Date |
Text |
2016-12-27 11:56:19 | GAS REVIEW |
| 1) SHOW THE DEVELOPED LENGTH OF THE PIPING FROM THE |
| SECOND STAGE REGULATOR TO THE FURTHEST OUTLET. THIS |
| DISTANCE IS USED FOR THE SIZING OF THE LOW PRESSURE |
| SYSTEM.2ND REQUEST. |
| 2) SHT. P4.10 - THE BTU LOAD FOR THE TWO DOMESTIC |
| BOILERS ADDS TO 1,500 MBTU BUT THE PLANS SHOW 1,700 |
| MBTU. CLARIFY. 2ND REQUEST. |
| 3) SHT. P4.10 - KEYNOTE #10 SHOWS TWO BOILERS AT 199 |
| MBTU EACH WHICH IS 398 MBTU BUT THE RISER SHOWS 798 |
| MBTU. CLARIFY.2ND REQUEST. |
| 4) MY CALCULATION OF BTU'S AT ONE SECTION OF THE GAS |
| RISER IS 1,898 MBTU BUT THE PLAN SHOWS 2,498 MBTU. |
| THERE IS ANOTHER SECTION WITH A BTU LOAD OF 3,698 MBTU |
| AND MY CALCULATIONS ADD TO 3,098 MBTU. CLARIFY.2ND |
| REQUEST. |
| 5) THE TOTAL BTU LOAD ON THE SYSTEM SHOULD BE 4,413 |
| MBTU. PLEASE CHECK THE CALCULATIONS.2ND REQUEST. |
| 6) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR THE |
| GAS REGULATORS. FGC SEC. 410.1, 410.2.2ND REQUEST.THE |
| NARRATIVE REFERS TO NOTE #13 ON SHT. P4.10 - NOTE #13 |
| REFERS TO THE VENTLESS PRESSURE REGULATOR. |
| 7) SUBMIT MANUF. SPECIFICATION SHEETS FOR THE ALL GAS |
| EQUIPMENT AND APPLIANCES. APPLIANCES REGULATED BY THE |
| CODE SHALL BE LISTED AND LABELED. FGC 301.3. |
| 8) SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR ALL GAS |
| FIRED EQUIPMENT (KITCHEN EQUIPMENT, DRYERS, POOL |
| EQUIPMENT, BOILERS, ETC.) PER FGC SEC. 304. SEE FGC |
| SEC. 304.9.3 FOR COMBUSTION AIR BEING SUPPLIED BY |
| MECHANICAL SYSTEMS. |
| 9) SHT. M2.01 - KITCHEN GAS APPLIANCE CALCULATIONS - IN |
| ACCORDANCE WITH 2014 FBC-FUEL GAS SEC.304.9.3 - THE |
| MAKEUP AIR FOR THE EXHAUST FOR THE HOOD CANNOT BE USED |
| TO SUPPLY COMBUSTION AIR TO THE APPLIANCES. |
| 10) SUBMIT SPECIFICATIONS FOR THE BOILER, VENT DETAILS, |
| VENT PIPING, ETC. WPB AMEND. TO FBC SEC. 107.2.1. |
| 11) SUBMIT DETAILS FOR DRYER VENTS, TERMINATION POINTS, |
| VENT MATERIAL, ETC. WPB AMEND. TO FBC SEC. 107.2.1. |
| 12) SHT. K1 PRS SHOWS GAS APPLIANCE PBF-1 (DECK |
| OVEN/PIZZA) AT 140 MBTU. I DO NOT SEE THIS APPLIANCE OR |
| THE BTU VALUE ON THE GAS PLANS. CLARIFY. |
| 13) SUBMIT SPECS .FOR THE PVC VENTS FOR THE BOILERS TO |
| CONFIRM PVC IS APPROVED.SHOW THE HEIGHT ABOVE THE ROOF, |
| ANCHORING DETAILS (IF APPLICABLE), COMPLY WITH 2014 |
| FBC-FUEL GAS SEC. |
| 14) SUBMIT DETAILS FOR THE DRYER VENTS, VENT MATERIAL, |
| HEIGHT ABOVE ROOF, ANCHORING DETAILS (IF APPLICABLE). |
| IF PVC IS USED, SUBMIT DETAILS FROM DRYER MANUF. TO |
| SHOW PVC IS APPROVED TO BE USED.ROOF THE RESPONSE |
| NARRATIVE REFERS TO SHT. M2.10, NOTES #2,3,& 4. THESE |
| NOTES HAVE NOTHING TO DO WITH THE DRYER VENTS. THE |
| LAUNDRY IS ON THE 2ND FLOOR, NOT THE ROOF. |
| 15) INDICATE THE POOL/SPA BOILERS ON THE PLANS.WPB |
| AMEND. TO FBC SEC. 107.2.1. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805 PLUMBING PLAN REVIEW |
| -6692 |
| [email protected] |
| |
| |