Date |
Text |
2016-05-24 13:48:53 | 1) SHT.3.0 P REFERS TO THE 2007 & THE 2010 FBC. THE |
| CODE IN EFFECT IS THE 2014 FBC. REVISE THE NOTES. |
| 2) IDENTIFY THE NEW WAIT STATION ON THE PLAN WHERE THE |
| PLUMBING WORK IS BEING DONE. FBC 107.2.1. |
| 3) THE NOTES REFER TO A PIZZA OVEN BUT I DID NOT SEE |
| THIS LISTED ON THE EQUIPMENT SCHEDULE. CLARIFY. |
| 4) SHOW THE CLEAR INSIDE DIMENSIONS OF THE ACCESSIBLE |
| TOILET ROOM ON THE PLANS. THE MINIMUM WIDTH IS 85 |
| INCHES IF ALL FIXTURES ARE ON THE SAME WALL AND THE |
| ROOM IS BUILT PERFECT. 86 INCHES ALLOWS FOR TOLERANCES. |
| 5) THE LAYOUT OF THE SANITARY AND GREASE RISERS ON SHT. |
| P3.1 P DO NOT MATCH THE PLAN VIEW ON 3.0 P. CLARIFY. |
| 6) SHOW THE TERMINATION POINT OF THE VENT FOR THE MS |
| FIXTURE SHT.3.1 P. |
| 7) SHT. C-1 SHOWS THE NUMBER OF SEATS AS 292 AND ON |
| SHT.3.2 P THE GREASE INTERCEPTOR CALCULATION SHOWS 150 |
| SEATS.CLARIFY. |
| 8) SHT.1.0 A - NOTE #21 REFERS TO THE REPAIR OF |
| PLUMBING IN THE KITCHEN AREA. CLARIFY AS TO WHAT THE |
| SCOPE OF WORK IS IN THE KITCHEN. |
| 9) CLEARLY IDENTIFY THE NEW ACCESSIBLE RESTROOM ON THE |
| PLANS. |
| 10) THE PLANS REFER TO WORK TO BE DONE IN THE LADIES |
| ROOM BUT ARE VAGUE. CLEARLY DESCRIBE THE SCOPE OF WORK |
| TO BE DONE IN THE LADIES ROOM. THE SAME APPLIES TO THE |
| MEN'S ROOM. |
| 11) HOW IS ACCESSED GAINED TO THE THREE WATER CLOSETS |
| IN THE WOMEN'S RESTROOM BY THE THE OFFICE? CLARIFY. |
| 12) SHOW THE GAS LINE ON SHT.3.0 P. |
| 13) THE GAS LOAD CALCULATIONS SHOW A BTU LOAD OF |
| 1,052,000 BTU'S BUT MY CALCULATIONS ARRIVE AT 1,154,000 |
| BTU' S FOR THE 2 PSI LINE WITH THE TWO PATIO HEATERS |
| INCLUDED, CLARIFY. |
| 14) SHT. 3.1 P - THE GAS LOAD CALCULATIONS SHOW |
| 1,052,000 BTU'S ON THE 2 PSI SYSTEM BUT THE GAS RISER |
| SHOWS 880 K. CLARIFY. |
| 15) SHT.3.1 P - THE PLAN NOTES A DISTANCE OF 180 FT. |
| FOR THE 2 PSI SYSTEM BUT MY CALCULATIONS SHOW 170 FT. |
| CLARIFY. |
| 16) SHT. 3.1 P - THE BTU LOAD FOR THE LOW PRESSURE |
| SYSTEM SHOWN ON THE PLAN DOES NOT CORRELATE TO THE SUM |
| OF ALL THE APPLIANCES. MY CALCULATIONS COME TO 838 K, |
| NOT 722K. CLARIFY. |
| 17) THE LOW PRESSURE SYSTEM SEEMS TO BE OVERSIZED FOR |
| THE BTU LOAD WHEN USING TABLE 402.4 (4) AS REFERENCED. |
| CLARIFY. HYBRID PRESSURE SYSTEMS SHALL BE SIZED IN |
| ACCORDANCE WITH 2014 FGC SEC.402.4.3. |
| 18) SHOW THE LOCATION OF THE TANKLESS WATER HEATER ON |
| THE PLANS. |
| 19) CLEARLY SHOW ON THE GAS PLANS WHAT IS NEW AND |
| EXISTING. |
| 20) SUBMIT A WATER RISER DIAGRAM FOR ANY CHANGES TO THE |
| WATER DISTRIBUTION SYSTEM.FBC 107.1. |
| 21) ALL GAS EQUIPMENT SHALL BE LISTED AND LABELED PER |
| 2014 FGC SEC.301.3. SUBMIT SPECIFICATIONS. |
| 22) SUBMIT CALCULATIONS FOR COMBUSTION AIR. FGC |
| SEC.304. |
| |
| PLUMBING PLAN REVIEW |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805-6692 |
| [email protected] |
| |