Plan Review Notes For Permit 16050779
Permit Number 16050779
Review Stop P
Sequence Number 1
Notes
Date Text
2016-05-24 13:48:531) SHT.3.0 P REFERS TO THE 2007 & THE 2010 FBC. THE
 CODE IN EFFECT IS THE 2014 FBC. REVISE THE NOTES.
 2) IDENTIFY THE NEW WAIT STATION ON THE PLAN WHERE THE
 PLUMBING WORK IS BEING DONE. FBC 107.2.1.
 3) THE NOTES REFER TO A PIZZA OVEN BUT I DID NOT SEE
 THIS LISTED ON THE EQUIPMENT SCHEDULE. CLARIFY.
 4) SHOW THE CLEAR INSIDE DIMENSIONS OF THE ACCESSIBLE
 TOILET ROOM ON THE PLANS. THE MINIMUM WIDTH IS 85
 INCHES IF ALL FIXTURES ARE ON THE SAME WALL AND THE
 ROOM IS BUILT PERFECT. 86 INCHES ALLOWS FOR TOLERANCES.
 5) THE LAYOUT OF THE SANITARY AND GREASE RISERS ON SHT.
 P3.1 P DO NOT MATCH THE PLAN VIEW ON 3.0 P. CLARIFY.
 6) SHOW THE TERMINATION POINT OF THE VENT FOR THE MS
 FIXTURE SHT.3.1 P.
 7) SHT. C-1 SHOWS THE NUMBER OF SEATS AS 292 AND ON
 SHT.3.2 P THE GREASE INTERCEPTOR CALCULATION SHOWS 150
 SEATS.CLARIFY.
 8) SHT.1.0 A - NOTE #21 REFERS TO THE REPAIR OF
 PLUMBING IN THE KITCHEN AREA. CLARIFY AS TO WHAT THE
 SCOPE OF WORK IS IN THE KITCHEN.
 9) CLEARLY IDENTIFY THE NEW ACCESSIBLE RESTROOM ON THE
 PLANS.
 10) THE PLANS REFER TO WORK TO BE DONE IN THE LADIES
 ROOM BUT ARE VAGUE. CLEARLY DESCRIBE THE SCOPE OF WORK
 TO BE DONE IN THE LADIES ROOM. THE SAME APPLIES TO THE
 MEN'S ROOM.
 11) HOW IS ACCESSED GAINED TO THE THREE WATER CLOSETS
 IN THE WOMEN'S RESTROOM BY THE THE OFFICE? CLARIFY.
 12) SHOW THE GAS LINE ON SHT.3.0 P.
 13) THE GAS LOAD CALCULATIONS SHOW A BTU LOAD OF
 1,052,000 BTU'S BUT MY CALCULATIONS ARRIVE AT 1,154,000
 BTU' S FOR THE 2 PSI LINE WITH THE TWO PATIO HEATERS
 INCLUDED, CLARIFY.
 14) SHT. 3.1 P - THE GAS LOAD CALCULATIONS SHOW
 1,052,000 BTU'S ON THE 2 PSI SYSTEM BUT THE GAS RISER
 SHOWS 880 K. CLARIFY.
 15) SHT.3.1 P - THE PLAN NOTES A DISTANCE OF 180 FT.
 FOR THE 2 PSI SYSTEM BUT MY CALCULATIONS SHOW 170 FT.
 CLARIFY.
 16) SHT. 3.1 P - THE BTU LOAD FOR THE LOW PRESSURE
 SYSTEM SHOWN ON THE PLAN DOES NOT CORRELATE TO THE SUM
 OF ALL THE APPLIANCES. MY CALCULATIONS COME TO 838 K,
 NOT 722K. CLARIFY.
 17) THE LOW PRESSURE SYSTEM SEEMS TO BE OVERSIZED FOR
 THE BTU LOAD WHEN USING TABLE 402.4 (4) AS REFERENCED.
 CLARIFY. HYBRID PRESSURE SYSTEMS SHALL BE SIZED IN
 ACCORDANCE WITH 2014 FGC SEC.402.4.3.
 18) SHOW THE LOCATION OF THE TANKLESS WATER HEATER ON
 THE PLANS.
 19) CLEARLY SHOW ON THE GAS PLANS WHAT IS NEW AND
 EXISTING.
 20) SUBMIT A WATER RISER DIAGRAM FOR ANY CHANGES TO THE
 WATER DISTRIBUTION SYSTEM.FBC 107.1.
 21) ALL GAS EQUIPMENT SHALL BE LISTED AND LABELED PER
 2014 FGC SEC.301.3. SUBMIT SPECIFICATIONS.
 22) SUBMIT CALCULATIONS FOR COMBUSTION AIR. FGC
 SEC.304.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  