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH |
| AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1, |
| ADMINISTRATION |
| |
| 3RD REVIEW |
| DATE: TUES. MARCH 21/2017 |
| ACTION: DENIED |
| |
| 1) COMPLIED. 13 STORIES INCLUDING THE HABITABLE POOL, |
| POOL DECK AND A2 DELI/ RESTAURANT AREAS. |
| |
| 2) NOTICE: ART IN PUBLIC PLACES. |
| FOR CONTACT INFORMATION PLEASE CONTACT: |
| MS. SYBILLE WELTER |
| ART IN PUBLIC PLACES COORDINATOR |
| TEL: 822-1515 |
| E-MAIL: [email protected] |
| WEBSITE: WPB.ORG/AIPP/ |
| |
| 3) 3RD REQUEST, TO BE SUBMITTED WHEN CONTRACTOR SUBMITS |
| FOR PERMIT. THIS MAIN BUILDING PERMIT WILL INCLUDE THE |
| FEES FOR THE MECHANICAL, ELECTRICAL, PLUMBING & ROOFING |
| PERMITS. WHEN THE GENERAL CONTRACTOR COMES IN FOR A |
| BUILDING PERMIT WITH THE SIGNED PERMIT APPLICATION FORM |
| BY THE QUALIFIER AND OWNER AND BRINGS IN THE LISTED |
| SUB-PERMITS M-E-P & ROOFING PERMITS SIGNED BY THE |
| QUALIFIER OF EACH COMPANY, THEIR INSURANCES AND |
| LICENSURE UP TO DATE, THE M-E-P AND ROOFING PERMITS ARE |
| FREE OF CHARGE. IF THE M-E-P & ROOFING PERMITS COME IN |
| LATER THERE WILL BE AN $80.00 ADMINISTRATIVE FEE FOR |
| EACH PERMIT. |
| |
| ALL OTHER PERMITS FIRE SPRINKLER, FIRE ALARM, EXHAUST |
| HOODS, ANSUL SYSTEMS OR ALTERNATIVE AUTOMATIC |
| FIRE-EXTINGUISHING SYSTEMS , WALK IN COOLERS & |
| FREEZERS, ALL LOW VOLTAGE PERMITS, GENERATORS & FUEL |
| TANKS, GAS PERMIT, POOL, JACUZZI AND ASSOCIATED |
| SUB-PERMITS, AWNING, CANOPY, FENCE, LANDSCAPE , |
| IRRIGATION, TEST PILE, AUGER CAST PILE AND OR |
| FOUNDATION OR STRUCTURE ONLY PERMIT WILL BE SEPARATE |
| REVIEWS AND ASSOCIATED FEES WITH EACH PERMIT. |
| PLEASE LIST AND SUBTRACT THESE LINE ITEMS AND THEIR |
| VALUE FROM THE OVERALL BUILDING VALUE OF |
| $33,000,000.00. THE REMAINING BALANCE WILL BE |
| AFFECTIVELY THE VALUE OF THE BUILDING YOU WILL BE |
| PAYING FOR THIS PERMIT. THE BUILDING DOES NOT WANT TO |
| COLLECT TWICE FOR THE VALUE OF THESE SUB-PERMITS NOT |
| COVERED UNDER THE PRIME OR MASTER PERMIT. |
| |
| 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH |
| AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1, |
| ADMINISTRATION 108.3 BUILDING PERMIT VALUATION. |
| |
| 4) SEMI-COMPLIED. PLEASE SHOW COMPLIANCE BY THE 2014 |
| FBC-ENERGY CODE. SEE MECHANICAL COMMENTS, THERE ARE |
| NUMEROUS OMISSIONS AND INCONSISTENCIES SEE MECH. |
| COMMENT # 1. |
| |
| 5) THIS BUILDING QUALIFIES AS A THRESHOLD BUILDING. |
| THRESHOLD BUILDING / FL S. S. 553.71(7) ?THRESHOLD |
| BUILDING" MEANING ANY BUILDING WHICH IS GREATER THAN |
| (3) STORIES OR 50 FT. IN HEIGHT, OR WHICH HAS AN |
| ASSEMBLY OCCUPANCY CLASSIFICATION AS DENIED IN THE |
| FLORIDA BUILDING CODE WHICH EXCEEDS 5,000 SQ. FT. IN |
| AREA AND AN OCCUPANT CONTENT OF GREATER THAN 500 |
| PERSONS. |
| |
| 5A) COMPLIED. 109.3.6.1 THRESHOLD INSPECTION PLAN. |
| |
| 5B) SEMI-COMPLIED. SHEET 5 OF 6 THERE IS NO CONTRACTOR |
| SIGNATURE NOR NOTARY WORK COMPLETED. THIS SHEET WE WILL |
| ACCEPT THE BOTTOM SIGNATURE AND SEAL OF THE ENGINEER OF |
| RECORD. |
| THRESHOLD INSPECTOR FORMS: WPB AMENDMENT 109.3.6.2 |
| W.P.B. CONSTRUCTION SERVICES DEPARTMENT. |
| |
| 5C) COMPLIED. ARCHITECTURAL AND STRUCTURAL SHEETS. |
| THRESHOLD BLDG., REQUIRED STATEMENT: W.P.B. AMENDMENT |
| 110.3.7.4.4/ 633 FLORIDA STATUTE. |
| |
| 5D) COMPLIED. THE SPECIAL INSPECTORS ONSITE |
| REPRESENTATIVE MARK PINA . |
| |
| 5E) 3RD REQUEST. THE CONTRACTOR WILL PRODUCE A JOB |
| SUMMARY OR HISTORY FOR THIS TYPE OF CONSTRUCTION. |
| THRESHOLD INSPECTION FORMS , GUIDELINES AND POLICIES |
| FOR PROJECTS WERE E-MAILED TO: |
| [email protected], PLEASE NOTE THIS E-MAIL ADDRESS CAME |
| BACK UNDELIVERABLE. 07/14/2016 11:35 AM. |
| [email protected] |
| |
| 5F) NOTICE ONLY. FOR DIGITAL PLANS, AFTER PERMIT |
| ISSUANCE, PLEASE E-MAIL THE PERMIT LIBRARIAN OF THE |
| PERMIT BEING ISSUED, THE PERMIT LIBRARIAN WILL THEN |
| E-MAIL YOU THE APPROVED AND BATCH STAMPED PLANS SO YOU |
| MAY PRINT YOUR PLANS, TWO SETS OF PLANS WILL NEED TO BE |
| PRINTED IN COLOR, (1) FOR THE THRESHOLD INSPECTOR, THE |
| OTHER FOR THE MEP INSPECTORS OTHER PLANS YOU WISH TO |
| PRINT MAYBE IN BLACK & WHITE.. |
| 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING |
| CODE, CHAPTER 1, ADMINISTRATION, 110.3.7 THRESHOLD |
| BUILDINGS, GUIDELINES AND POLICIES FOR PROJECTS |
| CONCERNING SPECIAL INSPECTORS. |
| |
| 5G) PROVISO: 110.3.7.4.3 ALL SHORING AND RESHORING |
| PROCEDURES, PLANS AND DETAILS SHALL BE SUBMITTED TO THE |
| ENFORCEMENT AGENCY FOR RECORDKEEPING. EACH SHORING AND |
| RESHORING INSTALLATION SHALL BE SUPERVISED, INSPECTED |
| AND CERTIFIED TO BE IN COMPLIANCE WITH THE SHORING |
| DOCUMENTS BY THE CONTRACTOR. |
| 5H) PLEASE CALL THE CITY OF WEST PALM BEACHS AUTOMATED |
| TELEPHONE INSPECTIONS LINE (561) 805-6700) FOR ALL |
| BUILDING INSPECTIONS FOR AUDITING OF JOBSITE |
| INSPECTIONS WITHOUT THIS THE PERMIT EXPIRES IN 6 |
| MONTHS, ABANDONMENT OF JOB, NO INSPECTION ACTIVITY. |
| |
| 5H) INFORMATIONAL NO ACTION REQUIRED. 109.3.6 THRESHOLD |
| BUILDINGS, OPERATING GUIDELINES FOR THRESHOLD |
| INSPECTORS #26. ASSURE THAT THE DESIGNER HAS REQUIRED |
| ON THE PLANS OR SPECIFICATIONS ONE MATERIAL, APPROVED |
| FOR FIRE STOPPING PENETRATIONS, FOR WALLS AND CEILINGS. |
| |
| 6) COMPLIED. UNITY OF TITLE. |
| |
| 7) PROVISO: UNDER A SEPARATE PERMIT. PERIMETER FENCING |
| UNDER A SEPARATE PERMIT. PLEASE PROVIDE COMPLIANCE |
| WITH: 2014 FBC-B 3306.5 BARRIERS. BARRIERS SHALL BE A |
| MINIMUM OF 8 FEET (2438 MM) IN HEIGHT AND SHALL BE |
| PLACED ON THE SIDE OF THE WALKWAY NEAREST THE |
| CONSTRUCTION. BARRIERS SHALL EXTEND THE ENTIRE LENGTH |
| OF THE CONSTRUCTION SITE. |
| |
| 8) PROVISO: UNDER A SEPARATE PERMIT. 2014 FBC0B 3306.2 |
| WALKWAYS. A WALKWAY SHALL BE PROVIDED FOR PEDESTRIAN |
| TRAVEL IN FRONT OF EVERY CONSTRUCTION AND DEMOLITION |
| SITE UNLESS THE APPLICABLE GOVERNING AUTHORITY |
| AUTHORIZES THE SIDEWALK TO BE FENCED OR CLOSED. |
| WALKWAYS SHALL BE OF SUFFICIENT WIDTH TO ACCOMMODATE |
| THE PEDESTRIAN TRAFFIC, BUT IN NO CASE SHALL THEY BE |
| LESS THAN 4 FEET (1219 MM) IN WIDTH. WALKWAYS SHALL BE |
| PROVIDED WITH A DURABLE WALKING SURFACE. WALKWAYS SHALL |
| BE ACCESSIBLE IN ACCORDANCE WITH CHAPTER 11 AND SHALL |
| BE DESIGNED TO SUPPORT ALL IMPOSED LOADS AND IN NO CASE |
| SHALL THE DESIGN LIVE LOAD BE LESS THAN 150 POUNDS PER |
| SQUARE FOOT (PSF). WILL THE WALKWAYS ON THE SOUTH SIDE |
| OF TRINITY PLACE BE CLOSED? |
| |
| 9) PROVISO: UNDER A SEPARATE PERMIT. 2014 FBC-B 3306.7 |
| COVERED WALKWAYS. COVERED WALKWAYS SHALL HAVE A CLEAR |
| HEIGHT OF NOT LESS THAN 8 FEET (2438 MM) AS MEASURED |
| FROM THE FLOOR SURFACE TO THE CANOPY OVERHEAD. ADEQUATE |
| LIGHTING SHALL BE PROVIDED AT ALL TIMES. COVERED |
| WALKWAYS SHALL BE DESIGNED TO SUPPORT ALL IMPOSED |
| LOADS. IN NO CASE SHALL THE DESIGN LIVE LOAD BE LESS |
| THAN 150 PSF FOR THE ENTIRE STRUCTURE. |
| |
| 10) COMPLIED. POLLUTION PREVENTION PLAN. 2014 FBC-B |
| 3307. |
| |
| 11) PROVISO: DEFERRED SUBMITTAL . 2014 FBC-B 3306.9 |
| ADJACENT TO EXCAVATIONS. STRUCTURAL NOTES S1.01. |
| |
| 11A) PROVISO: DEFERRED SUBMITTAL. STRUCTURAL NOTES |
| S1.01 AND SOILS REPORT BY LANGAN ENGINEERING SOILS |
| REPORT MAY 21/ 2015. 2014 FBC-B 3307.1 PROTECTION |
| REQUIRED. ADJOINING PUBLIC AND PRIVATE PROPERTY SHALL |
| BE PROTECTED FROM DAMAGE DURING CONSTRUCTION AND |
| DEMOLITION WORK. PROTECTION SHALL BE PROVIDED FOR |
| FOOTINGS, FOUNDATIONS, PARTY WALLS, CHIMNEYS, SKYLIGHTS |
| AND ROOFS. WITH THE EXCAVATION AND AUGER CAST PILE HOW |
| WILL THE BUILDING TO THE SOUTH BE PROTECTED FROM |
| SETTLEMENT? |
| |
| 11B) COMPLIED. NOTED ON PLAN. 2014 FBC-B 3307.1 THE |
| PERSON MAKING OR CAUSING AN EXCAVATION TO BE MADE SHALL |
| PROVIDE WRITTEN NOTICE TO THE OWNERS OF ADJOINING |
| BUILDINGS ADVISING THEM THAT THE EXCAVATION IS TO BE |
| MADE AND THAT THE ADJOINING BUILDINGS SHOULD BE |
| PROTECTED. SAID NOTIFICATION SHALL BE DELIVERED NOT |
| LESS THAN 10 DAYS PRIOR TO THE SCHEDULED STARTING DATE |
| OF THE EXCAVATION. |
| |
| 12) COMPLIED. NOTED ON PLAN. WHEN EXCAVATING WILL THE |
| EXCESS SOILS BE STORED ON SITE? 2014 FBC-B 3304.1.2 |
| SURCHARGE. NO FILL OR OTHER SURCHARGE LOADS SHALL BE |
| PLACED ADJACENT TO ANY BUILDING OR STRUCTURE UNLESS |
| SUCH BUILDING OR STRUCTURE IS CAPABLE OF WITHSTANDING |
| THE ADDITIONAL LOADS CAUSED BY THE FILL OR SURCHARGE. |
| EXISTING FOOTINGS OR FOUNDATIONS WHICH CAN BE AFFECTED |
| BY ANY EXCAVATION SHALL BE UNDERPINNED ADEQUATELY OR |
| OTHERWISE PROTECTED AGAINST SETTLEMENT AND SHALL BE |
| PROTECTED AGAINST LATER MOVEMENT. |
| |
| 13-19) COMPLIED. |
| |
| 20) SHEET A0.01; |
| 20A-C)COMPLIED. |
| |
| |
| 20D) BUILDING PROVISO: PRODUCT APPROVALS LISTED BELOW |
| CAN BE DEFERRED SUBMITTALS WITH THE APPROVAL OF EITHER |
| THE DESIGNER OF RECORD OR CONTRACTOR ONCE THE WIND |
| DESIGN CRITERIA IS REVIEWED AND APPROVED THEN THE |
| SUBMITTALS CAN BE SUBMITTED AFTER PERMIT ISSUANCE. |
| 107.3.4.2 DEFERRED SUBMITTALS. |
| 2014 FBC-B 1609.1.2 PROTECTION OF OPENINGS, |
| 1609.6.4.4.1 COMPONENTS & CLADDING. FLORIDA DEPARTMENT |
| OF COMMUNITY AFFAIRS RULE 9N-3 NOV. 01/ 2010 (31) |
| SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION SYSTEMS THAT |
| WILL REQUIRE PRODUCT APPROVALS: |
| (31)(A) EXTERIOR DOORS. |
| (B) WINDOWS, MULLIONS |
| (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL |
| LOUVERS, EFIS SYSTEMS, |
| (D) ROOFING PRODUCTS AND ASSEMBLIES, ROOF TOP CURBS, |
| INTAKE AND EXHAUST FANS |
| (E) SHUTTERS |
| (F) SKYLIGHTS |
| (G PRE-ENGINEERED A/C STANDS |
| FBC 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH |
| ARE REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED |
| AND APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR |
| TO SUBMITTAL FOR JURISDICTIONAL APPROVAL. FL |
| 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR |
| SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS, |
| SHOP DRAWINGS ETC.. |
| |
| 20E) BUILDING PROVISO, DEFERRED SUBMITTALS PRODUCT |
| APPROVALS & SHOP DRAWINGS. |
| IDENTIFY GLAZING/ MULLIONS. FOR ALL PRODUCTS WITH |
| GLAZING, PLEASE IDENTIFY THE OPENING WIDTH & HEIGHT, |
| TYPE OF GLAZING, MULLION INFORMATION IF REQUIRED, |
| ATTACHMENTS AND ASSOCIATE PRESSURES FOR EACH OPENING |
| SIZE. 107.2.1 CONSTRUCTION DOCUMENTS SHALL BE OF |
| SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE AND |
| EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT IT |
| WILL CONFORM TO THE PROVISIONS OF THIS CODE AND |
| RELEVANT LAWS, ORDINANCES, RULES AND REGULATIONS, AS |
| DETERMINED BY THE BUILDING OFFICIAL. |
| |
| 20F) COMPLIED. ROOFING PRODUCT APPROVALS: |
| MIAMI-DADE NOA 15-1026.10 SEAMAN CORP FIBER TITE SINGLE |
| PLY ROOF SYSTEMS OVER CONCRETE DECK PAGE 25 OF 51 -240 |
| PSF LIMITATION # 9. |
| FLORIDA APPROVAL 7989-R1 ATLAS ROOFING INSULATION AC |
| FOAM III. |
| |
| |
| 21A) COMPLIED. |
| |
| 21B) SEMI COMPLIED. ON SHEET A2.05 THE PLANS SHOW A |
| TOTAL OF 3 ACCESSIBLE PARKING SPACES. IN THE |
| RECONFIGURATION OF ACCESSIBLE PARKING SPACES THE |
| PARKING SPACE ACCESS AISLE HAS BEEN LEFT OUT. 2014 |
| FBC-ACCESSIBILITY 502.3 (1-3) PARKING SPACE ACCESS |
| AISLE. PLEASE ALSO NOTE ON SHEETS A2.03 AND A2.04 IN |
| ALL NON- PARKING AREAS THE FLOOR IS DIAGONALLY STRIPED. |
| |
| 22-24A) COMPLIED |
| |
| 24B) COMPLIED. SHEET A1.12 LIFE SAFETY 3 STAIRS ARE A |
| MINIMUM OF 57 INCHES/ 0.3= 190 OCC. X 3= 570 OCCUPANTS. |
| |
| 24C) COMPLIED. CONFERENCE ROOMS 2 MEANS OF EGRESS. |
| |
| 24D) 3RD REQUEST FOR CODE COMPLIANCE FOR A 2 STORY |
| ATRIUM. THE RESPONSE INDICATES THIS IS NOT A 2 STORY |
| ATRIUM BECAUSE IT DOES NOT COMMUNICATE WITH ANY OTHER |
| FLOOR. SHEET A1.12 THE 2ND STORY HAS A NOTE STATING |
| SMOKE SEPARATION FULL HEIGHT GLAZING WITH TYCO WS |
| SPRINKLERS. THIS IS THE EXCEPTION 1 FOR 404.6 |
| ENCLOSURES OF ATRIUMS. WILL NEED TO MEET THE EXCEPTION |
| 1.1 AND 1.2 GLAZING IN A GASKETED FRAME. |
| FBC-B 404.6 ATRIUMS SPACES SHALL BE SEPARATED FROM |
| ADJACENT SPACES BY A 1 HOUR FIRE BARRIER. |
| |
| IF YOU DO NOT HAVE A FIRE BARRIER BETWEEN THE 1ST FLOOR |
| AND SECOND FLOOR THEY WILL COMMUNICATE, THUS BEING A 2 |
| STORY ATRIUM. THE FIRE BARRIER BETWEEN THE 1ST FLOOR |
| FIRE AREA AND 2ND FLOOR FIRE AREA IS A COMMON WALL A |
| PORTION OF THE WALL IS GLAZED. COMPLIANCE WITH FBC-B |
| 707.3.10 AND TABLE 707.3.10 SHALL BE ACHIEVED . PLEASE |
| ALSO REVIEW 707.6 OPENINGS IN FIRE BARRIERS AND THEIR |
| EXCEPTIONS, PLEASE PROVIDE WHICH METHOD OF CODE |
| COMPLIANCE WILL BE ACHIEVED. |
| |
| 24E) COMPLIED. |
| |
| 25A-D) COMPLIED. |
| |
| 25E) SEMI-COMPLIED. SHEET A6.12 THE NOTE FOR BI-PARTING |
| DOORS IS ONLY ON THE ONE FLOOR, PLEASE PLACE NOTE FOR |
| ALL LEVELS SHOWING THIS IS A CLOSED SHAFT WITH OPENING |
| PROTECTIVES IN COMPLIANCE WITH FBC-B 716.5 AND ALSO FOR |
| FALL PROTECTION IN COMPLIANCE WITH FBC-B 1013.2 GUARDS. |
| |
| 25F) COMPLIED. |
| |
| 25G) SEMI-COMPLIED. SEE COMMENT 21B. SHEET A2.05 LIFE |
| SAFETY PLAN INDICATES 2 ACCESSIBLE PARKING STALLS WITH |
| COLUMNS IN THE ACCESS AISLE. PLEASE PROVIDE THE CLEAR |
| WIDTH FROM THE COLUMN TO THE ACCESSIBLE PARKING STALL. |
| FBC-ACCESSIBILITY CODE 502.3.1 WIDTH. ACCESS AISLES |
| SERVING CAR AND VAN PARKING SPACES SHALL BE 60 INCHES |
| (1525 MM) WIDE MINIMUM. |
| |
| |
| |
| 26) SHEET A1.16 6TH FLOOR LIFE SAFETY PLAN & A7.05 & |
| A7.06 ENLARGED FLOOR PLAN 6TH FLOOR. |
| 26A-E) COMPLIED. |
| |
| |
| 26F) BUILDING PROVISO/ DEFERRED SUBMITTAL: OPEN AIR |
| TERRACE WATERPROOFING MATERIAL AND DETAILS. SHEET 5.11. |
| ADMINISTRATION 107.3.4 DESIGN PROFESSIONAL IN |
| RESPONSIBLE CHARGE. THE REGISTERED DESIGN |
| PROFESSIONAL IN RESPONSIBLE CHARGE SHALL BE RESPONSIBLE |
| FOR REVIEWING AND COORDINATING SUBMITTAL DOCUMENTS |
| PREPARED BY OTHERS, INCLUDING PHASED AND DEFERRED |
| SUBMITTAL ITEMS, FOR COMPATIBILITY WITH THE DESIGN OF |
| THE BUILDING. PRODUCTS SHALL BE REVIEWED AND APPROVED |
| IN WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| FOR JURISDICTIONAL APPROVAL. |
| |
| 26G) BUILDING PROVISO/ DEFERRED SUBMITTALS: OPEN AIR |
| TERRACE VIVA BLADE GUARD RAIL SYSTEM. SHEET 5.11. |
| ADMINISTRATION 107.3.4 DESIGN PROFESSIONAL IN |
| RESPONSIBLE CHARGE. THE REGISTERED DESIGN |
| PROFESSIONAL IN RESPONSIBLE CHARGE SHALL BE RESPONSIBLE |
| FOR REVIEWING AND COORDINATING SUBMITTAL DOCUMENTS |
| PREPARED BY OTHERS, INCLUDING PHASED AND DEFERRED |
| SUBMITTAL ITEMS, FOR COMPATIBILITY WITH THE DESIGN OF |
| THE BUILDING. PRODUCTS SHALL BE REVIEWED AND APPROVED |
| IN WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| FOR JURISDICTIONAL APPROVAL. |
| |
| 26H) **IN REVIEW BY THE BUILDING OFFICIAL / ALTERNATE |
| MATERIALS & METHODS OF CONSTRUCTION 107.11** |
| COMMON COMMENT FOR ALL FLOORS (6-12) WHERE THE |
| ALLOWABLE COMMON PATH OF TRAVEL IS EXCEEDED. EXAMPLE: |
| ROOMS 604 & 605 FROM THE MOST REMOTE POINT IN THE SUITE |
| TO THE NEAREST VERTICAL EXIT IS OVER THE ALLOWABLE 75 |
| FT. TO ACHIEVE THE ALLOWABLE 75 FT. A RATED WALL IS |
| INSTALLED IN THE EXIT ACCESS CORRIDOR, ON THE DOOR |
| SCHEDULE THIS DOOR IS NOT FIRE RATED. PLEASE PROVIDE A |
| CODE SECTION WHERE THIS IS ALLOWED TO BE CONSIDERED |
| CODE COMPLIANT. 2014 FBC-B TABLE 1014.3. DEFINITION: |
| COMMON PATH OF EGRESS TRAVEL. THAT PORTION OF EXIT |
| ACCESS WHICH THE OCCUPANTS ARE REQUIRED TO TRAVERSE |
| BEFORE TWO SEPARATE AND DISTINCT PATHS OF EGRESS TRAVEL |
| TO TWO EXITS ARE AVAILABLE. PATHS THAT MERGE ARE COMMON |
| PATHS OF TRAVEL. COMMON PATHS OF EGRESS TRAVEL SHALL BE |
| INCLUDED WITHIN THE PERMITTED TRAVEL DISTANCE. |
| |
| 27) **IN REVIEW BY THE BUILDING OFFICIAL / ALTERNATE |
| MATERIALS & METHODS OF CONSTRUCTION 107.11** |
| SHEET A1.18 & A7.09 & A7.10. THE 8TH, 10TH & 12TH |
| FLOORS. THIS COMMENT FOR THE ROOMS 818,819,1018, |
| 1019,1218 & 1219 ALL EXCEED THE ALLOWABLE 75 FT. |
| ALLOWABLE COMMON PATH OF TRAVEL OF 75 FT. 2014 FBC-B |
| TABLE 1014.3 |
| |
| 28) COMPLIED. |
| |
| 29) SHEET A2.09 & A7.41 13TH FLOOR ROOFTOP GARDEN: |
| |
| 29A-E) COMPLIED. |
| |
| 29F) 3RD REQUEST. SHEET A6.14 SHOWS THE ROOF HATCH TO |
| BE 2.5 FT X 3 FT. = 7.5 FEET NOT 16 FEET. SEE COMMENTS |
| BELOW. STAIRWELL # 1 SHOWS A LADDER TO GAIN ACCESS TO |
| THE ROOF TOP EQUIPMENT. PLEASE REVIEW : |
| 2014 FBC-B 1009.16.1 EXCEPTION. IN BUILDINGS WITHOUT AN |
| OCCUPIED ROOF, ACCESS TO THE ROOF SHALL BE PERMITTED TO |
| BE A ROOF HATCH OR TRAP DOOR NOT LESS THAN 16 SQUARE |
| FEET IN AREA AND HAVING A MINIMUM DIMENSION OF 2 FEET . |
| |
| 30) BUILDING PROVISO: POOL AND JACUZZI ARE NOT PART OF |
| THIS PERMIT, WILL REQUIRE A SEPARATE PERMIT, REVIEW AND |
| ASSOCIATED FEES. |
| |
| 31) BUILDING PROVISO: FENCING AND GATES AROUND THE POOL |
| WILL REQUIRE A SEPARATE PERMIT, REVIEW AND ASSOCIATED |
| FEES. |
| |
| |
| |
| |
| |
| 32-34) COMPLIED. |
| |
| 35) BUILDING PROVISO: DEFERRED SUBMITTAL. SHEETS A6.02 |
| & A6.03 STAIR GUARDRAIL/ HANDRAILS . ADMINISTRATION |
| 107.3.4 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. THE |
| REGISTERED DESIGN |
| PROFESSIONAL IN RESPONSIBLE CHARGE SHALL BE RESPONSIBLE |
| FOR REVIEWING AND COORDINATING SUBMITTAL DOCUMENTS |
| PREPARED BY OTHERS, INCLUDING PHASED AND DEFERRED |
| SUBMITTAL ITEMS, FOR COMPATIBILITY WITH THE DESIGN OF |
| THE BUILDING. |
| FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL |
| FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE |
| ENGINEER OF RECORD FOR REVIEW. |
| |
| 36A-B) COMPLIED. |
| |
| 36C) BUILDING PROVISO/ DEFERRED SUBMITTAL. ON THE TOP |
| OF THE 8 FT. CONCRETE CANOPY WHAT PRODUCT WILL BE USED |
| TO KEEP MOISTURE FROM SEEPING INTO THE CONCRETE SLAB |
| AND REINFORCEMENT? |
| |
| 37) BUILDING PROVISO/ DEFERRED SUBMITTAL. SHEET A4.01 |
| THE NORTH WALL ELEVATION ON THE GARAGE LEVELS 3-5 THE |
| PLANS SHOW PERFORATED ALUMINUM PANEL SYSTEM. PLEASE |
| PROVIDE PRODUCT LITERATURE, AND ENGINEERING ANALYSIS OF |
| THE SYSTEM, WITH THE WIND DESIGN CRITERIA AND ANCHORING |
| SYSTEMS REVIEWED BY THE ENGINEER OF RECORD. FL |
| 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL FORWARD |
| THE DELEGATED ENGINEERING DOCUMENTS TO THE ENGINEER OF |
| RECORD FOR REVIEW. 2014 FBC-B 1503.1 ROOF DECKS SHALL |
| BE COVERED WITH APPROVED ROOF COVERINGS SECURED TO THE |
| BUILDING OR STRUCTURE IN ACCORDANCE WITH THE PROVISIONS |
| OF THIS CHAPTER. ROOF COVERINGS SHALL BE DESIGNED AND |
| INSTALLED IN ACCORDANCE WITH THIS CODE AND THE APPROVED |
| MANUFACTURER?S INSTRUCTIONS SUCH THAT THE ROOF COVERING |
| SHALL SERVE TO PROTECT THE BUILDING OR STRUCTURE. |
| |
| 38) COMPLIED. FIRE COMMAND CENTER LAYOUT. FBC-B |
| 911.1.4. |
| |
| |
| |
| 38A) PLEASE SHOW COMPLIANCE WITH FBC-B 911.1.4. LAYOUT |
| APPROVAL. A LAYOUT OF THE FIRE COMMAND CENTER AND ALL |
| FEATURES REQUIRED BY THIS SECTION TO BE CONTAINED |
| THEREIN SHALL BE SUBMITTED FOR APPROVAL PRIOR TO |
| INSTALLATION. |
| |
| 38B) 911.1.5 REQUIRED FEATURES. |
| THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 72 AND |
| SHALL CONTAIN THE FOLLOWING FEATURES: |
| |
| 1-5) SHEET E4.02 |
| |
| 6. COMPLIED 909.16 FOR SMOKE CONTROL SYSTEMS INSTALLED |
| IN THE BUILDING. |
| |
| 7-12) E4.02. |
| |
| BUILDING PROVISO/ DEFERRED SUBMITTAL: |
| 13. AN APPROVED BUILDING INFORMATION CARD THAT |
| CONTAINS, BUT IS NOT LIMITED TO, THE FOLLOWING |
| INFORMATION, 13.1-13.7: |
| |
| 13.1. GENERAL BUILDING INFORMATION THAT INCLUDES: |
| PROPERTY NAME, ADDRESS, THE NUMBER OF FLOORS IN THE |
| BUILDING (ABOVE AND BELOW GRADE), USE AND OCCUPANCY |
| CLASSIFICATION (FOR MIXED USES, IDENTIFY THE DIFFERENT |
| TYPES OF OCCUPANCIES ON EACH FLOOR), ESTIMATED BUILDING |
| POPULATION (I.E., DAY, NIGHT, WEEKEND); |
| |
| 13.2. BUILDING EMERGENCY CONTACT INFORMATION THAT |
| INCLUDES: A LIST OF THE BUILDING?S EMERGENCY CONTACTS |
| (E.G., BUILDING MANAGER, BUILDING ENGINEER, ETC.) AND |
| THEIR RESPECTIVE WORK PHONE NUMBER, CELL PHONE NUMBER, |
| EMAIL ADDRESS; |
| |
| 13.3. BUILDING CONSTRUCTION INFORMATION THAT INCLUDES: |
| THE TYPE OF BUILDING CONSTRUCTION (E.G., FLOORS, WALLS, |
| COLUMNS, AND ROOF ASSEMBLY); |
| |
| 13.4. EXIT STAIR INFORMATION THAT INCLUDES: NUMBER OF |
| EXIT STAIRS IN BUILDING, EACH EXIT STAIR DESIGNATION |
| AND FLOORS SERVED, LOCATION WHERE EACH EXIT STAIR |
| DISCHARGES, EXIT STAIRS THAT ARE PRESSURIZED, EXIT |
| STAIRS PROVIDED WITH EMERGENCY LIGHTING, EACH EXIT |
| STAIR THAT ALLOWS REENTRY, EXIT STAIRS PROVIDING ROOF |
| ACCESS; ELEVATOR INFORMATION THAT INCLUDES: NUMBER OF |
| ELEVATOR BANKS, ELEVATOR BANK DESIGNATION, ELEVATOR CAR |
| NUMBERS AND RESPECTIVE FLOORS THAT THEY SERVE, LOCATION |
| OF ELEVATOR MACHINE ROOMS, LOCATION OF SKY LOBBY, |
| LOCATION OF FREIGHT ELEVATOR BANKS; |
| |
| 13.5. BUILDING SERVICES AND SYSTEM INFORMATION THAT |
| INCLUDES: LOCATION OF MECHANICAL ROOMS, LOCATION OF |
| BUILDING MANAGEMENT SYSTEM, LOCATION AND CAPACITY OF |
| ALL FUEL OIL TANKS, LOCATION OF EMERGENCY GENERATOR, |
| LOCATION OF NATURAL GAS SERVICE; |
| |
| 13.6. FIRE PROTECTION SYSTEM INFORMATION THAT INCLUDES: |
| LOCATIONS OF STANDPIPES, LOCATION OF FIRE PUMP ROOM, |
| LOCATION OF FIRE DEPARTMENT CONNECTIONS, FLOORS |
| PROTECTED BY AUTOMATIC SPRINKLERS, LOCATION OF |
| DIFFERENT TYPES OF SPRINKLER SYSTEMS INSTALLED (E.G., |
| DRY, WET, PRE-ACTION, ETC.); AND |
| |
| 13.7 HAZARDOUS MATERIAL INFORMATION THAT INCLUDES: |
| LOCATION OF HAZARDOUS MATERIAL, QUANTITY OF HAZARDOUS |
| MATERIAL. |
| |
| 14. COMPLIED. WORK TABLE. |
| |
| 15.COMPLIED. E4.02. GENERATOR SUPERVISION DEVICES, |
| MANUAL START AND TRANSFER FEATURES. E4.02 |
| |
| 16. COMPLIED. E4.02. PUBLIC ADDRESS SYSTEM, WHERE |
| SPECIFICALLY REQUIRED BY OTHER SECTIONS OF THIS CODE. |
| |
| 17 COMPLIED. E4.02. . ELEVATOR FIRE RECALL SWITCH IN |
| ACCORDANCE WITH ASME A17.1. |
| |
| 18. COMPLIED. E4.02. ELEVATOR EMERGENCY OR STANDBY |
| POWER SELECTOR SWITCH(ES), WHERE EMERGENCY OR STANDBY |
| POWER IS PROVIDED. |
| |
| 39) COMPLIED. 2014 FBC-B 403.5.3 STAIRWAY DOOR |
| OPERATION. |
| |
| 40) COMPLIED. 909.4 ANALYSIS, SMOKE CONTROL. |
| |
| 41) COMPLIED. FBC-B 403.5.5 LUMINOUS EGRESS PATH |
| MARKINGS. |
| |
| 42) NEW COMMENT, COMMENT #9 UNDER THIS MECHANICAL |
| REVIEW. THE SHEET M2.02 IN STAIRWELL # 2 NOTE # 7 |
| INDICATES DUCT IN THE STAIRWELL TO HAVE A 2 HOUR FIRE |
| RATING. TO USE FLAMEBAR. SHEET A6.01A DETAIL 01 DOES |
| NOT SHOW A DUCT GOING THROUGH THE STAIRWELL. SHEET |
| A6.03 DETAILS 03 & 04 ARE CUT SECTIONS THROUGH THE |
| STAIRWELL 2 BUT AGAIN NO DUCTS ARE SHOWN PENETRATING |
| THE STAIRWELL ENCLOSURE. |
| 2014 FBC-B 1022.5 PENETRATIONS. PENETRATIONS INTO AND |
| OPENINGS THROUGH INTERIOR EXIT STAIRWAYS AND RAMPS ARE |
| PROHIBITED EXCEPT FOR REQUIRED EXIT DOORS, EQUIPMENT |
| AND DUCTWORK NECESSARY FOR INDEPENDENT VENTILATION OR |
| PRESSURIZATION, SPRINKLER PIPING, STANDPIPES, |
| ELECTRICAL RACEWAY FOR FIRE DEPARTMENT COMMUNICATION |
| SYSTEMS AND ELECTRICAL RACEWAY SERVING THE INTERIOR |
| EXIT STAIRWAY AND RAMP AND TERMINATING AT A STEEL BOX |
| NOT EXCEEDING 16 SQUARE INCHES (0.010 M2). SUCH |
| PENETRATIONS SHALL BE PROTECTED IN ACCORDANCE WITH |
| SECTION 714. THERE SHALL BE NO PENETRATIONS OR |
| COMMUNICATING OPENINGS, WHETHER PROTECTED OR NOT, |
| BETWEEN ADJACENT INTERIOR EXIT STAIRWAYS AND RAMPS. |
| |
| 43) NEW COMMENT, COMMENT #12 UNDER THIS MECHANICAL |
| REVIEW. THE SHAFT ENCLOSING THE OAR-1 DUCT SHALL BE |
| CONTINUOUS THROUGH THE ELEVATOR LOBBY AND GARAGE PER |
| FBC ?B 707.5, 711.4 & 713.5. |
| |
| 44) BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT |
| FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL |
| PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND |
| A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT |
| APPLICATION. PLEASE CALL (561)233-5025 FOR MORE |
| INFORMATION. |
| |
| 45) WHEN RESUBMITTING PLANS PLEASE INDICATE THE |
| REVISION & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES |
| AS NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| JAMES A. WITMER CBO |
| SENIOR COMMERCIAL COMBINATION PLANS EXAMINER |
| CONSTRUCTION SERVICES DIVISION |
| DEVELOPMENT SERVICES DEPARTMENT |
| TEL: 561-805-6715 |
| FAX: 561-805-6676 |
| E-MAIL: [email protected] |
| |