2016-08-29 17:30:55 | REAR STRUCTURE: |
| RESIDENTIAL (R3) ALTERATION SECOND BUILDING REVIEW |
| CHECKLIST. |
| CODE: FBC 5TH EDITION (2014) |
| |
| ORIGINAL COMMENT: |
| 1- SCOPE OF WORK IS NOT CLEAR. CLEARLY SPECIFY EXTENT |
| OF WORK TO BE PERFORMED. SPECIFY WHAT'S NEW , WHAT'S |
| EXISTING, ETC. SEC. 107.2.1 CITY CITY AMENDMENTS. |
| |
| RESPONSE: |
| (1) SCOPE BUILDING NOTE #2 STATES "REPAIR DAMAGED |
| EXISTING FRAMING AND LAPPED SIDING ON EXISTING EXTERIOR |
| WALL, TO MATCH EXISTING". NEED TO IDENTIFY REPAIR AREAS |
| AND PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR THE |
| STRUCTURAL REPAIRS. CLEARLY SPECIFY ALL FRAMING MEMBERS |
| AND CONNECTORS. SEC. R301.1 FBC-RESIDENTIAL, 5TH |
| EDITION (2014). |
| |
| (2) SCOPE OF WORK SHOWN ON FP-1 DRAWING DOESN'T MATCH |
| SCOPE OF WORK SHOWN ON DRAWING FP-1 SUBMITTED UNDER THE |
| MAIN HOUSE PERMIT #16051207. REVISE ALL SCOPE OF WORK |
| TO MATCH. SEC. 107.2.1 CITY AMENDMENTS. |
| |
| ORIGINAL COMMENT: |
| 2- PROVIDE THE NAME AND SIGNATURE IN ALL PLANS OF THE |
| PERSON RESPONSIBLE FOR THE DESIGN AS REQUIRED BY SEC. |
| 107.2.1 CITY AMENDMENTS. |
| |
| RESPONSE: |
| STILL MISSING THE NAME OF THE PERSON RESPONSIBLE FOR |
| THE DESIGN. |
| |
| 3- IF THE ENTRY DOOR OF THE FIRST FLOOR IS GOING TO BE |
| REPLACED, THEN PROVIDE PRODUCT APPROVAL (2 COPIES) AS |
| REQUIRED BY FAC 61G20-3.002(33). |
| |
| |
| **** PLEASE REMOVE ANY REVISED DRAWING AND INSERT THE |
| NEW DRAWING. DON'T STAPLE OLD DRAWINGS. SUBMIT OLD |
| DRAWINGS FOR REFERENCE. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| DEVELOPMENT SERVICES DEPARTMENT |
| (561)805-6712 |
| [email protected] |