Date |
Text |
2016-07-27 15:37:17 | 2ND REVIEW |
| |
| |
| |
| GEORGE JOHNSON |
| PLUMBING PLANS EXAMINER LL |
| CITY OF WEST PALM BEACH |
| DEVELOPMENT SERVICES |
| BUILDING DIVISION |
| 561-805-6711 |
| [email protected] |
| |
| |
| PLUMBING COMMENTS: 2ND REQUEST |
| |
| 1. PROVIDE MANUFACTURE SPECIFICATION AND INSTILLATION |
| GUIDE. PER WPB AMEND. TO FBC SEC. 107.2.1 THE |
| MANUFACTURE SPECIFICATION MUST SHOW COMPLIANCE WITH THE |
| FSEC STANDARD 101-15 |
| |
| |
| |
| |
| 2. PROVIDE PLUMBING RISER DIAGRAM THAT SHOWS COMPLIANCE |
| WITH FBC M SEC 1402.5.1 PRESSURE AND TEMPERATURE. |
| SOLAR ENERGY SYSTEM COMPONENTS CONTAINING PRESSURIZED |
| FLUIDS SHALL BE PROTECTED AGAINST PRESSURES AND |
| TEMPERATURES EXCEEDING DESIGN LIMITATIONS WITH A |
| PRESSURE AND TEMPERATURE RELIEF VALVE. EACH SECTION OF |
| THE SYSTEM IN WHICH EXCESSIVE PRESSURES ARE CAPABLE OF |
| DEVELOPING SHALL HAVE A RELIEF DEVICE LOCATED SO THAT A |
| SECTION CANNOT BE VALVED OFF OR OTHERWISE ISOLATED FROM |
| A RELIEF DEVICE. RELIEF VALVES SHALL COMPLY WITH THE |
| REQUIREMENTS OF SECTION 1006.4 AND DISCHARGE IN |
| ACCORDANCE WITH SECTION 1006.6. |
| 1402.5.3 PROTECTION FROM FREEZING. |
| SYSTEM COMPONENTS SHALL BE PROTECTED FROM DAMAGE BY |
| FREEZING OF HEAT TRANSFER LIQUIDS AT THE LOWEST AMBIENT |
| TEMPERATURES THAT WILL BE ENCOUNTERED DURING THE |
| OPERATION OF THE SYSTEM. |
| |
| |
| |
| DUE TO THE DEFICIENCIES OF THIS PLAN A COMPLETE AND |
| THOROUGH REVIEW CANNOT BE DONE AT THIS TIME. UPON |
| RESUBMITTAL THERE MAYBE ADDITIONAL COMMENTS. |
| WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES |
| AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW |
| COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE |
| AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW. |