Plan Review Notes For Permit 16061268 |
Permit Number |
16061268 |
|
Review Stop |
P |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2016-07-29 12:57:29 | 1) INDICATE ON THE SPECIFICATION SHEETS WHICH HOSE | | PRODUCT WILL BE USED WITH WHAT CHEMICALS. WPB AMEND. TO | | FBC SEC.107.2.1. | | 2) THE SUBMITTED PLAN SHALL BE SIGNED AND SEALED BY THE | | LANDSCAPE ARCHITECT.FAC 61G10-11.010 | | 3) SHOW THE SIZES OF THE CHEMICAL TANKS ON THE | | PLANS.WPB AMEND. TO FBC SEC.107.2.1. | | 4) SUBMIT DETAILS AS TO HOW THE CHEMICAL TANKS WILL BE | | ANCHORED TO WITHSTAND THE 170 MPH WIND LOAD | | REQUIREMENTS OF 2014 FBC SEC. 1609. | | 5) INDICATE ON THE PLANS THE TYPE OF CONTAINMENT THAT | | IS BEING PROVIDED AND THE CAPACITY OF THE CONTAINMENT | | IN RELATION TO THE SIZE OF THE CHEMICAL TANKS ( 110%, | | 125%, ETC.).WPB AMEND. TO FBC SEC.107.2.1. | | 6) SUBMIT DETAILS AS TO HOW THE PIPING WILL BE ATTACHED | | TO THE CONCRETE PAD | | 7) THE KURIYAMA ORV HOSE IS MADE FROM PVC. SUBMIT | | MANUFACTURER'S SPECIFICATIONS AS TO HOW THE HOSE WILL | | BE PROTECTED FROM UV RAYS IF EXPOSED. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | |
|