2017-05-22 11:10:46 | APPROVED WITH THE FOLLOWING CONDITION: |
| |
| COMMENTS MADE EARLIER (05/19/2017) ARE REVISED AS |
| FOLLOWS: |
| |
| CIVIL/SITE PLANS INCLUDED IN THE 'BUILDING PERMIT' |
| PACKET (UNDER THIS PERMIT #16051078) ARE OLDER BUT THE |
| ENGINEERING SERVICES DEPARTMENT HAS THE LATEST |
| CIVIL/SITE PLANS SUBMITTED SEPARETLY (BY CHEN-MOORE) TO |
| OUR DEPARTMENT AND THEY ARE BEING REVIEWED UNDER |
| ENGINEERING PERMIT #E17010029. |
2017-05-19 16:04:45 | FOLLOWING COMMENTS ARE VOID NOW. PLEASE SEE COMMENTS OF |
| 05/22/2017. |
| |
| (APPROVED WITH FOLLOWING CONDITIONS: |
| |
| ONLY CIVIL PLANS WERE CHECKED PART OF THIS REVIEW. ALL |
| THE 16 SHEETS OF THE 'CIVIL SET' OF THE 'BUILDING |
| DEPARTMENT PERMIT SET/PACKET' NEED TO BE REPLACED WITH |
| ALL THE SHEETS OF THE FINAL PLANS/SET ONCE APPROVED BY |
| THE CITY'S ENGINEERING SERVICES DEPARTMENT PRIOR TO |
| ISSUANCE OF 'BUILDING PERMIT'. |
| |
| |
| COMMENTS/EXPLANATIONS ARE STATED BELOW: |
| |
| CIVIL PACKAGE/PLANS ARE SUBMITTED SEPARATELY TO THE |
| ENGINEERING SERVICES DEPARTMENT FOR ENGINEERING |
| DEPARTMENT APPROVAL WHICH ARE CURRENLY UNDER REVIEW |
| (REVISED PLANS ARE SUBMITTED TO OUR DEPARTMENT ON MAY |
| 18, 2017). |
| |
| CIVIL PLAN SHEETS (STAMPED BY THE E.O.R ON 5/17/2017 OR |
| EARLIER DATES) INCLUDED IN THE 'BUILDING DEPARTMENT |
| SET' (UNDER THIS PERMIT APPLICATION) SOMEWHAT DIFFER |
| FROM THE LATEST PLAN SHEETS SUBMITTED TO THE |
| ENGINEERING SERVICES DEPARTMENT. FOLLOWING ARE SOME |
| NOTICABLE DIFFERENCES: |
| |
| ** SHEET C2.03 (4 OF 18): INLET PROTECTION DETAIL IS |
| NOT SHOWN; |
| |
| ** SHEET C3.01 & C3.02 (5 AND 6 OF 18): SITE PLAN AND |
| AUTO-TURN EXHIBIT SHOWS DETENTION AREAS (BUT LATEST |
| PLANS SUBMITTED TO ENG. DEPT. HAS NO DETENTION |
| BASINS/PONDS IN THEM); |
| |
| ** SHEET C5.01 (8 OF 18): PAVING, GRADING AND DRAINAGE |
| PLAN SHOWS DRY DETENTION POND AND A FLUME BEHIND THE |
| DUMPSTER ENCLOSURE; ALSO ANOTHER DETENTION BASIN AND |
| STORM STRUCTURES SHOWN NEAR THE SOUTH ENTRANCE (OFF |
| PARK PLACE). CIVIL PLANS SUBMITTED TO OUR DEPARTMENT |
| ARE MOST UP TO DATE (DATED 5/18/2017) AND DO NOT HAVE |
| ANY DRY DETENTION PONDS/BASINS AND DRAINAGE STRUCTURES; |
| |
| ** SHEETS C6.01 THROUGH C6.08 (9 THROUGH 16 OF 18): |
| CIVIL DETAIL SHEETS IN THIS PACKAGE NEED TO BE |
| CONSISTENT WITH THE DETAIL SHEETS IN THE CIVIL PACKAGE |
| SUBMITTED AND APPROVED BY OUR DEPARTMENT.) |
| |
| |
| |
| |