Plan Review Notes
Plan Review Notes For Permit 16051078
Permit Number 16051078
Review Stop G
Sequence Number 4
Notes
Date Text
2017-05-19 14:25:441) THE GAS RISER REFERS TO CSST YET THERE IS NO
 INFORMATION REGARDING THE CSST ON THE PLANS.WICH TABLE
 FROM THE GAS CODE IS BEING USED TO SIZE THE CSST? NOTE
 ON THE PLANS WHICH SIZING TABLE IS BEING USED TO SIZE
 THE CSST SYSTEM. CLARIFY.
 2) SHOW ALL PIPE SIZES, AND THE CORRESPONDING EHD
 NUMBER OF THE CORRUGATED STAINLESS STEEL TUBING. WPB
 AMEND. TO FBC SEC. 107.2.1.
 3) CLEARLY SHOW ON THE GAS RISER WHERE THE GAS PIPE
 TRANSITIONS FROM SCH. 40 METALLIC PIPE TO CSST. WPB
 AMEND. TO FBC SEC. 107.2.1.
 4) SHOW THE DISTANCE FROM EACH REGULATOR TO THE
 APPLIANCE OR PIECE OF EQUIPMENT SERVED AND THE TYPE OF
 PIPE MATERIAL AND SIZE. 2014 FBC-FUEL GAS SEC.402.4.3.
 5) SUBMIT AN EXPANDED, CLEAR AND LEGIBLE GAS RISER FOR
 REVIEW. WITH ALL THE DELTAS, CLOUDS AND EVERYTHING ELSE
 CRAMMED ONTO THE GAS RISER I CANNOT PERFORM A
 COMPRHENSIVE REVIEW ON THE SYSTEM. WPB AMEND. TO FBC
 SEC. 107.2.1.
 6) THE PLANS SHOW THE LP TANK AS ABOVE GROUND. HOW IS
 THE GAS PIPING GETTING TO THE BUILDING? IF ANY PIPE IS
 BEING RUN UNDERGROUND, SHOW THE TYPE OF PIPE MATERIAL,
 SIZE, PSI, AND NOTE THE SIZING TABLE USED TO SIZE THE
 SECTION OF PIPE ON THE PLANS.WPB AMEND. TO FBC SEC.
 107.2.1.
 7) NOTE ON THE PLAN THE LONGEST LENGTH OF PIPING FROM
 THE LP TANK TO THE MOST REMOTE LINE PRESSURE REGULATOR.
 THIS DISTANCE IS TO BE USED FOR SIZING THE MEDIUM
 PRESSURE SYSTEM.2014 FBC-FUEL GAS SEC.402.4.3.
 8) SHT. C4.01 SHOWS A 1 1/2 INCH GAS LINE FROM THE LP
 TANK AND THE GAS RISER SHOWS A 1 INCH LINE. A 1 1/2
 INCH LINE IS ALSO SHOWN ON SHT. P3.1. CLARIFY. 2ND
 REQUEST.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  