Date |
Text |
2016-06-20 16:14:05 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| 1) SHEET FS 200 - THERE IS NO INDICATION THAT THE HOOD |
| VENTING WILL BE INSTALLED PER NFPA 96 AND UNDER |
| SEPARATE SHOP DRAWINGS. |
| |
| NFPA 101 |
| CHAPTER 9 BUILDING SERVICE AND FIRE PROTECTION |
| EQUIPMENT |
| |
| 9.2.3 COMMERCIAL COOKING EQUIPMENT. COMMERCIAL COOKING |
| EQUIPMENT SHALL BE IN ACCORDANCE WITH NFPA 96, STANDARD |
| FOR VENTILATION CONTROL AND FIRE PROTECTION OF |
| COMMERCIAL COOKING OPERATIONS, UNLESS SUCH |
| INSTALLATIONS ARE APPROVED EXISTING INSTALLATIONS, |
| WHICH SHALL BE PERMITTED TO BE CONTINUED IN SERVICE. |
| |
| NFPA 96, CHAPTER 4 GENERAL REQUIREMENTS |
| 4.1 GENERAL. |
| 4.1.1 COOKING EQUIPMENT USED IN PROCESSES PRODUCING |
| SMOKE OR GREASE-LADEN VAPORS SHALL BE EQUIPPED WITH AN |
| EXHAUST SYSTEM THAT COMPLIES WITH ALL THE EQUIPMENT AND |
| PERFORMANCE REQUIREMENTS OF THIS STANDARD. |
| |
| PLEASE PROVIDE THE APPLICABLE NOTE. |
| |
| |
| 2) SHEET S 300 - THERE APPEARS TO LIGHTWEIGHT TRUSS |
| CONSTRUCTION WITHIN AND ON THE STRUCTURE. |
| |
| PER FLORIDA 69A-60.0081; NOTICE SIGNAGE IS REQUIRED FOR |
| STRUCTURES WITH LIGHT-FRAME TRUSS-TYPE CONSTRUCTION. |
| ANY COMMERCIAL, INDUSTRIAL, OR ANY MULTIUNIT |
| RESIDENTIAL STRUCTURE OF THREE UNITS OR MORE WHICH USES |
| HORIZONTAL OR VERTICAL LIGHT-FRAME TRUSS-TYPE |
| CONSTRUCTION IN ANY PORTION SHALL BE MARKED WITH A |
| MALTESE CROSS SIGN MEASURING 8 INCHES HORIZONTALLY AND |
| 8 INCHES VERTICALLY, OF A BRIGHT RED REFLECTIVE COLOR. |
| THE APPROVED SYMBOL SHALL BE PLACED WITHIN 24 INCHES TO |
| THE LEFT OF THE MAIN ENTRY DOOR. |
| 1. STRUCTURES WITH LIGHT-FRAME TRUSS ROOFS SHALL BE |
| MARKED WITH THE LETTER "R". |
| 2. STRUCTURES WITH LIGHT-FRAME TRUSS FLOOR SYSTEMS |
| SHALL BE MARKED WITH THE LETTER "F". |
| 3. STRUCTURES WITH LIGHT-FRAME TRUSS FLOOR AND ROOF |
| SYSTEMS SHALL BE MARKED WITH THE LETTERS "R/F". |
| |
| |
| 3) SHEET LS 001 & FP 100 - A STANDPIPE SYSTME IS |
| INDICATED ON LS 100; HOWEVER, THERE IS NO INDICATIONS |
| OF STANDPIPE(S) ON FP 100. |
| |
| PLEASE PROVIDE INDICATIONS AND LOCATIONS OF STANDPIPE |
| PROTECTION. |
| |
| |
| 4) SHEET E 001 - THERE IS NO INDICATION THAT THE FIRE |
| ALARM WILL BE INSTALLED PER NFPA 72 AND UNDER SEPARATE |
| SHOP DRAWINGS. |
| |
| NFPA 101, CHAPTER 9 BUILDING SERVICE AND FIRE |
| PROTECTION EQUIPMENT |
| 9.6.1.3 A FIRE ALARM SYSTEM REQUIRED FOR LIFE SAFETY |
| SHALL BE INSTALLED, TESTED, AND MAINTAINED IN |
| ACCORDANCE WITH THE APPLICABLE REQUIREMENTS OF N |
| FPA 70, NATIONAL ELECTRICAL CODE, AND NFPA |
| 72, NATIONAL FIRE ALARM AND SIGNALING CODE, UNLESS IT |
| IS AN APPROVED EXISTING INSTALLATION, WHICH SHALL BE |
| PERMITTED TO BE CONTINUED IN USE. |
| |
| PLEASE PROVIDE A NOTE INDICATING THAT THE FIRE ALARM |
| SHALL BE INSTALLED PER NFPA 72 AND UNDER SEPARATE SHOP |
| DRAWINGS.. |
| |
| |
| 5) SHEET LS 001 - THERE IS NO INDICATIONS THAT THE FIRE |
| ALARM WILL BE SUBMITTED AND INSTALLED UNDER SEPARATE |
| SHOP DRAWINGS. |
| |
| PLEASE PROVIDE A NOTE. |
| |
| |
| 6) SHEET LS 001 - THERE IS INDICATION UNDER THE TILTE |
| VERTICAL OPENINGS FOR THE INSTALLTION OF A DRAFT |
| CURTAIN AND CLOSELY SPACED SPRINKLERS. SHEET FP 100 AND |
| OTHER FP SHEETS DO NOT INCLUDE INDICATIONS OR DESIGN. |
| |
| PLEASE PROVIDE DESIGN INDICATORS FOR DRAFT CURTAINS AND |
| CLOSELY SPACED SPRINKLERS IN THE APPLICABLE SPACES PER |
| THE ENGINEER OF RECORD. |
| |
| |
| 7) SHEET A 806 - WITHIN THE DOOR SCHEDULE UNDER THE |
| HDWR SET HEADING THERE IS REFERENCE TO "E" NUMBERS AND |
| OTHER NUMBERS. THOSE INDICATORS COULD NOT BE READILY |
| IDENTIFIED ON THIS SHEET OR ANOTHER SHEET TO CONFIRM |
| PROPER HARDWARE. |
| |
| PLEASE CLARIFY OR IDENTFY THE CORRESPONDING SHEET. |
| |
| 8) SHEET LS 101 & A 806 - DOOR 116 IS INDCIATED WITHIN |
| A SMOKE BARRIER WALL; HOWEVER, THE DOOR SCHEDULE DOES |
| NOT INDICATE IT WITH ANY FIRE RATING. |
| |
| PLEASE CORRECT OR VERIFY. |
| |
| 9) SHEET LS 101 & A 806 - DOOR 118 D IS INDICATED |
| WITHINA SMOKE BARRIER WALL; HOWEVER, THE DOOR SCHEDULE |
| DOES NOT INDICATE IT WITH ANY FIRE RATING. |
| |
| 10) SHEET LS 101 & A 806 - DOOR 123 IS INDICATED WITHIN |
| A 2 HR FIRE RATED WALL; HOWEVER, THE DOOR SCHEDULE |
| INDICATES AS A SMOKE BARRIER DOOR. |
| |
| PLEASE COORECT TO 90 MIN. DOOR OR VERIFY. |
| |
| 11) SHEET LS 101, A 121 & A 806 - THE FLOOR LAYOUT |
| AROUND DOOR 105 IS SLIGHTLY DIFFERENT; HOWEVER, DOOR |
| 105 IS WITHIN A 2 HR FIRE RATED WALL AND THE DOOR |
| SCHEDULE DOES NOT INDICATE ANY FIRE RATING. |
| |
| PLEASE CORRECT TO 90 MIN DOOR OR VERIFY. |
| |
| 12) SHEET LS 102 & A 806 - DOOR 226E IS INDICATED |
| WITHIN A SMOKE BARRIER WALL; HOWEVER, THE DOOR SCHEDULE |
| DOES NOT INDICATE IT WITH ANY FIRE RATING. |
| |
| PLEASE COORECT TO 90 MIN. DOOR OR VERIFY. |
| |
| 13 ) SHEET LS 102 & A 806 - DOOR 225A IS INDICATED |
| WITHIN A SMOKE BARRIER WALL; HOWEVER, THE DOOR SCHEDULE |
| DOES NOT INDICATE IT WITH ANY FIRE RATING. |
| |
| PLEASE COORECT TO 90 MIN. DOOR OR VERIFY. |
| |
| 14) SHEET LS 101M & A 806 - DOOR 101 MA IS INDICATED |
| WITHIN A 2 HR FIRE RATED WALL; HOWEVER, THE DOOR |
| SCHEDULE INDICATES NO RATING. |
| |
| PLEASE COORECT TO 90 MIN. DOOR OR VERIFY. |
| |
| 15) SHEET LS 101 & A 806 - DOOR 124 IS INDICATED WITHIN |
| A 2 HR FIRE RATED WALL; HOWEVER, THE DOOR SCHEDULE |
| INDICATES NO RATING. |
| |
| PLEASE COORECT TO 90 MIN. DOOR OR VERIFY. |
| |
| 16) SHEET LS 101 & A 806 - THE DOOR CONNECTING VESTIBLE |
| 124 AND THE STAIRWELL DOES NOT APPEAR TO BE INDICATED |
| WITH A DOOR NUMBER AND IS NOT ON THE DOOR SCHEDULE. |
| |
| PLEASE COORECT OR VERIFY. |
| |
| 17) SHEET A 806 - THERE IS INDICATIONS WITHIN THE DOOR |
| SCHEDULE OF HARDWARE SET ID NUMBERS. I AM NOT ABLE TO |
| READLITY LOCATE THE SHEET THAT IDENTIFIES THE |
| CORRESPONDING HARDWARE SETS FOR VERIFICATION PURPOSES. |
| |
| PLEASE CORRECT OF VERIFY. |
| |
| 18) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |
| |
| |
| |
| |