2016-12-12 12:31:082ND REVIEW FBC-2014 MECHANICAL
 PERMIT #16061443
 12/12/16
  
 1) PLEASE COMPARE THE SYSTEM COMPLIANCE DATA LISTED IN
 THE ENERGYGAUGE SUBMITTAL TO THE SYSTEM EQUIPMENT
 SCHEDULES ON M6.01. THERE ARE NUMEROUS INCONSISTENCIES
 AND OMISSIONS, SOME OF WHICH ARE LISTED BELOW. PLEASE
 PROOFREAD THE DOCUMENTS BEFORE RESUBMITTING.
 A) AHU/CU-13, CU-13FL-R19, CU-R9 ARE NOT LISTED IN THE
 SUBMITTAL.
 B) CU-R2A & B, CU-R3-B, CU-R9A&B, CU-R11A&B, CU-R13A&B
 ARE LISTED IN THE SUBMITTAL BUT NOT IN THE SCHEDULE.
 C) THE COMPLIANCE DATA LISTED IN THE SUBMITTAL FOR
 CU-R8B & CU-R14A&B DOESN'T MATCH THE SCHEDULE.
 D) THE EFFICIENCY RATINGS FOR THE VRF SHOWN IN THE
 SUBMITTAL DO NOT MATCH THE RATINGS SHOWN IN THE
 SCHEDULE.- SEE TABLE C403.2.3(11) FBC-14 ENERGY
 CONSERVATION.
  
 2) THE RESPONSE NARRATIVE INDICATES THAT THE REQUESTED
 COMMISSIONING PLAN IS TO BE A DEFERRED SUBMITTAL.
 PLEASE ADDRESS THE FOLLOWING SECTIONS FROM THE WPB
 AMENDMENTS TO THE FBC.
  
 A) DEFERRED SUBMITTAL: 107.3.4.2 DEFERRED SUBMITTALS.
 FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS
 ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE
 NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT
 ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A
 SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL
 HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION
 DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
 B) DEFERRED SUBMITTAL. 2010 FBC 107.3.4.1 PRODUCT
 APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED BY THE
 DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN
 WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL
 FOR JURISDICTIONAL APPROVAL.
  
 3) SMOKE CONTROL/ RATIONAL ANALYSIS REPORT: A) PLEASE
 CLARIFY IF SEF-1 AT 2000 CFMS HAS BEEN SIZED TO EXHAUST
 ONLY ONE FLOOR OF INCIDENCE, OR HAS THE CAPACITY TO
 EXHAUST MULTIPLE FLOORS. B) VERIFY THE OARTU, WHICH HAS
 BEEN DESIGNATED AS PART OF THE SMOKE CONTROL SYSTEM, IS
 MEETING ALL APPLICABLE REQUIREMENTS LISTED ON PAGE 21
 OF THE REPORT AND SECTIONS 513.10 AND 513.10.5 FBC-14
 MECHANICAL. C) PLEASE NOTE THAT PRODUCT SUBMITTALS FOR
 ALL EQUIPMENT AND COMPONENTS OF THE SMOKE CONTROL
 SYSTEMS SHALL BE REVIEWED AND APPROVED WITH SIGNATURE
 BY THE EOR AND SUBMITTED TO THE BUILDING DEPARTMENT FOR
 REVIEW- SEE SECTION 513.10.
  
 4) 2ND REQUEST FOR COMPLETE COOLING AND HEATING
 CALCULATIONS. CALCULATIONS ARE STILL MISSING FOR
 AHU/CU'S 1-13 A, AND THE OARTU. CALCULATIONS HAVE BEEN
 SUBMITTED FOR FC-6-1 & 6-2 HOWEVER THESE SYSTEMS ARE
 NOT SHOWN IN THE SCHEDULES. B) CALCULATIONS HAVE BEEN
 SUBMITTED FOR SUITES 1-22 HOWEVER THOSE NUMBERS DO NOT
 MATCH THE ROOM IDENTIFICATIONS ON THE PLANS SO SIZING
 CANNOT BE VERIFIED.
  
 5) IN REFERENCE TO COMMENT #1G & 1H FROM THE 1ST REVIEW
 SEE SECTION 107.3.4.2 DEFERRED SUBMITTALS PRINTED UNDER
 COMMENT #2 OF THIS REVIEW. PLEASE NOTE THAT HOLDS ON
 INSPECTIONS MAY BE PLACED INTO THE SYSTEM UNTIL
 SUBMITTALS HAVE BEEN RECEIVED.
  
 6) REFER TO COMMENT #2 FROM THE 1ST REVIEW- SHEET
 M6.01: THE SUITE NUMBERS IN THE VENTILATION CALCULATION
 SCHEDULE DO NOT MATCH THE ROOM IDENTIFICATIONS ON THE
 PLANS.
  
 7) M2.01: KITCHEN GAS APPLIANCE CALCULATIONS: IN
 ACCORDANCE WITH SECTION 304.9.3 FBC-14 FUEL GAS, THE
 MAKEUP AIR FOR THE EXHAUST FOR THE HOOD CANNOT BE USED
 TO SUPPLY COMBUSTION AIR TO THE APPLIANCES.
  
 8) M2.01: THE KITCHEN EXHAUST SYSTEMS ARE ACKNOWLEDGED
 TO BE UNDER SEPARATE PERMIT. ADVISORIES: A) AS
 PREVIOUSLY NOTED THE GREASE DUCT EXHAUST TERMINATIONS
 ON THE NORTH SIDE OF THE BUILDING APPEAR TO BE IN A
 LOCATION WHERE THEY MAY NOT BE IN COMPLIANCE WITH
 SECTION 506.3.13.2. PLEASE PROVIDE CLEARANCE DISTANCE
 MEASUREMENTS TO THE PUBLIC SIDEWALK MEASURED
 HORIZONTALLY, TO GRADE, AND TO ALL INTAKES IN THE
 GENERAL VICINITY INCLUDING THE GENERATOR AND GARAGE AIR
 INTAKE. SEE SECTION 401.4. B) THE GREASE DUCT FOR KEF-2
 APPEARS TO BE PENETRATING INTERIOR WALLS WHICH IS NOT
 PERMITTED UNLESS THE DUCT IS ENCLOSED FROM THE POINT OF
 PENETRATION TO THE OUTLET TERMINAL- SECTION 506.3.11.
 C) PROVIDE A SUBMITTAL FOR THE GREASE RESERVOIR THE
 KEF-2 GREASE DUCT AND PROVIDE A DETAIL ON THE PLAN
 INDICATING COMPLIANCE WITH SECTION 506.3.7.1 ITEMS 1-7.
 PLEASE NOTE ITEM #5 REQUIRES THE UNIT TO BE SLOPED TO A
 POINT FOR DRAINAGE. INDICATE HOW THE GREASE WILL BE
 DRAINED AND PROVIDE THE DISCHARGE LOCATION.
 D) PLEASE NOTE THAT COMPLIANCE WITH SECTION 508.1.1
 MAKEUP AIR TEMPERATURE WILL BE REQUIRED. COMPLIANCE
 WITH THIS SECTION MAY IMPACT THE MAIN MECHANICAL PLANS.
  
 9) M2.01: THE PRINT IN THE HEX SYMBOL LOCATED IN
 WOMEN'S RESTROOM 122 IS NOT LEGIBLE.
  
 10) M2.01: PLEASE PROVIDE THE FLEX DUCT SIZES OR PLACE
 THE FLEX TABLE ON M6.01 ON THIS PLAN SHEET AND ALL
 OTHERS WHERE DUCT SIZES ARE NOT SHOWN.
  
 11) M2.01: PLEASE PROVIDE CLEAR ACCESS PANEL SYMBOLS ON
 THE PLANS FOR THE FC'S AND CHANGEOVER BOXES AND ADD A
 KEYNOTE.
  
 12) M2.01: THE TRANSFER DUCT BETWEEN CORRIDOR 129 AND
 133 IS NOT PERMITTED PER SECTION 601.2.
  
 13) M2.02: THE USE OF DRYER BOOSTER FANS TO EXTEND THE
 LENGTHS OF DRYER DUCTS WAS REMOVED FROM THE CURRENT
 FBC-14 MECHANICAL CODE. DRYER DUCT LENGTHS SHALL BE
 DETERMINED BY THE DRYER MANUFACTURER'S INSTRUCTIONS-
 SECTION 504.6.4.2.
  
 14) M2.02: IDENTIFY WHICH PIECE OF EQUIPMENT IN THE
 LAUNDRY ROOM IS BEING EXHAUSTED USING THE 20" ROUND
 DUCT.
  
 15) M2.02: THE DRYER EXHAUST DUCTS FROM THE LAUNDRY
 ROOMS MUST BE IN FIRE RATED SHAFT ENCLOSURES PER
 SECTION 504.4. THE PLANS ARE INDICATING THE DUCTS
 THEMSELVES WILL BE 2HR. RATED. PLEASE PROVIDE
 MANUFACTURER'S SPECIFICATIONS AND INSTALLATION
 INSTRUCTIONS FOR THE DUCTS WITH SHOP DRAWING STAMP AND
 APPROVAL SIGNATURE BY THE EOR. THE DOCUMENTS SHALL
 INDICATE THE DUCTS ARE COMPATIBLE WITH THE APPLIANCE
 MANUFACTURER'S SPECIFICATIONS, AND HAVE INSTRUCTIONS
 FOR INSTALLING THE LINT TRAPS AS SPECIFIED ON THE
 PLANS.
  
 16) M2.02: PROVIDE EXHAUST VENTILATION CALCULATIONS FOR
 THE LOCKER ROOMS PER TABLE 403.3.
  
 17) M2.02: HOW IS AIR BEING RETURNED FOR THE SOILED
 LINEN ROOM. PLEASE NOTE THAT TABLE 6-4 ASHRAE 62.1-2010
 REQUIRES EXHAUST VENTILATION FOR SOILED LAUNDRY ROOMS.
  
 18) M2.02: PLEASE EMBOLDEN THE FC ACCESS PANEL
 LOCATIONS AND ADD A KEYNOTE TO THE PLAN TO IDENTIFY
 THEIR LOCATIONS.
  
 19) M2.03: PROVIDE COMPLIANCE DATA FROM THE CONDENSER
 MANUFACTURER'S INDICATING THE UNITS CAN BE INSTALLED
 INDOORS. PLEASE NOTE EXHAUST VENTILATION MAY BE
 REQUIRED.
  
 20) M2.03, M2.04, M2.05: THE CIRCULATOR FANS SHALL BE
 INSTALLED A MINIMUM OF 8FT. ABOVE THE GARAGE FLOOR-
 SECTION 304.6.
  
 21) M2.05: SHOW THE REQUIRED FSD AT THE 18X20 DUCT
 PENETRATING THE OAR-1 SHAFT. PLEASE NOTE THAT
 MANUFACTURER'S SPECIFICATIONS HAVE NOT BEEN SUBMITTED
 FOR THE FLAMEBAR DUCT TO VERIFY COMPLIANCE FOR
 INSTALLATION OF THE FSD IN THE DUCT, AND THE DESIGN
 DOES NOT CORRELATE WITH THE RATIONAL ANALYSIS.
  
 22) M2.05 & M4.01: O/A DUCTWORK SHOWN ON THE PLAN DOES
 NOT MATCH THE RISER DRAWING.
  
 23) M2.06, M2.07, & M2.08: FIRE/SMOKE DAMPERS REQUIRED
 FOR THE O/A DUCTS PENETRATING THE FIRE-RATED SHAFT. A)
 THE 28X5 AND THE 30X5 DUCTS AT THE OAR-1 ARE NOT SHOWN
 ON THE RISER DRAWING ON M.401
  
 24) M2.09: SHOW THE LOCATION OF KEF-1 AND THE EXHAUST
 TERMINATION ON THE PLAN. A) CLARIFY HOW MAKEUP AIR IS
 BEING PROVIDED FOR THE KITCHEN EXHAUST AND PROVIDE AN
 AIR BALANCE CALCULATION. B) PLACE A NOTE INDICATING
 SEPARATE PERMITS ARE REQUIRED FOR THE KITCHEN EXHAUST
 AND FIRE SUPPRESSION SYSTEMS. ADVISORY: PLEASE NOTE
 THAT COMPLIANCE WITH SECTION 508.1.1 MAKEUP AIR
 TEMPERATURE WILL BE REQUIRED. COMPLIANCE WITH THIS
 SECTION MAY IMPACT THE MAIN MECHANICAL PLANS. C) THE
 RESPONSE NARRATIVE TO THE 1ST REVIEW COMMENTS INDICATES
 THAT A ENLARGED KITCHEN DRAWING IS SHOWN ON M3.01,
 HOWEVER THE DRAWING IS NOT ON THE PLAN SHEET.
  
 25) M3.01: PROVIDE THE FLEX DUCT SIZES AND PLACE A
 KEYED NOTE TO IDENTIFY THE ACCESS PANEL LOCATIONS FOR
 THE FC UNITS AND CHANGEOVER BOXES.
  
 26) M4.01: THE DIRECTIONAL ARROWS AT THE TOP OF THE
 TOILET RISERS ARE POINTING IN THE WRONG DIRECTION. A)
 PLEASE INDICATE THE SIZE OF THE MAIN HORIZONTAL DUCT AT
 THE TOP OF THE RISER
  
 27) IN REFERENCE TO COMMENT #37 FROM THE 1ST REVIEW,
 THE DESIGN PROFESSIONAL WILL PROVIDE WIND LOAD DESIGN
 AND STRUCTURAL DETAILS AS DEFERRED SUBMITTALS FOR ALL
 ROOFTOP MECHANICAL EQUIPMENT AND COMPONENT
 INSTALLATIONS. PLEASE SEE SECTION 107.3.4.2 WPB
 AMENDMENTS FOR REQUIREMENTS.
  
 28) ADVISORY: TO HELP EXPEDITE THE PLAN AND FIELD
 INSPECTION APPROVALS, IT IS RECOMMENDED THAT THE DESIGN
 PROFESSIONAL PROVIDE A MASTER LIST OF ALL MECHANICAL
 EQUIPMENT AND COMPONENTS THAT WILL BE DEFERRED
 SUBMITTALS INCLUDING BUT NOT LIMITED TO ROOF STANDS,
 ROOF CURBS, LOUVERS, FIRE AND FIRE/SMOKE DAMPERS, DUCT
 SMOKE DETECTORS, O/A DAMPERS, CO SENSORS, THE FLAMEBAR
 DUCTS, THE BOILER, AND ALL FANS AND DUCTS ASSOCIATED
 WITH THE SMOKE CONTROL SYSTEM AS NOTED IN COMMENT #3.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved