2017-03-09 16:14:06 | MECHANICAL PROVISOS. |
| NORTON MUSEUM OF ART |
| PERMIT #16050912 |
| 3/9/2017 |
| |
| 1) THE MECHANICAL PLANS HAVE BEEN APPROVED |
| CONDITIONALLY. A REVISION TO THE PLANS IS REQUIRED TO |
| CORRECT THE DEFICIENCIES LISTED BELOW. |
| |
| A) PROVIDE DUCT SMOKE DETECTORS IN THE RETURN SYSTEMS |
| OF THE AHU'S. |
| |
| B) PROVIDE FIRE DAMPERS FOR ALL DUCTS PENETRATING THE |
| FIRE-RATED WALL OF MECHANICAL ROOM 302. |
| |
| C) A NEW CHILLER (CH-1) IS BEING INSTALLED IN THE |
| EXISTING MECHANICAL ROOM. ADDITIONAL VENTILATION FOR |
| NORMAL AND EMERGENCY VENTILATION MAY BE REQUIRED. REFER |
| TO SECTIONS 1105.6- 1105.6.3.2 FBC-14 MECHANICAL AND |
| PROVIDE EXHAUST VENTILATION CALCULATIONS FOR BOTH |
| NORMAL AND EMERGENCY CONDITIONS AS REQUIRED BY SECTIONS |
| 1105.6.3.1 AND 1105.6.3.2. SHOW LOCATIONS OF ALL |
| COMPONENTS OF THE VENTILATION SYSTEM INCLUDING EXHAUST |
| FANS AND AIR INTAKES. INCLUDE EQUIPMENT SCHEDULES FOR |
| ALL EXISTING FANS OR NEW FANS (EXHAUST OR INTAKE) |
| INDICATING THEIR CAPACITIES, AND THE DIMENSIONS OF ALL |
| AIR INTAKE OPENINGS. PLEASE NOTE THE NEW CH-3 USES A |
| DIFFERENT REFRIGERANT THAN THE EXISTING CH-1 AND CH-2, |
| THEREFORE THE EXISTING LEAK DETECTOR MAY NOT BE |
| COMPATIBLE. |
| SUBMIT SPECIFICATIONS FOR THE LEAK DETECTOR. |
| |
| D) AHU HEATING COIL: CORRECT OR CLARIFY THE CONFLICTS |
| BETWEEN THE AC CALCULATIONS FOR THE HEATING COIL |
| SELECTION VERSUS THE HEATING CAPACITIES SHOWN IN THE |
| EQUIPMENT SCHEDULES: AHU'S 3, 14, 18, 19, 20, & 22. |
| |
| 2) DEFERRED SUBMITTALS: AS REQUESTED BY THE CONTRACTOR |
| PLEASE REVIEW THE FOLLOWING LIST OF DEFERRED |
| SUBMITTALS. PLEASE NOTE:) DEFERRED SUBMITTALS SECTION |
| 107.3.4.2 WPB AMENDMENTS TO THE FBC. FOR THE PURPOSES |
| OF THIS SECTION, DEFERRED SUBMITTALS ARE DEFINED AS |
| THOSE PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT |
| THE TIME OF THE APPLICATION AND THAT ARE TO BE |
| SUBMITTED TO THE BUILDING OFFICIAL WITHIN A SPECIFIED |
| PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE |
| PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| FOR REVIEW BY THE BUILDING OFFICIAL. |
| DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| OFFICIAL. |
| |
| A) STRUCTURAL ENGINEERING FOR INSTALLATION OF THE |
| COOLING TOWERS INCLUDING THE SUPPORT BASE, ACCESS |
| STAIRS, WALKWAYS AND PLATFORM. |
| |
| B) MECHANICAL AND ELECTRICAL POWER AND LIGHTING SYSTEMS |
| COMMISSIONING: PRELIMINARY AND FINAL REPORTS. |
| |
| C) FLORIDA PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S |
| FOR LOUVERS PROTECTING OUTSIDE AIR AND EXHAUST OUTLET |
| OPENINGS. PLEASE NOTE:) PRODUCT APPROVALS- THOSE |
| PRODUCTS WHICH ARE REGULATED BY THE DCA RULE 9N-03 |
| SHALL BE REVIEWED AND APPROVED IN WRITING BY THE |
| DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR |
| JURISDICTIONAL APPROVAL. |
| |
| D) MANUFACTURER'S SPECIFICATIONS FOR THE GLOBAL PLASMA |
| SOLUTIONS IAQ EQUIPMENT AND DEVICES. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |