2016-06-21 10:49:47 | 1) SHT. AN-1.0 - CODE REFERENCES - REFERENCE IS MADE TO |
| THE 2001 WPB AMENDMENTS TO FBC. REVISE TO READ 2014 |
| AMENDMENTS. |
| 2) SHT.AN-3.0 - PLUMBING FIXTURE REQUIREMENTS - REFER |
| TO TABLE 403.1 OF 2014 FLORIDA PLUMBING CODE. |
| 3) IDENTIFY THE DIFFERENT OCCUPANCY AREAS ON THE PLAN. |
| 4) THE OCCUPANT LOAD CALCULATIONS SHOW AN OCCUPANT LOAD |
| OF 153 PERSONS AND THE PLUMBING FIXTURE REQUIREMENTS |
| NOTES 297 PERSONS. CLARIFY. |
| 5) THE WATER FILTRATION SYSTEM SHALL BE PROTECTED |
| AGAINST CONTAMINATION PER 2014 FBC SEC.608.3. |
| 6) SUBMIT FACTORY SIZING CALCULATIONS FOR THE GREASE |
| TRAP & GREASE INTERCEPTOR. YOU CAN CONTACT LEE |
| SCHNEEWEISS WITH SCHIER AT 1-800-538-4792. 2014 |
| FBC-PLUMBING SEC.1003.2. |
| 7) IS THIS A CHANGE OF OCCUPANCY? INDICATE ON THE |
| PLANS. IF SO, ADDITIONAL REVIEW COMMENTS MAY BE |
| GENERATED. |
| 8) SHT. A-7.3 - THE ACCESSIBLE URRINAL SHALL BE MOUNTED |
| WITH THE RIM LOCATED AT 17 INCHES ABOVE FINISH FLOOR, |
| NOT 1'-7" AS SHOWN. 2014 FAC SEC. 605.2. |
| 9) GRAB BARS SHALL BE MEASURED TO THE TOP OF THE |
| GRIPPING SURFACE PER THE 2014 FAC SEC. 609.4. |
| 10) SHT. P5.1 - THE SANITARY RISER SHOWS AN UNVENTED |
| SINK (SK-1) DRAINING INTO THE TOP OF THE |
| INTERCEPTOR.CLARIFY. |
| 11) THE DISCHARGE OF THE INTEERCEPTORS ARE SHOWN AS |
| INDIRECCT WASTES ON BOTH INTERCEPTORS. CLARIFY.ALSO, |
| CLARIFY THE INLET CONNECTION TO THE AUTOMATIC GREASE |
| INTERCEPTOR. |
| |
| PLUMBING PLAN REVIEW |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805-6692 |
| [email protected] |
| |