2016-06-15 10:12:51 | 1) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| CORRUGATED STAINLESS STEEL TUBING (IF APPLICABLE) FOR |
| EACH PIPE SIZE. WPB AMENDMENTS TO FBC SEC.107.2.1. THE |
| PIPE SIZES ARE ILLEGIBLE, THEY ARE TOO SMALL TO READ. |
| |
| 2) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| FROM THE TANK TO THE STEP DOWN REGULATOR AND FROM THE |
| STEP DOWN REGULATOR TO THE APPLIANCES. ON THE PLAN PER |
| 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. SEC. G2413.2. |
| . |
| |
| 3) SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR THE DRYER |
| PER 2014 FGC SEC.304.1. |
| |
| 4) GAS APPLIANNCES SHALL BE LISTED AND LABELED. THE |
| INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT |
| SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC |
| SEC.305.1. |
| |
| 5) SHT. C4.01 SHOWS A ONE INCH GAS LINE AND SHT. P5.1 |
| APPEARS TO SHOW A DIFFERENT SIZE. CLARIFY. |
| |
| 6) SHT. C4.01 REFRES TO AN UNDERGROUND LP TANK BUT SHT. |
| P3.1 APPEARS TO SHOW AN ABOVEGROUND TANK. CLARIFY. |
| |
| 7) EMERGENCY HOOD SHUT DOWN SHUT OFF VALVE SHALL BE |
| BELOW THE CEILING. THE MANUAL SHUTOFF VALVE SHALL BE |
| UPSTREAM. UNION TO BE DOWN STREAM OF MANUAL VALVE. |
| |
| 8) CLEARLY SHOW THE LOCATION AND CAPACITY OF LP |
| TANK(S), TYPE OF TANK ( DOT OR ASME ), THE DISTANCE OF |
| THE TANK FROM THE EXTERIOR BUILDING WALL AND ADJACENT |
| PROPERTY LINES, THE DISTANCE OF THE TANK FROM ALL |
| SOURCES OF IGNITION, OTHER CONTAINERS, BUILDINGS, AND |
| THE LOCATION OF ANY BUILDING OPENINGS BELOW THE RELIEF |
| VALVE OF THE TANK PER NFPA 58, TABLE 3-2.2.2. |
| |
| 9) CLEARLY INDICATE ON THE PLAN IF THE LP TANK IS ABOVE |
| GROUND OR BELOW GROUND, AND SHOW THE METHOD OF REQUIRED |
| PROTECTION FOR THE LP TANK AND APPURTENANCES PER NFPA |
| 58. IF THE TANK IS BELOW GROUND IT SHALL BE ANCHORED |
| PER NFPA 58 SEC.3-2.2.7 (H). IF ABOVE GROUND, THE TANK |
| SHALL BE SECURELY ANCHORED TO WITHSTAND 170 MPH ULT |
| WIND LOAD PER THE FLORIDA BUILDING CODE. |
| |
| 10) SHT.P5.1 - DELETE THE REFERENCE TO THE 2004 EDITION |
| OF THE FBC. THE CODE IN EFFECT IS THE 2014 EDITION. |
| |
| 11) PLEASE CHECK BTU LOAD ON THE SYSTEM.I HAVE |
| CALCULATED A DIFFERENT BTU LOAD. |
| |
| |
| PLUMBING PLAN REVIEW |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805-6692 |