2016-10-26 08:23:332ND REVIEW FBC-2014 MECHANICAL
 PERMIT #16050912
 NORTON MUSEUM OF ART
 10/25/16
  
 THE SECOND REVIEW OF THE RESUBMITTED PLANS AND
 DOCUMENTS INDICATE THAT MANY OF THE 1ST REVIEW COMMENTS
 STILL EXIST EITHER ENTIRELY OR PARTIALLY. THOSE
 COMMENTS AND THE DESIGN PROFESSIONAL'S NARRATIVE
 RESPONSES WILL BE REFERENCED IN THIS FOLLOW-UP REVIEW
  
 1) COMMENT #1 FROM THE 1ST REVIEW: AS REQUESTED BY THE
 ENGINEER IN THE NARRATIVE, THE COMMISSIONING OF THE
 BUILDING MECHANICAL AND ELECTRICAL POWER AND LIGHTING
 SYSTEMS IS ACCEPTABLE AS A DEFERRED SUBMITTAL, HOWEVER
 AN OUTLINE OF THE PROCEDURES MUST BE PLACED ON THE
 MECHANICAL AND ELECTRICAL PLANS.
  
 2) COMMENT #2, 1ST REVIEW: THE REQUESTED AC COOLING AND
 HEATING CALCULATIONS WERE NOT SUBMITTED- PLEASE
 PROVIDE.
  
 3) COMMENT #3: THE ENERGYGAUGE COMPLIANCE SUBMITTAL
 MUST BE SIGNED BY THE OWNER/AGENT.
  
 4) COMMENT #4: PLEASE REFER TO SECTION 6.3.6 ASHRAE
 62.1- 2010 AND SUBMIT DOCUMENTATION TO CLARIFY THE IAQ
 PROCEDURE.
  
 6.3.6 DOCUMENTATION. WHEN THE IAQ PROCEDURE IS USED,
 THE FOLLOWING INFORMATION SHALL BE INCLUDED IN THE
 DESIGN DOCUMENTATION:
 THE CONTAMINANTS OF CONCERN CONSIDERED IN THE
 DESIGN PROCESS, THE SOURCES AND EMISSION RATES OF THE
 CONTAMINANTS
 OF CONCERN, THE CONCENTRATION LIMITS AND EXPOSURE
 PERIODS
 AND THE REFERENCES FOR THESE LIMITS, AND THE ANALYTICAL
 APPROACH USED TO DETERMINE VENTILATION RATES AND AIR
 CLEANING
 REQUIREMENTS. THE CONTAMINANT MONITORING AND OCCUPANT
 AND/
 OR VISITOR EVALUATION PLANS SHALL ALSO BE INCLUDED IN
 THE DOCUMENTATION.
  
 5) COMMENTS #5 & 6: DEFERRED SUBMITTALS FOR THE O/A
 LOUVERS ARE ACCEPTABLE PER THE NARRATIVE REQUEST,
 HOWEVER THE LOCATIONS AND CLEARANCES FOR THE AIR
 INTAKES MOST BE SHOWN ON THE PLANS.
  
 6) COMMENT #7: THE NARRATIVE REFERENCES SHEET M-604 IN
 RESPONSE TO THE COMMENT, HOWEVER THAT PLAN SHEET HAS
 NOT BEEN UPLOADED FOR REVIEW.
  
 7) COMMENT #8: THE REQUESTED EXHAUST VENTILATION
 CALCULATIONS FOR THE CHILLER ROOM AND FAN SCHEDULE WERE
 NOT PROVIDED- SEE SECTIONS 1105.6.3.1 AND 1105.6.3.2
 AND INDICATE COMPLIANCE.
  
 8) COMMENT #10: THE NARRATIVE RESPONSE SUBMITTED TO
 THIS COMMENT STATES THAT THE ANCHORAGE OF THE COOLING
 TOWERS WILL BE ENGINEERED AND INSTALLED BY THE
 CONTRACTOR. PLEASE NOTE THAT THE STRUCTURAL PLANS AND
 DETAILS FOR INSTALLATION OF THE COOLING TOWERS
 INCLUDING THE SUPPORT BASES AND ATTACHMENTS SHALL BE
 DESIGNED BY A FL. LICENSED ENGINEER IN ACCORDANCE WITH
 FLORIDA STATUTE 471. PLEASE PROVIDE THE REQUESTED
 ENGINEERING AND SUBMITTAL DOCUMENTS.
  
 9) COMMENT #12: PLEASE CORRECT THE ENERGY SUBMITTAL
 WHICH INDICATES 1 CHILLER INSTEAD OF THE 3 BEING
 INSTALLED, AND SUBMIT MANUFACTURER'S SPECIFICATIONS AS
 PREVIOUSLY REQUESTED.
  
 10) PLEASE REFER BACK TO COMMENT #14 FROM THE 1ST
 REVIEW AND ADD THE REQUESTED KEY NOTES TO IDENTIFY DUCT
 DROPS AND RISERS AND THEIR RESPECTIVE AHU'S.
  
 A) SEE SECTIONS 606.2.1 AND 606.2.3 AND SHOW THE
 LOCATIONS OF ALL REQUIRED DUCT SMOKE DETECTORS.
  
 B) REFER TO SECTION 607.5.4. AND PROVIDE SMOKE DAMPERS
 FOR ALL DUCTS LISTED BELOW THAT PENETRATE SMOKE
 BARRIERS, UNLESS MEETING ONE OF THE THREE EXCEPTIONS
 LISTED UNDER THE SECTION.
 M121.5- 12X10 DUCT AT SMITH GALLERY 131/RESTROOM WALL.
 M121.8- 38X14 & 42X14 DUCTS AT LAUDER RESTAURANT
 120/LOBBY 118/CORRIDOR 113 WALLS.
 M122.8- 12X12 AT CONFERENCE 223/MCGRAW 225.
 30X12 AT MCGRAW 225/VESTIBULE 226.
 14X10 AT MARDEN 226/MCGRAW 225.
 M123.7- ALL DUCTS TRAVERSING THROUGH THE MARDEN GALLERY
 226/ CLASSROOM 221/ THE ADMISSIONS/GRAND HALL/& OFFICES
 209 & 210.
 M123.8- DUCTS AT CORRIDOR 301/MEP & GROSS GALLERY 304.
 PROVIDE KEY NOTES AT ALL FD, FSD, AND SD DAMPER
 LOCATIONS.
  
 C) M122.5B: SHOW HORIZONTAL DAMPERS AT DUCT
 PENETRATIONS OF THE FLOOR/CEILING ASSEMBLY IN THE
 MECHANICAL EQUIPMENT ROOM. THIS COMMENT SHALL APPLY TO
 ALL PLAN SHEETS SHOWING DUCTS PENETRATING HORIZONTAL
 MEMBRANES
  
 D) AS PREVIOUSLY REQUESTED PLEASE IDENTIFY ALL ROOMS ON
 THE MECHANICAL PLANS.
  
 12) COMMENT #16: PROVIDE A CONDENSATE DISPOSAL RISER
 AND LAYOUT PLAN SHOWING ALL PIPING RUNS, PIPE TYPES AND
 SIZES, AND DISCHARGE LOCATIONS.
  
 13) PLEASE PROVIDE A MECHANICAL SYMBOL AND LEGEND PLAN
 SHEET.
  
 14) REFER TO SECTION 107.3.4.2 WPB AMENDMENTS OF THE
 FBC AND PROVIDE ON THE PLAN OR IN DOCUMENT FORM A LIST
 OF ALL MECHANICAL EQUIPMENT AND COMPONENTS THAT ARE
 REQUESTED TO BE DEFERRED SUBMITTALS.
  
 A) DEFERRED SUBMITTAL: 107.3.4.2 DEFERRED SUBMITTALS.
 FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS
 ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE
 NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT
 ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A
 SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL
 HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION
 DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
 B) DEFERRED SUBMITTAL. 2010 FBC 107.3.4.1 PRODUCT
 APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED BY THE
 DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN
 WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL
 FOR JURISDICTIONAL APPROVAL.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  